2X800 MW, YERMARUS HIGH PRESSURE HT COMPLETED ON 25.09.2015 IN THE PRESENCE OF JOINT DIRECTOR OF BOILERS KARNATAKA.

Slides:



Advertisements
Similar presentations
Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
Advertisements

TO PRESENTATION ON SUPERCRITICAL BOILER
Reheater Protection Logic
CHEMICAL CLEANING OF PRE-BOILER SYSTEM
SIPAT SUPER THERMAL POWER PROJECT
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
FUEL OIL SYSTEM
Steam (Vapour) Power Plant Rankine cycle Power Plant
Power Generation OBJECTIVE To examine vapor power plants in which the working fluid is vaporized and condensed.
Boiler FGT HRSG Coal Air To CO 2 - extraction Ash Power.
ENERGY EFFICIENCY IMPROVEMENT in Refineries and Petrochemical Plants.
1. Cooling tower. 2. Cooling water pump. 3. Transmission line (3-phase). 4. Unit transformer (3-phase). 5. Electric generator (3-phase). 6. Low pressure.
Numbers
CWS 70ºF CWR 80ºF Cooling Tower Humid air Out with heat Dry air In Central Energy Plant A/C Unit Work EMCS 404 Chilled Water Supply 40ºF Chilled Water.
1 Acetone, 2-Propanol H 2 Acetone 2-Propanol L2 Acetone, 2-Propanol L201 L101L1 L3 L4 L10 L9 Condenser Reboiler Distillation Column Endothermic Reactor.
Note that I broke the recycle after the boiler. While not really necessary, it does make life easier. I used three design specs in this problem. The closed.
ANY PIPE CONNECTION TO THE TURBINE IS A POTENTIAL SOURCE OF WATER EITHER BY INDUCTION FROM EXTERNAL EQUIPMENT OR BY ACCUMULATION OF CONDENSED STEAM.
POWER GENERATION TECHNOLOGIES
WELCOME TOPIC- STEAM BLOWING ADANI POWER MAHARASHTRA LTD,TIRODA,
STEAM BOWING PROCEDURE OF STAGE # 1
Adani Power Limited Power Business Goal - 20,000 MW
Welcome.
ENTC-370PROF. ALVARADO1 LAB 8: Steam Turbine (Rankine Cycle Experiment) ENTC
AN OVERVIEW PROF. D.N. REDDY DIRECTOR CENTRE FOR ENERGY TECHNOLOGY UNIVERSITY COLLEGE OF ENGINEERING OSMANIA UNIVERSITY.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
STEAM POWER PLANTS.
Boilers Different Types Lata Grover. Overview Classification by Structure Classification by Heating Method Classification by Pressure Further Information.
ENGR 2213 Thermodynamics F. C. Lai School of Aerospace and Mechanical Engineering University of Oklahoma.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
BHEL PSSR YERMARUS 2X800 MW - UNIT I ASSEMBLY OF MEMBRANE IN RODM
Security head welcoming Site In-charge, Kakatiya site for Flag hoisting
Presentation on Steam Power Plants R.C.Chaturvedi
ENGR 2213 Thermodynamics F. C. Lai School of Aerospace and Mechanical Engineering University of Oklahoma.
1 A 英 Consider a regenerative cycle using steam as the workingfluid. Steam leaves the boiler and enters the turbine at 4 MPaand 400 ℃. After expansion.
Greenhouse Management.  List the different types of heating systems used in a greenhouse.  Describe the advantages and disadvantages of each type of.
KAKATIYA THERMAL POWER PROJECT 1X600 MW TG PUT ON BARRING GEAR ON AT AM.
GHG Emission Trends & Technological Options for its reduction in Pakistan By Jawed Ali Khan, TNA Consultant Mitigation Feb
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
S.K.Thapa General Manager BHEL, Kolkata EFFICIENT CYCLE IN POWER GENERATION AN INDIAN PERSPECTIVE.
A Presentation on THERMAL POWER PLANT Sunil Kumar M.E. (5TH)
Introduction And Thermal Power Plant
DEAERATOR-STAGE-II/TPS-II /NLC INDIA LTD
Review Questions Chapter 5
VARIABLE EFFECTING EFFICIENCY OF RANKINE,REHEAT,REGENERATIVE CYCLE
RANKINE CYCLE IMPROVISATIONS BY PRABHAKARAN.T AP/MECH
UBOH PLTU JAWA BARAT 2 PALABUHANRATU 3 x 350MW
Boilers & Thermic Fluid Heaters
Managing Director (Bajaj Power Ventures Ltd)
THERMAL POWER PLANT.
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Yahoo Mail Customer Support Number
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
TO PRESENTATION ON SUPERCRITICAL BOILER
THANK YOU!.
THERMAL POWER PLANT.
Thank you.
Thank you.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
Proposed Replacement of 8800PPH Steam Boiler ( )
(Draft) Ecodesign Working Plan
WATER AND STEAM SYSTEM.
Machines to Convert Shaft Power to Micro Kinetic Power…….
WELCOME TO TURBINE & ITS AUXILIARIES KNOWLEDGE GROUP PRESENTATION by madhukar srivastava, se (m), ktps, dvc.
660 MW SUPERCRITICAL TURBINE " GOVERNING & PROTECTION SYSTEM"
Optimal Location of Multiple FWHs in Rankine Cycle
Presentation transcript:

2X800 MW, YERMARUS HIGH PRESSURE HT COMPLETED ON IN THE PRESENCE OF JOINT DIRECTOR OF BOILERS KARNATAKA

POOJA PERFORMED BY JDB & TEAM Shri. T G Manjunatha JDB Karnataka Shri. Sundara Rajan AGM Site Incharge Shri. Parimala Jana AGM Shri. Venugopal SE, RPCL Shri. S Sridhar AGM

THE HIGHEST PRESSURE - BFD HT HT PRESSURE 675 kg/cm 2

THE BFD HT ( INCLUDING HEATERS ) HT PRESSURE 525 kg/cm 2

EXTRACTION 3,4 & 8 HT HT PRESSURE kg/cm 2 HT PRESSURE 10.5 kg/cm 2

TESTED CIRCUITS UNIT#1 BFD FROM PUMP TO HP HEATERS & RECIRCULATION BFD FROM HP HEATER TO BOILER TP EXTRACTIONS 3,4,5,6 & 8 AUX STEAM HFO HEATING AND ATOMISING LINES UNIT#2 CRH FROM NRV TO BOILER TP INCLUDING HPBP DOWNSTEAM TO CRH, CRH TO DEAERATOR, EXTRACTION FROM CRH TO TDBFP A&B, CRH TO PRDS, EXTRACTION FROM CRH TO HPH -7A & 7B.

RECORD BREAK YERMARUS TEAM HAS ACHIEVED A RECORD COMPLETION OF HT FOR MORE THAN 10 CIRCUITS CONSECUTIVELY FOR SECOND TIME  HYDRO TEST COMPLETION OF 16 NOS. OF CIRCUITS ON  HYDRO TEST COMPLETION OF 12 NOS. OF CIRCUITS ON BREAK A RECORD

TEAM MEMBERS (JDB/BHEL/RPCL/STEAG/ICPL)

THANK YOU