1. 2 1-Meter Cross-Coil Prototype The mechanical design was driven by two primary requirements; to Improve the mechanical precision in the placement and.

Slides:



Advertisements
Similar presentations
3D Printing Change this title.
Advertisements

Fiber Reinforced Plastic beam manufacturing process
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
TOOLING. WHAT IS REQUIRED OF THE TOOL? support weight of the part support weight of the part maintain structural integrity and dimensional stability following.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
WRITTEN POLE TECHNOLOGY
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Micromachining of Inertial Confinement Fusion Fast Ignition Targets Michael Mauldin.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Printed Circuit Board Design
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Status of the Polarized 3He Target
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
UXO UXO is an ongoing project to field an electromagnetic detector system capable of finding and identifying unexploded ordnance ( bombs and bullets )
Concept Design Review THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI April 24, 2008.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Magnet designs for Super-FRS and CR
1-Meter Cross-Coil Prototype The mechanical design was driven by two primary requirements; to Improve the mechanical precision in the placement and alignment.
LASER AND ADVANCES IN METROLOGY
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Design Progress Allen Ellis 18-September
VXD Mechanical R&D at the University of Washington H. Lubatti, C. Daly, W. Kuykendall LCRD in conjunction with Fermilab, SLAC.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Lightweight UXO system Concept design For Berkeley Geophysics Concept design For Berkeley Geophysics.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Magnetic field due to an electric current
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
The MesoMill™ An Off-The-Shelf Small Milling Machine By Roger Cortesi MIT Precision Engineering Research Group.
CLAS12 Drift Chamber Prototyping
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
LARP Collaboration Meeting Racetrack Coil Fabrication
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
1 HFT Wieman 11/6/ Outline  Development Status uMIMOSTAR pixel detectors uMIMOSA5 Electronic Readout uLadder mechanics uBeam pipe  Interface.
1 A TECHNICAL BRIEFING FOR AMATEUR RADIO OPERATORS “SLOT ANTENNAS: WIRE RECIPROCITY” PRESENTED TO: ARASWF NAPLES, FL FEBRUARY 2016 PRESENTED BY:
TRIO-CINEMA 1 UCB, 2/08/2010 End of Summer Review Kevin Jenkins Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
October, 2001 Hybrid Spectrometer for Single Crystal Studies at the Pulsed SNS: an update. n Principal features of the proposed hybrid spectrometer. n.
ADVANCED PANELMACHINE TYPE ROLLER PRESS CLASSIC LINE THIS IS THE ORIGINAL PRESENTATION WHICH WAS HANDED OVER BY MDI TO THE BUYER OF THE PANELMACHINE IN.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
NATIONAL CONFERENCE ON RECENT ADVANCES IN COMPOSITES M.SURENDER NATH INNOVATIVE FRP SYSTEMS PVT LTD PANNAMGADU, TADA 16/06/2012 Composites For Wind Energy.
Vertex Detector Mechanical R&D Design Questions and Issues
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Magnet Options Forward dipoles vs. forward solenoids
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Presentation transcript:

1

2 1-Meter Cross-Coil Prototype The mechanical design was driven by two primary requirements; to Improve the mechanical precision in the placement and alignment of the coil elements, and, to provide a robust, integrated instrument package appropriate for field testing. Receiver coil arrays Z coil pair X coil pair Y coil pair Assembled instrument

3 The 1-Meter Prototype currently under construction integrates precision winding forms and assembly features with structurally efficient panel assemblies Coil form assembly prior to winding the transmitter coils. Panel construction concept showing indexing features and assembly exploded view Coils are shown here as an example of the final coil location after assembly. The X and Y coils are actually wound onto the assembled cross panels as a sub- assembly Z transmitter coils and Receiver arrays are wound and assembled as separate panels..

4 The Receiver coils are wound on mandrels that become integrated into panels that includes electrostatic shielding. The transmitter coils are wound on machined coil forms as matched pairs. X and Y coils are wound in place on the assembled coil forms The panels are assembled into the instrument cube using indexing features machined to insure robust alignment and stability. Receiver panel Z transmitter panel X transmitter pair Wound as mirror-image duplicates Z transmitter panel Receiver panel Y transmitter pair Wound as mirror-image duplicates

5 Electrostatic shielding is integrated into each coil panel unit during panel fabrication. Core and skin materials are non- conductive and non-magnetic. Shields are etched copper on kapton and are applied to the panel skins. The final package is an integrated panel with the coil elements locked in their relative positions. Transmitter panels are assembled in similar fashion with the coils wound directly onto machined surfaces in the panel coil form..005” thick shields on the outer panel skins Receiver coil on mandrel Skins and Core Cutaway view of a Receiver panel

6 The field test configuration features a light weight carriage assembly With provision for GPS antenna and calibration hardware.

7 Here, the carriage assembly is shown without the detector coil. The GPS antenna is shown in it’s relative location. The Field-ready cart concept including bumpers, electronics and laptop computer. The electronics were later moved inside the beam structure. There is also a ‘tailwheel’ option not shown here

8 Proof-of-concept model parts have been cut by waterjet and are being dry-fitted into coil form sub assemblies. Here, the X and Y Transmitter assembly is being wound

9 The transmitter assembly is complete and is wired into the field electronics for check out and diagnostics Meanwhile, the Receiver panels are getting their last internal hookups before being laminated into structural panels. In this picture, the receiver coils are embeded in the foam panels. The shield circuitry is being completed. The next step willl be to add skins and laminate the assembly to become the receiver panel.

10 A word about the process….. Design around the Waterjet process allowed several huge advantages including speed, cost, and accuracy. It also allowed rapid iteration at modest cost. The simplicity is illustrated here. Pre-laminated composite panels are cut to precise profiles on the Waterjet. Parts are immediately available for dry-fit and tolerance checks. Assembly follows with parts snapped into place and epoxy bonded. No fixtures or tooling was used.

11

12