AMIT Update to RMS May 16, 2012 Andrea O’Flaherty SMT Project Manager
Overview & Contents Schedule Update Large Volume Ad Hoc Usage API Request Third Party 2AMIT Update to RMS - May 2012
Schedule Update AMIT Monthly Stakeholder Steering Committee Meeting for May is canceled Monthly Stakeholder Steering Committee Meetings will be held following RMS Lunch Break – Beginning in June Schedule is updated and is found online at: ectric/34610/34610.aspx AMIT Update to RMS - May 20123
Large Volume Ad Hoc Usage API Request Background The intended use of the Adhoc APIs is to retrieve the usage data from SMT for a specific set of ESIIDs for certain duration. This data is provided in CSV format. The vehicle for building history is the LSE usage files sent daily via FTP for all the ESIIDs belonging to each ROR. Recently there have been multiple requests to backfill the entire historical data for all the ESIIDs by a few RORs. Large requests, using the previous API sizing, have been observed impacting system performance. The API Usage request/call sizing has been redefined and is documented in the API guide AMIT Update to RMS - May 20124
5 Large Volume Ad Hoc Usage API Request Number of ESIIDs (per API Call) Number of days (per API Call) Number of API calls per day Max Estimated Response Time per API Call hours hours hours hours hours How to Read the Table: A ROR would be able to raise one of the set of calls per day: 20 calls containing maximum 1 ESIIDs for the 365 days of data OR 20 calls containing maximum 10 ESIIDs for the 20 days of data OR 20 calls containing maximum 50 ESIIDs for the 5 days of data OR 10 calls containing maximum 100 ESIIDs for 2 days of data OR 10 calls containing maximum 200 ESIIDs for 1 day’s data
Large Volume Ad Hoc Usage API Request Notes: The maximum number of ESIIDs per call = 200. Exceeding the parameters in the table (see table 3) may result in call being removed from queue. Notification will not be provided if this occurs. If a ROR needs to make a large call for historical data that exceeds the above guidelines, it needs to submit a change request with AMIT at 10/34610.aspx. 10/34610.aspx Send to the Smart Meter Texas JDOA PM for the request to be considered. AMIT Update to RMS - May 20126
PWG Focus – Remaining SMT BRs This includes (in no special order): On Demand Request* Enhanced Format Third Party One-Time LOAs SMT Mobile Application HAN Status Report Consumer Green Button Federation Content Management Approaches & News Flash, FAQ, Twitter Meter Exchange Ad Hoc Report Generation Header HAN Status TDSP De- Provisioning with Reason Code On Demand Power Status AMIT Update to RMS - May * CNP supports ODR for REPs today
Remaining SMT BRs Timeline Story Boards - May and June Prioritization - June, July Estimation – June, July Re-Prioritization as Necessary – July Scheduling for Development and Deployment – June, July Design, Build, and Deploy – June – December AMIT Update to RMS - May 20128
Projects Working Group Holding Web Ex Meetings every Friday from 9- 11:00 am Purpose of the meetings is to work through BRs and Storyboards – finalize, send to Stakeholder Steering for approval Will be holding a one-day special Third Party Workshop on May 22, ERCOT AMIT Update to RMS - May 20129