The London Ambulance Service Case. The Manual System 999 call to BT Call switched to LAS call takers –Record details & map reference onto a form Send.

Slides:



Advertisements
Similar presentations
Lesson Learned from AUDMP/ NSET-Nepal NSET-Nepal AUDMP Working Group Meeting, Bandung Shiva Bahadur Pradhanang Ramesh Guragain 21 March.
Advertisements

Renewable Energy Projects Financing Issues David A. Perlman Managing Director Fieldstone Private Capital Group, Inc. January 19, 2007.
The New Landscape - Transforming Commissioning. Agenda The likely impact of the White Paper on the commissioning landscape The NHS London Commissioning.
Week 1 (2) 2008IS33 IS Failure Cases 1 COMP3470 IS33 People-Centred Information Systems Development Week 1 : Lecture 2 IS Failure Case Studies School of.
Lessons Learned SHI Cable Installer Fall from Scaffolding – 28 September 2005.
©Ian Sommerville 2004Software Engineering Case Studies Slide 1 The London Ambulance fiasco l The London Ambulance Service (LAS) Computer Aided Despatch.
The Failure of the London Ambulance Service Michael McDougall CIS 573 November 16 th, 1999.
1 An Investigation into the Development of a Computerised Information System for NHS Physiotherapy Services in England Dr Robert J. Jones East Sussex Hospitals.
Managing Innovation in Educational Organisations Andy Hockley, Hox & Erix SRL Quest Conference, Iasi June 2009.
1 The Role of Maori Accountants in Maori Economic Development An External Perspective John Spencer Chairman, Tainui Group Holdings.
Methods: Deciding What to Design In-Young Ko iko.AT. icu.ac.kr Information and Communications University (ICU) iko.AT. icu.ac.kr Fall 2005 ICE0575 Lecture.
Introduction to Risk Management 26 September 2014 Peter Fowler CPPD.
Change Management Any change is likely to cause discomfort to the people that are affected the most. As a result they are likely to react in some way.
COSRA Conference Meeting with the Colombian Securities Authority 2 September 2005 Integration of regulatory bodies Joe Traynor & Mike O’Hagan Finance,
Data-Sharing and Governance Consultation ANALYSIS OF RESPONSES.
1 No Silver Bullet : Inherent Limitations of Computer Security Technologies Jeffrey W. Humphries Texas A&M University.
Human Factors in System Design A Case study by P Beynon-Davis
Managing Change People change what they do
SWE Introduction to Software Engineering
Dr Dominique Allwood Public Health Registrar
Topic 10Summer London Ambulance System Some of the slides created by Sommerville.
 In the last lesson we looked at managing change.  A part of the lesson looked at the importance of staff and their views.  This lesson will focus.
2 Management Governance The New Frontier 3 Shareholders & Stakeholders Board Management (through CEO) Delegation Reporting.
The London Ambulance fiasco
ISB-4 Internal trigger1 INTERNAL TRIGGERS Internal triggers to the internatiomalization process Shaping an international vision and mindset Organisational.
DOC’s Changing World Avon Adams Manager, Communications.
Change Management Stephen Njuguna
Setting Up a Group chapter 5. Setting Group Demands -Planning -Organisation -Judgement -Problem- solving -Willingness to look for creative solutions.
Learning about Safe Systems Dr. Maureen Baker CBE DM FRCGP Clinical Director for Patient Safety NHS Connecting for Health.
Information Security Governance 25 th June 2007 Gordon Micallef Vice President – ISACA MALTA CHAPTER.
Steve Jones, SHEQ Manager (Emergency & Critical Services)
Workplace Bullying Moving On…… Tullamore Court Hotel March 10 th 2007.
The Broad Context of Change Modernising Medical Careers (MMC) (reduction in time to consultant post) Government Targets for Elective Surgery European Working.
9/12/2015Dr Andy Brooks1 Lecture 3 London Ambulance System (LAS) 26 & 27 October and November FOR0383 Software Quality Assurance.
Mark Piekarz, Ian Jenkins and Peter Mills
Leadership Dr John Edmond 5 th July Why? Interviews Complex medicine Bristol Inquiry = 9 mentions of “leadership” in summary alone. Mid Staffs Inquiry.
Focusing and integration PEM reforms to ensure they ‘matter’ Bank work in Armenia, 2005 Matthew Andrews ECSPE.
Micromanagement What it is? Why does it occur How do we change course?
The Rail Safety Summit  2015 RAIL SAFETY SUMMIT 2015.
De-escalation Training Pack Section 1 Introduction and scene setting.
1. Have detailed Job descriptions, they provide job clarity to the subordinate, a clarity of expectation to the manager and improve performance in the.
1 Institute for Software Research, International Methods of Software Development Problem Frames 3 (This lecture is largely based on material graciously.
International Section | Leadership & Management Division | College of Management and Technology 22. Leading Change SLP(E) Course.
Relating to the Public.
Health Emergency Risk Management Pir Mohammad Paya MD, MPH,DCBHD Senior Technical Specialist Public Health in Emergencies Asian Disaster Preparedness Center.
© Cambridge University Press 2012 AREA OF STUDY 2 UNIT 4 MANAGING PEOPLE AND CHANGE THE MANAGEMENT OF CHANGE.
Accelerating Implementation Methodology: key points Planned, conscious, skilled enterprise Engage ALL stakeholders - Targets, Agents, Sponsors & champions.
CANADIAN COAST GUARD AUXILIARY - PACIFIC PRINCIPLES OF PRESENTATION CANADIAN COAST GUARD AUXILIARY - PACIFIC 2008.
Project management Topic 4 Starting up a project.
Kaizen Costing. Kai Change Zen Better Change for Better.
Improving Lives in Our Communities Leading through the CQC Inspection Process.
Presentation Topic What future is there for practitioners when training time is being reduced and e-learning is being advocated to reduce staff absence.
International Section | Leadership & Management Division | College of Management and Technology 19. Challenge of Change SLP(E) Course.
Introducing mandatory training systems? Investigating the introduction of compulsory pre-site construction training Dr Susanne Bahn and Dr Llandis Barratt-Pugh.
Presentation to Leadership Forum Change Leadership and Management David Keenan Chief Executive Officer SDRC.
You must do better: The Need for Professionalism in Computing Blay Whitby Lecturer in Computer Science and AI School of Science and Technology University.
6/27/20161 Interviewing Chapter Section Objectives Identify methods of preparing for interviews, including researching and rehearsing Recognize.
8 March 2016 CORPORATE GOVERNANCE IN THE HEALTH SECTOR In association with.
Strategic Change.
This is an automatic power point show lasting about 12 minutes
Creating a Mentoring Culture: What Leaders Need to Know and Do
IT 262 PRINCIPLES OF MANAGEMENT
VP, Institutional Services
BUSINESS AND MANAGEMENT
Reorganization: Braving the Organizational Change
The Accident On October 26th 1992 the London Ambulance System failed.
IT Budgeting.
WHAT CAN WE LEARN FROM COMPLETED SARS?
The role of Supreme Audit Institutions in fragile situations: initial findings Research by David Goldsworthy and Silvia Stefanoni of Development Action.
The London Ambulance fiasco
Presentation transcript:

