SC32/WG2 N889 Guideline to use Bugzilla in SC32WG2 (supersedes SC32/WG2 N0879) Bugzilla Drafting Committee SC32WG2 ISO/IEC JTC1 SC32 WG2 Toronto Meeting.

Slides:



Advertisements
Similar presentations
ASTM Officers Training Workshop Subcommittee Chairmens Duties And Responsibilities September 11-12, 2006 Joe KouryChristi Sierk.
Advertisements

High Rate 60 GHz PHY, MAC and HDMI PAL Standard Invitation to ETSI BRAN, WiMedia and JTC 1/SC 06 open review For Ecmas comments and dispositions to DISs.
ECMA-373 Invitation to ETSI/SCP and JTC 1/SC 06 for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/136.
MAC & PHY Standard for Operation in TV White Space Invitation to JTC 1/SC 06 and CogNeA for open review For Ecmas prospective comments and dispositions.
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
WG4 report to SC31 plenary Toronto 6 June WG4ConvenorMr. Henri Barthel WG4SecretaryMr. Gertjan van den Akker SG1 - Application Interface ProtocolsConvenorMr.
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
Doc.: IEEE Submission November 2004 Robert F. HeileSlide 1 Forward P REVa-D6 to RevCom Robert F. Heile Chair
REVIEW APPROVAL AND RECORD KEEPING PROCEDURE Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document #
Unit Registration Process Improvement SEMO 05/12/2012.
Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)
TOSCA Technical Committee Kick-off December 12, 2011.
Submission February 2014 Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AR 20 March 2014 Authors: NameCompanyPhone .
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 20 March 2014 Authors: NameCompanyPhone .
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
ISO Process Summary for SEDRIS Dick Puk ISO/IEC SC24 SEDRIS Editor WG8 Meeting, October 1, 1999 ISO/IEC JTC1/SC24/WG8 N4.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 18 March 2014 Authors: NameCompanyPhone .
GEtServices Purchasing Units & Materials Training For Suppliers Request.
SC32/WG2 N0879 Proposal for WG2-level formal resolution using Bugzilla Japan National body ISO/IEC JTC1 SC32 WG2 Toronto Meeting 2005/09/26-30.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Moving To the Year 2000:Implementing 4010 Implementation Resolution Process Rich Emrich EDI Manager J.M. Schneider.
802.16p Closing Report for Session #76 [IEEE Presentation Submission Template (Rev. 9.2)] Document Number: IEEE p-11/0037r1 Date Submitted:
Doc.: IEEE /0456r0 Submission April 2008 Jesse Walker, Intel CorporationSlide 1 Geneva JTC1/SC6 Liaison Report Date: Authors:
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
ISO/OMG Liaison ISO/IEC JTC 1/SC 32/WG 2 Washington D.C February 8-12 Thomas Culpepper 3M Health Information Systems Applied Technology Research.
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
SC32/WG2 N Status report on ISO/IEC CD MMF Ontology Registration He Keqing and OKABE, Masao Project editor MMF Ontology Registration ISO/IEC JTC1.
Doc.: IEEE /xxxxr0 Submission July 2007 Terry Cole, AMDSlide Common Editorial Comment Resolution Process Date: Authors:
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
SECTION BYLAWS APROVAL PROCESS Five Easy Steps. Step 1: Collect Data Obtain Template from SWE Communities Professional Section Bylaws Community Collegiate.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AB 20 March 2014 Authors: NameCompanyPhone .
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Minutes Document March 2006 Terry Cole, AMDSlide Editor’s Best Practices Terry Cole, AMD WG Technical Editor & Simon Barber, Devicescape.
Doc.: IEEE Submission July 2006 Ho-In Jeon, Kyung-Won UniversitySlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE a Submission Sept 2004 Tom Siep, TMS Assoicates, LLCSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
PACR Technical Committee Convener Call 09 January /9/131.
Instructions for New Revision & Deviation/Exception Forms
Tender Evaluation and Award Process
IAF TC Report to PAC TC Summary of progress (June 2017)
James W. Moore Liaison Representative IEEE Computer Society June 2004
ECMA-328 2nd edition Invitation for open review
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Editor’s Guideline Version 1.0
EC Motions Package Authors: Date: October 2016
EC Motions Package Authors: Date: October 2016
Status Report November 2007
2017 Amendments to the INCITS Organization, Policies and Procedures
Reliance Supplier Corrective Action Process
Standards Development: An Overview
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Working Group November Plenary EC Closing Motion
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Introduction to ISO/IEC JTC 1 SC7
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Task Group N Procedural Planning May 10, 2004
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Sept 2008 Closing Plenary Motions
Sept 2008 Closing Plenary Motions
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Standards Development Process
Task Group G Report January 17, 2003
Presentation transcript:

