PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
DOE Neutrino Program Plans
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
F Project X Overview Dave McGinnis October 12, 2007.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
 Advanced Accelerator Simulation Panagiotis Spentzouris Fermilab Computing Division (member of the SciDAC AST project)
High Power Proton Facilities Sergei Nagaitsev APS April 2015 meeting 11 April 2015.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Staging of a Neutrino Factory (and beyond…) Mark Palmer Director, US Muon Accelerator Program NuFACT 2014, Glasgow, August 25-30, 2014 NUFACT2014 XVIth.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
Proton Driver Status Bob Kephart August 25, 2004.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Proton FFAG Accelerator R&D at BNL Alessandro G. Ruggiero Brookhaven National Laboratory Alessandro G. Ruggiero Brookhaven National Laboratory.
MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes P5 Meeting/BNL December 16, 2013 projectx-docdb.fnal.gov/cgi-bin/ShowDocument?docid=1232.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Fermilab: Prospects and Plans Giorgio Apollinari Fermilab New Opportunities in Physics May 10-13, 2009.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
PIP-II: Goals, Strategy, and Status Paul Derwent 26 February, 2015.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
INTRODUCTION PASI 2015 Swapan Chattopadhyay. ACKNOWLEDGMENT Steve Geer Steve Holmes Ken Long Peter McIntosh Sergei Nagaitsev Vladimir Shiltsev Alexander.
PIP-II Overview: Goals, Status, Strategy Steve Holmes PIP-II Machine Advisory Committee 9-11 March 2015.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Introduction to PIP-II Steve Holmes DOE Independent Project Review of PIP-II 16 June 2015.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
UK Neutrino Factory Conceptual Design
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Superbeams with SPL at CERN
A Superconducting Proton/Electron Linac
Presentation transcript:

PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015

First: a little about me Paul Derwent, Scientist in Accelerator Division –B.S. Physics, 1986, University of Notre Dame –M.S., Ph.D. Physics, 1990, University of Chicago –Research Fellow, , University of Michigan –Scientist, Accelerator Division Antiprotons for the Tevatron Collider Accelerator Upgrades in support of NOvA Proton Improvement Plan II –Deputy Project Manager for Accelerator Integration 7/23/15Paul Derwent | PIP-II Why a new accelerator?2

Why a new Accelerator? Neutrinos are pretty cool: –most prevalent particles in the universe –lightest particles we know –they change into each other as they fly by –parameters of the oscillations are still not completely understood –been a focus of physics at Fermilab since the beginning first approved proposal (E1A) was to investigate muon production with a high energy broad band neutrino beam! –Current focus on the oscillations: short baseline (detectors on site) and long baseline (detectors in Minnesota and South Dakota) 7/23/15Paul Derwent | PIP-II Why a new accelerator?3 3 Nobels in last 30 years: 1988: muon neutrino 1992: discovery of neutrino 2002: cosmic neutrinos

Fermilab Program Goals Fermilab’s goal is to construct & operate the foremost facility in the world for particle physics research utilizing intense beams. Neutrinos –MINOS+, kW multi-MW 10’s kW Muons –Muon kW kW Longer term opportunities  This requires more protons! (and this statement tends to be time invariant) “Upgrade the Fermilab Proton Accelerator Complex to produce higher intensity beams. R&D for the Proton Improvement Plan II (PIP-II) should proceed immediately, followed by construction, to provide proton beams of > 1 MW by the time of the first operation of the new long-baseline neutrino facility” – Recommendation 14, P5 report 7/23/15Paul Derwent | PIP-II Why a new accelerator? 4

Beam Power: What does a MW mean? Power: Energy/time –Standard unit: 1 Watt = 1 Joule / second Beam Energy: usually discussed in GeV/particle –1 GeV = 1 Billion electron Volts –1 electron Volt: energy a particle with unit charge gets when accelerated through a potential of one Volt –1 eV = 1.6 x Joules –120 GeV = 1.92 x Joules –1.2 MW corresponds to 6.25 x particles / second at 120 GeV 7/23/15Paul Derwent | PIP-II Why a new accelerator?5

Current Performance 2015: –Average: 430 kW 3.3 x every 1.33 seconds x 0.9 (programmatic) –Peak: WORLD RECORD 520 kW 3.6 x every 1.33 seconds 2016: –expect to reach 620 kW (average), 700 kW (peak) 7/23/15Paul Derwent | PIP-II Why a new accelerator?6

Physics goals and Prospects Particle Physics Project Prioritization Panel (P5) : –Pursue the Physics Associated with Neutrino Mass Metric –kTon MW years kTon: size of detector MW: beam power years: how long it takes –Scale: 500 – 900 kT MW yr LBNF and DUNE: –size of the detector PIP-II –beam power 7/23/15Paul Derwent | PIP-II Why a new accelerator?7

Time : Neutrino experiments take time 7/23/15Paul Derwent | PIP-II Why a new accelerator?8 Consider several options for how one could reach the P5 goals We see that the existing 700kW capability, even when paired with the full detector mass leads to an unrealistic time line for achieving the physics goals Given the size and complexity – it is difficult to imagine more mass (at least at this time) 40kT with 1.2 MW is a 20 year program

Increase the intensity! –physics limits: as go up in intensity, performance changes space charge: like charges repel -> beam gets bigger! –equipment limits: aperture and power –operational limits beam losses -> activation ALARA: maintenance and repair –~50% increase but keep total loss the same! Shorten the cycle! –power and cooling magnets and accelerating RF cavities –~11% increase –$15-20M to build new ponds How to get to 1.2 MW? 7/23/15Paul Derwent | PIP-II Why a new accelerator?9

Proposed Approach: Proton Improvement Plan II Construct a modern 800-MeV superconducting linac –Increase Booster/Recycler/Main Injector per pulse intensity by ~50%, ameliorating space-charge at Booster injection Accompanied by modifications to Booster/Recycler/Main Injector to accommodate higher intensities and higher Booster injection energy MultiNational Collaboration –US National Labs: FNAL, ANL, LBNL –India National Labs: BARC, RRCAT, IUAC, VECC –European Labs: still under discussion 7/23/15Paul Derwent | PIP-II Why a new accelerator?10

Proposed Technical Approach/Site Layout Paul Derwent | PIP-II Why a new accelerator?117/23/15

Concept: Mostly superconducting cavities Warm Section at the front, followed by 25 superconducting cryomodules –SRF higher gradients -> shorter linac lower power consumption Building operational prototypes to understand cost & schedules 6/16/2015S. Holmes | Intro to PIP-II m long 5 Cav + 3 Magnets

Schedule Goal: Deliver 1.2 MW beam at start of LBNF/DUNE operations -> 2025 –4-5 year R&D to demonstrate critical technologies, costs, and schedule capabilities of partner institutions –5 year construction project Future PIP-III: reach 2.4 MW –doubling of the beam intensity replace the Booster with ? R&D on performance to understand limitations and mitigate them! 7/23/15Paul Derwent | PIP-II Why a new accelerator?13