The London Ambulance Service Case

The Manual System 999 call to BT Call switched to LAS call takers –Record details & map reference onto a form Send form by conveyor belt to allocator –Allocate ambulance based on availability & location Pass form to despatcher –Ring station or radio ambulance

LAS Computer Aided Despatch: LASCAD Project Automate or support: –Call taking & gazeteer –Tracking of vehicles –Allocation & mobilization of resources to incidents –Ambulance resource management –Provision of management information

LASCAD 1980s IAL project scrapped in 1990 at a cost of £7.5m & moved to litigation 1989/1990 ambulance strike; new CEO John Wilby appointed 1991 Systems Options £1.1m bid accepted 1992 trials failed Oct implementation collapsed in chaos –headlines of 30 deaths; Wilby resigns; public inquiry ordered

LASCAD Page Report –Total management failure; chairman resigns –Continue with CAD – probably take 4 years –Needs total ownership by management & staff; controllers & crews 1994 LAS board scrapped; RHA takes over; new CEO & IT Director 1994 – improvements in IT infrastructure 1994 – Nasima Begum dies (53 minute wait) –Another inquiry

LASCAD Wells Report –Continuing management weakness –Poor staff training; high absences; poor shift changeover; lack of technology 1995 on – gradual implementation of sub-systems 1996 – received NHS trust status 1997 – BCS award 2003 – still implementing sub-systems

Technology Problems Changes in ambulance design –Introduction of fixed bulkhead –Privacy vs. safety LASCAD –Over-ambitious –Bought cheap - unreliable, inefficient (Windows 3.0), –Not properly tested & debugged; poor training –Awful project management –=> ‘inevitable’ disaster

Public Sector Managerialism Cost-efficiency paradigm Importance of technology & targets Constant reorganisation – managers laid off – 800 years of experience walked Culture changes from military to managerial Change in evaluation targets –Increased responsibility to call takers – prioritising calls Frequent changes in senior managers

Industrial Relations, Power & Status Ambulances seen as low status service Legacy of strike Autonomy & behaviour of crews –Sabotage in 1992? Changed status of call takers London is different Mixed resistance & enthusiasm for change Constant feeling of anxiety

LAS Improvisation Need to improvise in a very complex situation –Numerous stakeholder groups; All snapping at each other; vulnerability of senior management Introduce IS little by little LAS Golden Circle – development method –Only those within the circle could participate Failure to confront the crews –Fear of sabotage; continuing industrial relations problems

Quotes “… there is nothing more difficult to arrange, more doubtful of success & more dangerous … than initiating change” Machiavelli “A strike is a social phenomenon of enormous complexity… never susceptible to complete description, let alone complete explanation” Gouldner

Conclusion: Need for Understanding Long & complex story –IT is often a small part –Human cost rather than financial –The story continues …. Recognition of the importance of: –The changing business, organisational & social context –Multiple stories; People, moods & cultures Fitzgerald & Russo article –1992 vs – a bit too black & white? Understanding is constrained by the frame of reference of manager/researcher