Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.

Slides:



Advertisements
Similar presentations
ODOT- Office of Environmental Services. Every ODOT project has the potential to create an impact on the public. The public relies on our transportation.
Advertisements

ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Stakeholders and the Public
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
The Building Blocks of Public Involvement Presented By Kevin E. Davis Environmental Supervisor ODOT Office Of Environmental Services The Ohio Planning.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
NEPA ASSUMPTION SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM.
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
U.S. 33 Northern Connector Alternative
Environmental Assessment Public Meeting
ODOT’s New PI Manual Kevin E. Davis Environmental Supervisor Office of Environmental Services.
Surface Transportation project delivery program
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Ohio DOT’s Online CE System Presented by Kevin E. Davis Environmental Supervisor Office of Environmental Services.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
The PDP and Decision-Making
Community Impacts Environmental Justice Public Involvement Categorical Exclusion Training Class.
Guide for Rural Local Officials Evaluating Your Input into the Statewide Transportation Planning Process Developed by the National Association of Development.
UPDATING RIGHT OF WAY MANUALS FLORIDA’S PROCEDURES.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
DEVELOPING PARENT INVOLVEMENT POLICIES Title I No Child Left Behind (NCLB) Section 1118.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
Public Meetings Preparation Type of Meetings Responding to Comments Public Involvement Training Class – Presented by the Office of Environmental Services.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Delivering the Message Public Notification vs. Public Involvement Strategic Communication Public Involvement Training Class – Presented by the Office of.
Public Engagement for Sustainable Transportation Planning: A Brand New Paradigm or the Same Tried and True Approaches Federal Perspectives on Engagement:
Stakeholders Engaging Stakeholders Public Involvement Training Class – Presented by the Office of Environmental Services.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
Raising the Bar: Improving the Roles of the State, MPO, and FHWA in Tribal Consultation Tribal Transportation Planning, Partnering and Consultation James.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
1 1 CEQA Scoping Naomi Feger Planning TMDL Section Leader Region 2.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
PURPOSE & NEED Categorical Exclusion Training Class.
Community Impacts Environmental Justice Public Involvement Categorical Exclusion Training Class.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
Addressing Freight in the Planning and Programming Process presented by Jim Brogan Cambridge Systematics, Inc. July 11, 2001 FHWA Freight Planning Workshop.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Developing a Public Involvement Plan
How to Plan and Conduct Effectively
Delivering the message
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Community Impacts Underserved Populations Public Involvement
Purpose & Need Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
NEPA Assignment Program Overview
Presentation transcript:

Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services

Why? Who Cares??  Public involvement (PI) matters to those that rely on and use transportation systems  Communities have a vested interest in shaping transportation decisions  Every project has the potential to impact quality of life and day-to-day activities  Effective PI enables proactive input and enhances the decision-making process Public Involvement Training Class – Presented by the Office of Environmental Services 2

Why it’s Important  Manages public expectations  Assures appropriate decisions are made  Helps identify and define specific transportation and community needs  Builds consensus via proactive participation  Develops partnerships Public Involvement Training Class – Presented by the Office of Environmental Services 3

Benefits of PI  Communication  Builds credibility, trust and transparency  Increases awareness  Early and continuous  Instills collaboration  Adds value  Required by law Public Involvement Training Class – Presented by the Office of Environmental Services 4

PI Laws and Regulations  National Environmental Policy Act (NEPA)  Section 102 [42 USC 4332]  Council on Environmental Quality (CEQ)  40 CFR and  Federal Highway Administration (FHWA)  23 CFR and  23 CFR  Ohio Revised Code (ORC)  Public Involvement Training Class – Presented by the Office of Environmental Services 5

FHWA Regulations  Planning and Project Development  Metropolitan and Statewide Planning 23 CFR and  Systems-level, corridor, or planning study  Long-range planning Public Involvement Training Class – Presented by the Office of Environmental Services 6

FHWA Regulations  Early coordination  23 CFR  States required to have an approved PI process pursuant to CEQ regulations  Early and continuous opportunities for agency and public participation during project planning and development  Reasonable public notice for all PI activities Public Involvement Training Class – Presented by the Office of Environmental Services 7

Ohio Revised Code  ORC  Provide the opportunity for the public to participate in project development  Adequate and reasonable public notice for all PI activities Public Involvement Training Class – Presented by the Office of Environmental Services 8

