14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
THE RADIO FREQUENCY SYSTEM FOR SOLARIS TOWARDS OPERATION
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
SESAME Storage Ring RF-System
RF SYSTEM DESIGN FOR THE TOP-IMPLART ACCELERATOR V. Surrenti, G. Bazzano, P. Nenzi, L. Picardi,C. Ronsivalle, ENEA,Frascati, Italy ; F. Ambrosini, La Sapienza.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Anders Sunesson RF Group ESS Accelerator Division
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
February 2010 ALBA Synchrotron Light Source Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Other Utilities of ALBA LLRF
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
Performance of the cERL LLRF System Takako Miura (KEK) LLRF'15, Shanghai, Nov 4, 2015 (T. Miura) 1 Compact ERL (Energy Recovery LINAC)
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
ALBA RF Systems Francis Perez.
LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Status of the ELETTRA RF Plants
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Status and New Developments of RF Systems of ALBA
352MHz Klystron Control for the 3MeV Linac test stand
BEPCII RF POWER SOURCE AND INPUT COUPLER
LLRF and Beam-based Longitudinal Feedback Readiness
An overview the ASTRID2 storage ring and its RF system
CEPC RF Power Sources System
Advanced Research Electron Accelerator Laboratory
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
RF systems introduction
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status of the ASTRID2 RF systems
RF introduction Anders Sunesson RF group leader
Status and New Developments of ALBA RF Systems
Presentation transcript:

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 2/28 The RF Group: Paco Sanchez Angela Salom Bea Bravo (since Oct. 2009) Support Engineering Division Support Computing Division Support Operators Group

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 3/28 ALBA overview and status Booster RF System Storage Ring RF System Next

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 4/28 Synchrotron Light Source in Cerdanyola (Barcelona, Spain) December 2009

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 5/28 ALBA Accelerators LINAC 100 Mev BOOSTER 100 MeV – 3 GeV STORAGE RING 3 GeV

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 6/28 Booster commissioning started: - 2 weeks in January - 2 weeks in July - Afternoons since Monday SR installation completed. Some testing of subsystems pending. SR commissioning starts November 2010 without IDs. SR commissioning with IDs by March st beam for beamlines commissioning April 2011

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 7/28 “Stored Beam 100 MeV”: RF ON 5 seconds, 5 injections BOOSTER COMMISSIONING

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 8/28 1 st Synchrotron Light in Spain BOOSTER COMMISSIONING

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 9/28 90 % Energy and 70% current of nominal values 2.7 GeV with 0.7 mA BOOSTER COMMISSIONING January 2010

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 10/28 Booster RF System

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 11/28 Booster Transmitter Spring 2009: DC Commissioning (with Thomson) Oct - Nov 2009: RF Power Commissioning (with Thomson) -RF shutter closed and full RF power on load- SAT passed on November 5 th, 2009

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 12/28 Booster Cavity November 2009: Cavity installed and aligned Vacuum OK Cabling and Sensors installed Water cooling connected Air cooling (RF window and WATRAX) EPS and interlock OK

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 13/28 Booster LLRF: Conditioning and Calibration Nov – Dec 2009: Full RF Plant ready Tunnel closed ( Operation in parallel with the Bo PS testing) 60 kW in the cavity (35 kW used during Booster commissioning) Calibration done

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 14/28 LLRF: Automatic Start up Feb 2010: After the experience during the Booster commissioning To easy the recovery after a trip To avoid operator errors Automatic Start up: Stored Beam: RF ON

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 15/28 RF Power Automatic Start up: - After a trip LLRF set all parameters to minimum: - Low RF drive - Disable tuning - Open loops (I&Q) - Operator reset the interlock and switch on the transmitter - LLRF detect the presence of RF power at cavity input - LLRF tune the cavity before allowing high power - LLRF close the loops and check loops stability - Smooth power increase - Message RF ready for beam Tuning pulses Plungers direction

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 16/28 Storage Ring RF System

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 17/28 Layout 6 cavities Digital LLRF RF Voltage3600kV TRANSMITTER Tube typeIOT Number6 x 2 IOTs Power2 x 80 kW CombinationCaCo

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 18/28 SR Transmitters March - September 2010: RF Commissioning (with Thomson) 12 SR transmitters has passed the SAT Details by Paco Sanchez

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 19/28 SR Dampy Cavities April 2009 to January 2010 Conditioning at RF lab

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 20/28 SR Dampy Cavities All 6 performing well Installed and bake-out in situ Alignment, cabling and cooling ready

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 21/28 Waveguide system: Circulator problems Ferrite Inc. (USA) Control by minimising the VSWR: - Measure forward and reflected power - Compute VSWR - Act on the PS of the circulator Problems during cavity conditioning: Pulsed conditioning:No responding due to slow control CW conditioning: During autotune it changes slightly the IOT load, i.e. IOT power, so sudden increase of power to the cavity and (ussualy) a vacuum trip.

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 22/28 Waveguide system: Circulator problems Solution: Condition the cavities with the circulator on Manual Mode (no very convenient, but ok) In addition we have to send a circulator back to Ferrite since it was wrongly adjusted to cope with 160 kW of power. Bias current drift

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 23/28 Digital LLRF System All modules installed: Analogue Front ends Amplitude and Phase Control Loop Tuning loop Timing system RF detectors Arc detector Fast Interlock Modules (FIM)

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 24/28 Conditioning and Calibration June – September 2010: All RF Plants ready Cavities: Four cavities conditioned up to 70 kW One cavity under conditioning this week Last cavity under cooling reparation (flowmeters) Calibration on going

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 25/28 NEXT: Linac RF pulse digitalisation: … CaCo improvement: See Bea presentation ALBA commissioning: Linac + Booster + SR + Beamlines

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 26/28 RF Linac Pulses Characteristics RF Frequency: 500MHz & 3GHz Pulse width: 4μs Repetition rate: 1Hz – 3Hz Available RF Signals Fw PB1, FwPB2 & FwB, FwK1 & FwK2, FwAS1 & FwAS2 Linac RF pulse digitalisation

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 27/28 Front End Downconversion of 3GHz signals to 500MHz (IF) LO: 3.5GHz Digital Board 8 ADCs and Virtex-4 IF signals undersampled at 80MHz Amp & Ph information to CS Control System (CS) At present: Manual Phase adjustment of RF signals Next Step: Automatic phase adjustment First Tests (4us pulse) Amp Error: 0.2mV pp Phase error : 0.6º pp Pulse 4us Amplitude Resolution Phase Resolution

14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 28/28 Thank you