Baldwin Wallace College (Berea, Ohio). Two KN20 boilers installed to replace old atmospheric cast iron boilers. KN boilers are true cast iron sectional.

Slides:



Advertisements
Similar presentations
Boilers & Thermic Fluid Heaters
Advertisements

1 BOILERS AND EFFICIENCY Gary Archer Vice President of Sales JW Stevens Co.
HVAC523 Heat Sources.
HVAC 11a CNST 305 Environmental Systems 1 Dr. Berryman
Plumbing 101 for Property Managers Presented by: [Put your name here] Welcome to... [Delete these logos and put your logos here]
Triangle Tube Boiler Fuel Cost Savings Worksheet Prepared for: Customer Name: Street: City, State, Zip: Day Phone: Evening Phone: Cell Phone:
Common Boiler Installation Problems
Energy Efficient Steam Systems
Central Heating (Pipework Only). Forced circulation through loop pipework only Central Heating – One pipe system Central Heating – Types of systems (Part.
The value in mechanical & electrical retrofits What Pays and what Doesnt? What Pays and what Doesnt? June 16, 2011 June 16, 2011 Mark Kesseler Mark Kesseler.
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
AQ2511B0 Boiler Reset Panel – for Whole House Heating Control – Immediate Retrofit Opportunity !
PARKER BOILER PARKER BOILER HOT WATER PIPING SYSTEM 1. 3 way valve and O.S.A. reset. 2. Single boiler piping schematic. 3. Single boiler with 3 way valve.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Energy Efficient Steam Systems. Steam Systems Steam systems most widely used type of process heating Advantages of steam: –Heat carrying capacity of steam.
Superheaters.
The Mondial Forni Mondial and Ecomondial steam tube fixed deck ovens, gas or gasoil heated, are composed of independent decks with standard working height.
STEAM BOILERS SUBMITTED TO: Mr. Ankit Soni Assistant Prof. Mechanical Dept. SUBMITTED BY: Mukul Dev Kushwah 0903ME Dec
Presented by: Terry Stohs Viessmann Manufacturing Company Inc.
Section 16.3 Using Heat.
Engineer Presentation
Unit 206: Domestic hot water systems
Hydrotherm’s NEW KN Series
Pioneer Church Solon, Ohio
Westbrook Apartments BOILER REPLACEMENT ASSESSMENT AND PROPOSAL AUGUST 2007.
STEAM HEATING.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Charleston Towers West Virginia BOILER REPLACEMENT ASSESSMENT AND PROPOSAL AUGUST 2007.
PLUMBING Presentation on Central Heating. Forced circulation through loop pipework only Central Heating – Types of systems (Part 1) - One pipe system.
© 2011 Rinnai America Corporation TANKLESS WATER HEATING TECHNOLOGY For Commercial.
Steam System Operation and Distribution System Optimization Affordable Comfort National 2013 Denver, Colorado.
STUDY OF BOILER’S ACCESSORIES
HVAC523 Basic Subsystems.
Unit 208: Central heating systems
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Practical Energy Conservation Tips for Steam Propulsion Ships.
COMMERCIAL BOILERS. HIGH MASS Advantages Flow Indifferent Primary Piping Resistant to low return temperature issues Up to 1200 H.P. 20 plus year life.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
STUDY ON HVAC SYSTEM STUDY ON HVAC SYSTEM
Section 3 Using Heat.
Heat engines played a key role in the development of the modern industrial world. Steam locomotives were an important early use of the steam engine. Electric.
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
ENGR 2213 Thermodynamics F. C. Lai School of Aerospace and Mechanical Engineering University of Oklahoma.
System Components Let’s take a look at the Spacepak System Components.
Barford Power Station St Neots Community College Sixth Form Visit, May 2008.
THERMAL POWER PLANT.
1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.
Condensing Hydronic Heat Exchangers Make-Up Air Units Meets.
BOILER MOUNTINGS & ACCESSORIES
Series Loop Concept Adv Dis.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
ClearFire-LC Hydronic Boiler Solution. ClearFire Family Capacities from 400 to 12,000 MBH 2 ClearFire-H - Steam ClearFire-C - Condensing ClearFire-V -
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
Fluid Statics/Dynamics
Exhaust Heat Recovery Systems
Boiler Room Atmospheric Boiler Power Boiler.
Presented By: Jim Lombardo Herbert & Conway, Inc.
Boilers & Thermic Fluid Heaters
DOMESTIC HEATING DESIGN PRINCIPLES
Outcome 1 (part 1) Types of domestic central heating systems installed in domestic dwellings Unit 208: Central heating systems.
Hot Water Systems Cylinders and Systems.
______________ Combustion Engine
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
THERMAL ENGINEERING BOILERS
Presentation transcript:

Baldwin Wallace College (Berea, Ohio)

Two KN20 boilers installed to replace old atmospheric cast iron boilers. KN boilers are true cast iron sectional boilers packaged to fire at fully condensing efficiency (up to 99%). They have no minimum return temperature requirements. The KN boilers exceeded the colleges expectations in durability (cast iron) and efficiency with the ability to reset the building down into the 90F range where they fire well into the 90% efficiency range.

Lake Catholic High School (Mentor Ohio)

Three KN20 boilers installed to replace two old Bryan atmospheric flex tube boilers. KN boilers are effectively heating the school with a fraction of the capacity compared to the old boilers. The KN boilers provided a way to reset the building down to 85F without the use of a 3 way valve needed in the old system. Boiler were piped with sealed combustion eliminating the need for a large make up air louver.

Project freed up much of the boiler room. Eliminated nearly all of the stand by losses from the old boilers. Large combustion air louvers were converted to a usable garage door / loading area. Bypass loops or primary secondary piping was not needed, cleaning up piping too! This was a very impressive installation.TODAYTODAY OLD BOILERS

Kirtland Country Club (Kirtland, Ohio)

Two KN10 boilers were installed to replace this old Peerless Cast Iron sectional steam boiler. The building was converted to hot water and the KN boilers provide capacity for the building heat, the pool heater, and the domestic hot water system. In addition, RME supplied the domestic hot water system, System pump VFD drives, an Exhausto vent system, and a new pool heater for the project.