SC32/WG2 N889 Guideline to use Bugzilla in SC32WG2 (supersedes SC32/WG2 N0879) Bugzilla Drafting Committee SC32WG2 ISO/IEC JTC1 SC32 WG2 Toronto Meeting 2005/09/30

SC32/WG2 N How to initiate a discussion on Bugzilla Any P-members, participants, Convener and Project editors can post an issue on Bugzilla, discuss it on Bugzilla and resolve it on Bugzilla. When a new issue is posted, Bugzila automatically send a notification to all the members of Bugzilla distribution list. It is responsibility of each P-member national body to have at least one person assigned to Bugzilla distribution list. Bugzilla automatically keep all the discussions on it and send their notifications to all the members of Bugzilla distribution list. The issue to be posted has to be specific and appropriate to Bugzilla and its description has to be clear. Otherwise, it will not be ‘assigned’ and remain ‘new’ after it is posted. see ‘Issues not appropriate to Bugzilla’ on slide 5 and 6.

SC32/WG2 N How to put a proposed resolution on Bugzilla After an issued becomes ‘assigned’, any P-members, participants, Convener and Project editors can post a proposed resolution, otherwise specified. Editor is responsible to initiate the resolution procedure for each issue. It should be considered that WG-level work is done on consensus-base (i.e. the substantial support of the P-members is necessary.) The days given for reviewing is basically 28 calendar days after it is posted, but may change depending on the issue.  Deadline should be stated by a calendar day in terms of GMT. Any P-members, participants, Convener and Project editors who are not satisfied with the proposed resolution can post a counter proposed resolution. Basically, another 28 calendar days should be given also to the counter one.

SC32/WG2 N Several Notes For any issue that is not resolved yet, any P-members, participants, Convener and Project editors who think that the issue is inappropriate to be resolved on Bugzilla can raise an opposition, then the issue cannot be resolved on Bugzilla but the discussion on it can be continued on Bugzilla. For any issue whose resolution procedure initiated by the editor but not yet resolved yet, any P-members, participants, Convener and Project editors who think that the resolution procedure is inappropriate can raise its change proposal to the editor, then the editor has to consider the proposal. Any P-members, participants, Convener and Project editors who recognize that Bugzilla does not make proper notifications are responsible to notice the fact to all. Then, all the discussion on Bugzilla has to be halted until Bugzilla comes to make proper notifications.

SC32/WG2 N Issues not appropriate to Bugzilla (1 of 2) Issues related to the following resolutions that are usually made at the WG2 meeting are not appropriate to Bugzilla. Section 1 - Programme of Work Resolutions Resolution WG 02 / 1: SC 32/WG 02 Programme of Work and Project Editor Assignments SC 32/WG 02 approves the Programme of Work, Target Dates and Project Editor Assignments contained in … Resolution WG 02 / 2: SC 32/WG 02 Project Subdivisions SC 32/WG 02 approves the following subdivisions and minor enhancements to existing work: SC 32/WG 2 instructs its Convener to forward these subdivisions to SC 32 for endorsement. Resolution WG 02 / 3: SC 32/WG 02 Project Withdrawals SC 32/WG 02 approves the following withdrawals from existing work: SC 32/WG 02 instructs its Convener to forward these withdrawals to SC 32 for endorsement. Resolution WG 02 / 4: Standards Due for Periodic Review SC 32/WG 02 approves the following: SC 32/WG 02 instructs its Convener to inform SC 32 of the above recommendations. Resolution WG 02 / 5: New Projects SC 32/WG 02 approves the following: Upon receipt of texts, SC 32 WG 02 recommends that SC 32 submit to JTC 1 the referenced Proposals for New Work Items: Resolution WG 02 / 6: Study Period SC 32 WG 02 recommends that SC 32 submit to JTC 1 the following Proposals for Study Period:

SC32/WG2 N Issues not appropriate to Bugzilla (2 of 2) (Continued from the previous slide) Section 2 - Project Document Resolutions Resolution WG 02 / 7:Committee Draft (CD) Ballots (CD, PDAM, PDISP, PDTR) Upon receipt of texts, SC 32/WG 02 requests its SC 32 Secretariat to register as CDs, PDAMs, PDISPs, PDTRs and issue letter ballots on the following projects: Resolution WG 02 / 8:Final Committee Draft (FCD) Ballots (FCD, FPDAM, FPDISP, FPDTR, DCOR) Upon receipt of texts, SC 32/WG 02 requests its SC 32 Secretariat to register as FCDs, FPDAMs, PDTRs, FPDISPs, DCORs and issue letter ballots on the following projects: Resolution WG 02 / 9:Final Draft International Standard (FDIS) Ballots (FDIS, FDAM, DTR) Upon receipt of texts, SC 32/WG 02 requests its SC 32 Secretariat to register as FDISs, FDAMs, DTRs and submit to ITTF for the following projects: