Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Polarity Issues at the Inner Triplets and DFBXs.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
RaceBot can do car race using two DC motors. Let's learn how to go forward, backward, right turn, and left turn. with practicing ' ㄱ ' shape racing, and.
R. Ostojic, WAMSDO, 19 May 2008 LHC Insertion Region Upgrade Phase I 1.Upgrade goals and milestones 2.Review of IR systems: main findings 3.The emerging.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Caterpillar CaterpillarBot is a robot that can pass the bumpy road by using caterpillar.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Organization of cabling information Creating a Medaustron Cable Database 1 That’s what we don’t want!! MACS 28/06/2011 Sebastien Pelletier Cabling Database.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Updates to WISE for LHC run II Per Hagen May 2015.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
Massimo GiovannozziChamonix XV, January Electrical circuits required for the minimum workable LHC during commissioning and first two years.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 1 Inner Triplet Interconnects Electrical Connections.
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
BullBot is bull robot that can have bull fight with techniques of butting or lifting. Learn how bull fight, Korean traditional game, had started and kinds.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
R. Ostojic CERN, AT Department. 2 LHC Insertions Experimental insertions in points 1, 2, 5, 8 contain low-beta triplets. In total, eight triplets are.
AT-MEL, CERN, 1211 Geneva 23 R.Wolf-LHCCWG Magnet Setup Cycling for LHC R. Wolf for the FQWG et al. Contents -Overview -Details of individual cycles.
MPP Meeting Sandor Feher Inner Triplet Powering Should include the IR quads and the DFBX especially the power leads. DFBX commissioning doc was.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
The FiDeL Database Per Hagen (TE/MSC) Acknowledgements: L. Deniau, R. Wolf …
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
Superconducting Links R2E and Avalilability Workshop
ALIGNMENT OF THE NEW TRIPLETS
Considerations from machine protection and the ELQA teams
Francesco Cerutti, Andrea Tsinganis WP10 Energy deposition & R2E
MQXC Nb-Ti 120mm 120T/m 2m models
Cold mass design, assembly plans and QA/QC at CERN
LBNF CAD models, Drawings and Component list
SLHC –PP WP6 LHC IR Upgrade - Phase I.
MPP Result of the investigation in the orbit correctors faults.
Powering LHC magnets version 30/3/2007.
The HL-LHC Circuits: Global View and Open Questions
Layout Drawings and Mechanical Assembly Drawings
Powering the LHC Magnets
Progress Report from the Magnet Polarity Coordinator
Powering from short circuit tests up to nominal
The 11T cryo-assembly: summary of design and integration aspects
Q1-Q2, Q2-Q3 Interconnect Zone Disconnection Q1 Magnet Extraction
مقدمة في الاردنيو د فضل الاكوع.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
WP3 Meeting – December the 10th 2015 H. Prin
Triplet corrector layout and strength specifications
ECR on pole order of the HL-LHC IT circuit and resulting implications
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Polarity Issues at the Inner Triplets and DFBXs

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Electrical Layout Drawing Inner Triplet

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Normal Position of the Connection Terminals  If a multipole corrector within the magnet assembly has its connection terminals facing downstream of Beam 1, and if the magnet's optical function changes (depending on the multipole order), then the terminals are re- labeled.

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Normal Position of the Connection Terminals  If an entire magnet assembly is be installed in the LHC tunnel turned by 180 deg. around the vertical axis, then the naming of the connection terminals A and B are not changed. If the magnet's optical function changes, then the polarity is changed on the warm side (magnet is marked with a star in the layout). * * *

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Magnet Polarities in the Insertion Regions ▼▼▼▼▼▼▼▼▼▼ ▲▲▲▲▲▲▲▲▲▲▲

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Polarity Error of MCOX,MCSSX (Everywhere) Fixed on the Patch Pannell, no impact on QPS (120 A)

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Connection Board at DFBX A A A A A A A BBB BB B B

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Connection Board at DFBX Polarity errors in MCSSX, MCOX in Q3 A A A A A A A B B B B B B B

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Connection Board at DFBX A A A A A A A B B B B B B B Read !

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Cable Crossing MQSX in DFB (Everywhere) Fixed on the Patch Pannell, but impact on the QPS, mended at sotware interface Interface to QPS on Proximity Equipment

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Pin out 120 A Connectors (Everywhere) Fixed in Connector on the Proximity Equipment side

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 MCSX Polarity (only in DFBXG (8L) Fixed at Patch Pannell no impact on QPS, Vtap Routing corrected in Connector

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Everywhere  Main circuit RQX: inversion of the current lead indices (EDMS ) with respect to the LHC reference DB Electrical Layout Assembly in tunnel

Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Inversion of Lead Indices RQX (Everywhere) Fixed at Patch Pannell