Update on the Laser Beam Line

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
AWAKE electron source New Electron Source WP at CERN
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Laser Beam Transport and Integration. AWAKE Collaboration meeting. Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev CERN
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Compressor status AWAKE Technical Board meeting 19 August 2015.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Status of AWAKE Laser Line Installtion For the EN-STI Management Board - 30 May 2016 Presented by Valentin Fedosseev.
ELENA installation progress F. Butin / ELENA collaboration.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
MEDICIS Safety Alarms Systems
CBETA Technical Review
EYETS David Hay EN-OSS.
Installation of an Instrument on a CERN machine
Tunnel Cross Section Studies
AWAKE proposals for BE/BI
Laser Beam Transport and Integration AWAKE Collaboration meeting Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev.
Installation XFEL Tunnel WP 34
Advanced Research Electron Accelerator Laboratory
Experimental Areas – LS2 planning
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Update on the Laser Beam Line Valentin Fedosseev AWAKE Collaboration meeting CERN, 12.03.2015

Laser lines in AWAKE Laser beam line to plasma cell Diagnostic beam line (“virtual plasma”) Laser beam line to electron gun 12/03/2015

Laser line work package Arrangement of the laser lab at CERN Beam transfer optics and mechanics To plasma cell To photoinjector Laser beam monitoring and control Implementation of laser safety requirements In conjunction with CERN access system Links for remote control of laser 12/03/2015

Civil engineering works Laser core completed Trench in TT41: to be painted and covered Laser room painted 12/03/2015

Laser beam to plasma cell Functional scheme of the laser beam line to the plasma cell indicating the mirrors (blue) and their surrounding vacuum tanks, the laser safety shutters (green) and laser beam dumps (violet). 12/03/2015

Vacuum laser line Design of general layout has been approved 12/03/2015

Vacuum laser line Work on detailed drawing is close to completion Procurement is started 12/03/2015

Cooling and ventilation Requirements for laser cooling Water pressure: 2 – 8 bars Water temperature: 18°C - 20°C Water supplies available in the tunnel Demineralized water Water pressure: up to 16 bars Water temperature: 28°C Chilled water Water pressure: up to 16 bars Water temperature: 6°C Solution proposed by CV To install a heat exchanger with a closed water circuit between laser and chilled water with a water pump to fulfil laser cooling requirements 12/03/2015

Cooling and ventilation TSG40 ventilation system EN/CV AWAKE Project Supply duct H14 filter Return duct Extraction duct Smoke damper Work on installation of air ducts starts on this week 12/03/2015

Laser Room Integration Arrangement of laser components on optical tables has been proposed by Amplitude Discussions on possibility to reduce the size of pulse compressor chamber took place (MPP, Amplitude and CERN) - > Diameter 120 cm is agreed. Integration is on-going: Ventilation Supporting structures for hoist, shelves and cables Racks and cable trays Services 12/03/2015

Laser integration Layout proposed by Amplitude and its 1st integration plan 12/03/2015

Laser integration Latest version of laser room integration Racks for laser control and RF equipment Latest version of laser room integration Proposal for hoist rail support 12/03/2015

Cabling requests Motorization RL1 RT1 RL3 PP1 LLRF LS1 LS2 RT2 LBD1 Purpose Begin End N wires Cable type Mirrors proton line TSG40 RL2 TT41 RL2 14 x 2 NG28 Mirrors electron line TCV4 RL3 Laser shutter 1 TT41 LS1 6 x 2 + 6 x 2 NE12 x 2 Laser shutter 2 TSG40 RL1 TT41 LS2 6 x 2 NE12 Laser beam dumps 1, 2 BS 12/03/2015

Cabling requests Ethernet outlets, PoE and RS232 cables RL1 RT1 RL3 LLRF RT2 RJ45 x4 RJ45 x20 PP1 PP2 Purpose socket Position Type N sockets Laser control TSG40 RL1 TN 2 Mirror controls 6 Beam diagnostics Timing TSG40 RT2 4 TT41 PP1 TCV4 RL3 TCC4 PP2 General TSG40 GPN WiFi access point in Laser Room Purpose cable Begin End N cables Cable type PoE Cameras TSG40 RL1 TT41 PP1 10 x PoE LAN Rj45 VA8C Filter wheels 8 x RS232 Sub-D 9 MCA8 12/03/2015

Access to laser areas Sectorization proposal under discussion Always Access to sector 7 is restricted to laser users During laser beam alignment Access to sectors 3 and 6 is restricted to laser users 12/03/2015

Time schedule Installation of ventilation ducts and water pipes: March-April 2015 Installation of doors : March 2015 Installation of supporting structures: April-May 2015 Cable tray: May 2015 Electrical, control, Ethernet cables: June 2015 Fire detection and alarms: June-July 2015 CV hardware commissioning. Clean room ready: July-August 2015 Laser tables: September 2015 Vacuum line installation: September-November 2015 Access control: October-November 2015 Compressor installation: November 2015 Laser installation: December 2015 – February 2016 Beam transport optics: January-February 2016 Laser HWC: March-June 2016 12/03/2015

Acknowledgments EN-STI-LP: Christoph Hessler, Misha Martyanov EN-MME : Nicolas Chritin, Cedric Delory TS-VSC: Jan Hansen, Friederike Salveter EN-MEF: Ans Pardons, Frederic Galleazzi, Vincent Clerc, Marzia Bernardini, Michel Arnaud, Patrick Vincent EN-CV: Michele Battistin, Frederic Teixeira GS-SE: Richard Morton, Alex Selles EN-HE: Jean-Louis Grenard GS-ASE: Vitor Martins De Sousa Dos Rios 12/03/2015