Class Objectives  Understand legal requirements  Understand how PI is integrated with ODOT’s Project Development Process (PDP)  Learn when and how to develop a PI Plan  Learn PI methods and techniques  Learn how to effectively engage the public and properly address concerns  Learn how to effectively plan and conduct public meetings and public hearings Public Involvement Training Class – Presented by the Office of Environmental Services 10

Introductions  Name  District/Position  PI experience  Class expectations Public Involvement Training Class – Presented by the Office of Environmental Services 11

ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements Public Involvement Training Class – Presented by the Office of Environmental Services

PI and the PDP Public Involvement Training Class – Presented by the Office of Environmental Services

Project Manager Role  The DEC or District Environmental Staff may act in this role  Ensures the level of PI is commensurate with the project’s type and complexity  Ensures stakeholders and the public are informed appropriately of decisions made  Ensures appropriate opportunities to participate are given  Responsible for executing PI Plan Public Involvement Training Class – Presented by the Office of Environmental Services 14

A Phased Approach  Projects categorized as one of five paths  Each path advances through five phases  PI is “right-sized” within each phase to better support decision-making  Provides flexibility  Appropriate PI activities conducted Public Involvement Training Class – Presented by the Office of Environmental Services 15

PI During Planning Public Involvement Training Class – Presented by the Office of Environmental Services 16

What Do You Think?  What kind of PI occurs during the Planning Phase of ODOT’s PDP? Public Involvement Training Class – Presented by the Office of Environmental Services 17

What Do You Think?  The public is provided information on the need for a transportation project  High level planning and development  Technical information and analysis  Public input helps develop a Statewide Transportation Plan (STIP)  Planning organizations solicit input when developing Transportation Improvement Plans (TIPs) Public Involvement Training Class – Presented by the Office of Environmental Services 18

PI for STIP  Once projects are proposed, the document is released for public review and comment  May include meeting with local and regional stakeholders  Extensive PI activities may be needed  Based on input, a project is programmed and authorized for design activities to begin  PI opportunities continue as a project progresses through NEPA and the PDP Public Involvement Training Class – Presented by the Office of Environmental Services 19

What Do You Think?  What kind of PI occurs during the Preliminary Engineering (PE) Phase?  Starting to develop Feasible Alternatives, first level environmental, design and traffic studies…  May still be trying to define the project problems and rough solutions… Public Involvement Training Class – Presented by the Office of Environmental Services 20

PI During PE  Property owner notification letters, construction notification, etc.  One-on-one/small group meetings  WEB, , social media, etc.  Attendance at regular city/township meetings  Broad PI meetings, workshops, etc. Public Involvement Training Class – Presented by the Office of Environmental Services 21

What Do You Think?  What kind of PI occurs during the Environmental Engineering (EE) Phase?  We have Feasible Alternatives Maybe even a preferred  High level of design - Stage I/II  Now we have: Traffic and environmental data Public/stakeholder needs…  Schedule and budget known Public Involvement Training Class – Presented by the Office of Environmental Services 22

PI During EE  One-on-one/small group meetings  Attendance at regular city/township meetings  Higher level of WEB, , social media, etc.  Broad PI meetings, workshops, etc.  Specific PI meetings/hearings, etc. 23 Public Involvement Training Class – Presented by the Office of Environmental Services

What Do You Think?  What kind of PI occurs during the Final Engineering (FE) Phase?  We have a Preferred Alternative  Detail design is being completed  ROW is being bought  Bid documents are being prepared  Schedule and budget are finalized Public Involvement Training Class – Presented by the Office of Environmental Services 24

PI During FE/CO  One-on-one/small group mtgs.  Attendance at regular city/township meetings  Higher level of WEB, , social media, etc.,  Specific PI meetings 25 Public Involvement Training Class – Presented by the Office of Environmental Services

Minimum PI Requirements Public Involvement Training Class – Presented by the Office of Environmental Services

Level of PI  Minimum requirements are built-in to assure appropriate PI is conducted  Project-by-project  Not interpreted to mean that each project will only require the minimum  The PI approach is commensurate with a project’s type and complexity Anticipated impacts and unusual circumstances may require elevated PI  Ensures legal requirements are met and decision-making is enhanced Public Involvement Training Class – Presented by the Office of Environmental Services 27

Level of PI  Avoid oversimplifying and failing to anticipate the need for PI  Conversely, do not build more into the process than is reasonably needed or required  Be flexible, as it may become necessary to elevate the level of PI  Be proactive (not just reactive)  Consider and address community needs appropriately as a project progresses Public Involvement Training Class – Presented by the Office of Environmental Services 28

Path 1  Traditional maintenance type actions  No right-of-way (ROW) or utility impacts  Include PI conducted per the STIP process  List active projects on district website  Provide contact information  Public Notifications  Standard plan notes executed by the contractor (e.g. construction schedule coordination, detours, roadway closures) Public Involvement Training Class – Presented by the Office of Environmental Services 29

Path 1 Considerations  Internal consultation with specific ODOT divisions may be needed  Consultation may be requested by or needed with local officials or stakeholders  Maintenance of traffic concerns  Minor local controversy  Circumstances may warrant additional PI  Property Owner Notification Letters  Resource Specific PI Public Involvement Training Class – Presented by the Office of Environmental Services 30

Path 2  Involve minor ROW acquisitions  Culvert and bridge replacements  Addition of turn lanes and shoulders  Property Owner Notification Letters  If impacted by the project Access restrictions, ROW acquisition  Counts as a PI activity Not just right-of-entry notification  Stakeholder Consultation  Public Notifications Public Involvement Training Class – Presented by the Office of Environmental Services 31

Path 2 Considerations  Consultation with specific ODOT offices may be needed  Consultation may be requested by or needed with local stakeholders  Maintenance of traffic concerns  Minor local controversy  Circumstances may warrant additional PI  Resource Specific PI Section 106, Noise, or Aesthetic Design Public Involvement Training Class – Presented by the Office of Environmental Services 32

Path 3  Involve a higher level of complexity  ROW acquisition/minor utility impacts  Can be Non-Complex or Complex, depending on the range of technical issues and impacts  Property Owner Notification Letters  If impacted by the project  Counts as a PI activity  Potential exists for increased contact with property owners Public Involvement Training Class – Presented by the Office of Environmental Services 33

Path 3  Stakeholder Consultation  As appropriate  Press Release  Public Notifications  May require a higher level of District PIO involvement than for a Path 1 or Path 2  May include project updates via list, direct mailings, fliers, as appropriate  Public Meeting, as appropriate Public Involvement Training Class – Presented by the Office of Environmental Services 34

Path 3 Considerations  Complex Path 3 projects generally require preparation of a Feasibility Study  Stakeholder consultation occurs at the completion of the Feasibility Study  Stakeholder consultation occurs at the completion of an AER (if needed)  Stakeholder meetings may be held prior to presenting Feasible Alternatives to the public  Comments received are addressed as the project continues through the PDP Public Involvement Training Class – Presented by the Office of Environmental Services 35

Path 4/5  Involve complex roadway/structure work  May add capacity  May involve substantial utility and ROW impacts or relocations  Typically involve multiple alternatives  Property Owner Notification Letters  If impacted or as appropriate  Counts as a PI activity  Increased contact with property owners Public Involvement Training Class – Presented by the Office of Environmental Services 36

Path 4/5  Stakeholder Consultation  More involvement than Path 2 or Path 3  Press Release  More numerous and specific in nature  Potential for local media attention  Public Notifications  Greater emphasis on providing project updates via list, direct mailings, fliers, newsletters, surveys, etc.  Use of social media more prominent Public Involvement Training Class – Presented by the Office of Environmental Services 37

Path 4/5  Public Meetings  Open House or Formal meeting format recommended  Open mic strongly encouraged for higher level CEs; required for EAs and EISs  Public Hearings are required for Path 4/5 projects that are an EA or EIS Public Involvement Training Class – Presented by the Office of Environmental Services 38

Path 4/5 Considerations  Stakeholders are given an opportunity to review Feasibility Studies and Alternative Evaluation Reports (AERs)  Stakeholder consultation typically occurs after completion of the Feasibility Study and the AER Public Involvement Training Class – Presented by the Office of Environmental Services 39

Summary  District Environmental Staff, the PM and the Project Management Team ensure the appropriate level of PI is conducted  The level of PI is commensurate with a project’s type and complexity  Anticipated impacts and unusual circumstances may require elevated PI Public Involvement Training Class – Presented by the Office of Environmental Services 40