C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec.. 10-12, 20081 The DEPFET-Project: European Collaboration for a Pixel SuperBelle.

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
Advertisements

2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Actividades de I+D en IGFAE/USC Pablo Vázquez (IGFAE-USC) IV JORNADAS SOBRE LA PARTICIPACIÓN ESPAÑOLA EN FUTUROS ACELERADORES LINEALES Madrid, 2-3 Diciembre.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
SuperKEKB 2nd open meeting March 17-19, 2009 Hans-Günther Moser MPI für Physik PXD Session SOI: more information: see TIPP09 -> submission in February,
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Summary of PXD Session 1 Status of CAPSH. Hoedlmoser (Video)
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011.
FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size; ~6mm x 6mm Full.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
C. Kiesling, B2GM PXD Session, KEK, March , Towards a Neural z-Vertex Trigger for the CDC News from the DEPFET Collaboration New Schedule.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
1 Characterization of Pilot Run Modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik IMPRS Young Scientist Workshop Ringberg.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
H.J.Simonis, IEKP Uni-Karlsruhe, SuperKEKB meeting, KEK 18.mar 2009 Thermal studies for the DEPFET Pixel Detector IFIC – University of Valencia (Spain)
H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Barcelona Summary Thanks to our hosts for UB for a great meeting!
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
Low Voltage Power Supplies: towards design specifications Henryk Palka, IFJ PAN Krakow (for WP team: Krakow, Prague, KEK) DEPFET-Belle Meeting Karlsruhe,
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
1 Test of Electrical Multi-Chip Module for Belle II Pixel Detector DPG-Frühjahrstagung der Teilchenphysik, Wuppertal 2015, T43.1 Belle II Experiment DEPFET.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
1 First large DEPFET pixel modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik DPG-Frühjahrstagung der Teilchenphysik,
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
L.Vitale INFN and Univ. Trieste
SVT – SuperB Workshop – Annecy March 2010
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Thinning and Plans for SuperBelle
SVT subchapters & editors
Technical Design for the Mu3e Detector
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
KEK news ( ) S.Tanaka.
The CSOI approach for integrated micro channels
DHH progress report Igor Konorov TUM, Physics Department, E18
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Planning for the TDR KEK schedule: Technical Design Report (TDR)
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Work packages status in Torino and perspectives
Vertex Detector Overview Prototypes R&D Plans Summary.
Setup for testing LHCb Inner Tracker Modules
SVT – SuperB Workshop – Frascati Sept. 2010
SVD group organization, schedule, milestones
Presentation transcript:

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle (PXD) Report from the German SFF meeting Work Packages Update Schedule Conclusions & Outlook IEKP Karlsruhe HEPHY C. Kiesling, Max-Planck-Institute for Physics, Munich

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Workshop on Prospects of future Super Flavor Factories Date: 31. Oct and 1. Nov (Fri/Sat) Place: MPI Munich Motivation: German groups should make a decision whether to engage in activities in a Super Flavor Factory, and if yes, in which one: at KEK „SuperKEKB“ or Frascati („SuperB“) Grants from the German government need to be requested for the coming funding period by Dec. 5, participants from 13 German universities (& outside) Bochum, Bonn, Dortmund, Göttingen, Gießen, Heidelberg, Karlsruhe, Mainz, Munich (MPI, LMU, TUM), Regensburg, Siegen

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , 20083

4

5 K. Oide

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Concluding Discussions of the Munich Meeting Very positive outcome of the German Meeting for SuperKEKB Theoretical colleagues unanimously supporting SFF DEPFET will be baseline for SuperBelle (M. Yamauchi) DEPFET can also be installed in SuperB detector (D. Hitlin) 6 German groups expressed interest to participate in the SuperKEKB/SuperBelle project No group expressed interest to participate in SuperB Some German groups are busy with LHCB, but expressed their opinion that a Super-B-Factory (> 50 /ab) opens a new Era of Flavor Physics and must be pushed

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , DEPFET Pixel Detector 7.1 cm 8.4 cm Small, thin (50µm) Detector: 20 – 24 Modules (one sensor each) Beam pipe radius (presently): 1.5cm initially with upgrade to 1.0 cm later Radii still subject to optimisation: Likely scenario: Layer 1 at 1.8 cm Layer 2 at 2.2 cm Upgrade option: add Layer 0 at 1.3 cm

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , cm 8.4 cm Mechanics Cooling Services Assembly …… Sensors ASICs Interconnection Assembly Data links DAQ Power Control … DEPFET Pixel Sensors, details (see talk by L. Andricek)

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Main R&D Issues Sensors:pixel geometry -> parameter studies prototyping, radiation hardness (> 10Mrad), thinning (see Laci‘s talk) Read-out ASICs:Current Digitizer chip (DCD): prototype OK, needs test at full speed (x2) (< O(1%) occupancy) Switcher: rad-hard design, speed OK, redesign for SuperBelle DHP & Data Link:Zero-suppr: 400 Gpx/s -> 2 Gpx/s (trigger, occ) -> 1.6 Gb/s per half module DAQ:80 Gb/s total -> Gießen R&D for Panda (32 Gb/s) Test Procedures:Beam/system tests (see Peter‘s talk) Mechanics, Cooling:Mounting, vibrations, thermal issues, alignment …,

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec ,

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Work Packages and Assignments

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Work Packages and Assignments (cont.)

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Work Packages and Assignments (cont.) DEPFET-Collaboration: total of 18 Institutes from 7 Countries

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Example of Work Package „Thermal Issues“ Valencia Karlsruhe MPI

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Example of Work Package „Parameter Definitions“ MPI, Prague, Krakow ILC software frame

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Example of Work Package „Parameter Definitions“ (cont.)

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Example of Work Package „Parameter Definitions“ (cont.) Space point resolutions pixel size 50µm x 75µm

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Example of Work Package „Parameter Definitions“ (cont.) pixel size 50µm x 75µm

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Example of Work Package „Parameter Definitions“ (cont.) pixel size 50µm x 75µm

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Low Voltage Power Supplies (LVPS)  workout a detailed list of components  elaborate a technical specifications document  estimate costs  prototype procurement  select the manufacterer Planning informal contact established with Fideltronik, the producer of HVPS for ATLAS of HVPS for ATLAS Short term  agree on design parameters  find/select a designer Long term Example of Work Package „Power & Slow Control“ Krakow USC (Spain)

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Installation & Operation Module assembly (where, how ?) Assembly of modules to a layer (or complete detector) Installation in SuperBelle Operation issues (calibration, monitoring) Online monitoring and logging: Currents Temperatures Occupancy Signal and pedestal distributions (pedestal updating!) Noise Radiation dose

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Schedule 2009: finish checks on radiation hardness up to 10Mrad demonstrate fast readout with existing components fix geometry & technology prepare DEPFET production (SOI wafers) prototype production (processing: ~ 1.5 years) ½ SuperBelle module size (one electrical unit) some parameter variations 2010:test and evaluation of prototypes assembly procedure and tooling 2011:final detector production 2012: assembly + tests 2013: installation Very tight schedule, not without risk

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Schedule (detail)

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Schedule (detail)

C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , Conclusions and Outlook DEPFET Collaboration / German groups are now firmly behind the PXD project for SuperBelle, Working Groups are getting organized, work for SuperBelle intensifying (regular meetings) Work packages are defined, lead institutions (+contacts) are identified Schedule for the project is established and agreed (but tight!) Groups working towards DEPFET PXD baseline option for SuperBelle SuperBelle Note for DEPFET PXD is being planned Funding agencies have been approached (total of ~2.5 MEuro core cost)