2006 CMBG Conference Workshop 2: Facilitator: Keith Reinsmith PPL Susquehanna June 11-14, 2006 Richmond, VA.

Slides:



Advertisements
Similar presentations
Human Performance: Observation Principles of Excellence
Advertisements

DATA CONSIDERATIONS Module 3 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
2007 CMBG Conference Keith Reinsmith PPL Susquehanna, LLC June 17-20, 2007 Charleston, SC Engineering Change Impact Evaluation Process.
Ensure Vendor/Engineer of Choice Product Quality
New Employee Orientation “How To” for Supervisors.
Dr. Julian Lo Consulting Director ITIL v3 Expert
Innovation Leadership Training Chino for a Day February 5, 2009 All materials © NetCentrics 2008 unless otherwise noted.
Quality evaluation and improvement for Internal Audit
Project Management Gaafar 2006 / 1 * This Presentation is uses information from PMBOK Guide 2000 Project Management Human Resource Management* Dr. Lotfi.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
Certified Business Process Professional (CBPP®)
TSM: Safety Management in a Quality Management Setting
Dimensions of Data Quality M&E Capacity Strengthening Workshop, Addis Ababa 4 to 8 June 2012 Arif Rashid, TOPS.
Corporate Governance: Beyond Compliance at a time of Recession Prof. Ashley G. Frank BA(Econ)[Magna Cum Laude], MDPA (Cum Laude], MBA, MCom [Cum Laude],
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
1 D D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 Achieving and Maintaining High Reliability through Human Performance.
1 CMBG 2009 Knowledge Management at PPL Monday June 29, 2009 Keith Reinsmith PPL Susquehanna.
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
ANSI/NIRMA Standard CM 1.0 Status Update
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Characteristics of a Good Calculation Program Presented.
Assessment Workshop Title of the Project (date). Project Title Assessment Workshop October 25, 2015© Company Name All rights reserved2 Agenda Purpose.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
Copyright 2012 Delmar, a part of Cengage Learning. All Rights Reserved. Chapter 4 Motivating People.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
Safety on Call CREATING A TOTAL SAFETY CULTURE. Safety on Call A “Safety Culture” cannot be developed fully in a short presentation. Therefore, this presentation.
Aligning Ethics Communication & Training With Business Priorities and Compliance Risks Willow Misty Parks Graduate Assistant Anderson School of Management.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
Ray Karol Collider-Accelerator Department ESSHQ Division Head August 19, 2009 Human Performance Initiative at Collider-Accelerator Department.
Establishing and Maintaining Effective Safety Committees.
1 Configuration Management Performance Indicators Presented By: Lloyd Hancock LRH Consulting Services.
ISM Best Practices Workshop Aurora, CO. [September 13, 2006] Performing Work Within Controls – Fieldwork Supervision A Panel Presentation and Discussion.
Managing programs that promote personal effectiveness.
2006 CMBG Conference BREAKOUT 1: Component Design Basis Inspection Facilitators: Bill Kline/FENOC Sonya Myers/NMC June 11-14, 2006 Richmond, VA.
NUPIC Perspective Stan Mitchell – NUPIC Chair. Presentation Title2 NUPIC Overview NUPIC Organization established to accomplish the following objectives.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Standard Design Process Overview
Key Performance Indicators in Calibration Management
Industry Standard CM Indicators Mike Hayes Exelon Nuclear CM SME CMBG Steering Committee.
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
Planning for Succession
NEI Configuration Control Benchmarking – Sequoyah
Current Plant Performance
NEI Configuration Control Benchmark – Palo Verde
Branch Chief, Concerns Resolution Branch
CMBG Performance Indicator Working Group
Using CM to Maintain the Design Basis
Fast Track Modifications Keith Reinsmith PPL Susquehanna
Break Out 6: CM Organizational Structure
Results of Design Reviews
Analyzing CM-Related Condition Reports
CMBG Performance Indicator Workshop
Best Practices Program Contact – Role & Responsibility Overview
Jim Powers - Director, Fleet Engineering
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Workshop 1: Processing Facility Configuration Information
Configuration Management Operating Experience
BREAKOUT 3: CM Health Reporting
Training Working Group FY2019 EFCOG Working Group Chair Meeting
Student Affairs Committee Vikki Shirley and Dorothy Minear
Presentation transcript:

2006 CMBG Conference Workshop 2: Facilitator: Keith Reinsmith PPL Susquehanna June 11-14, 2006 Richmond, VA

2006 CMBG Conference Problem Statement How do we get the “great unwashed masses” to understand Configuration Management (CM) How do you get management to understand Lack of alignment across organization on CM

2006 CMBG Conference Problem Statement, cont’d Three Considerations - Awareness - Assessment of knowledge - Maintain qualification Station-wide ownership of CM

2006 CMBG Conference Assess CM Knowledge Look at workgroup procedures to see if CM considerations exist (add hooks) Survey (PPL used survey to assess CM knowledge - data fed back to CM group - color coded matrix to see how each group answered questions - INPO used as part of basis for AFI) What does your program look like? -Governing program/procedures - Clear definitions of role/responsibility

2006 CMBG Conference Aggregate review of CM health to flag weaknesses Review training materials for CM content Plant walkdowns to identify CM issues Corrective Action Program (Trend code compare to INPO bubble chart, CM1, CM2, etc.) Trending of CRs for areas of CM awareness weakness Assess CM Knowledge, cont’d

2006 CMBG Conference Getting Management to Understand and Support CM Selling Points for Good CM (Cost/Benefit) -CM health report -Reduced effort / improved worker efficiency -Less prone to human performance error -Improved regulatory inspection results -Reduced forced outages -Improved system availability -Use specific examples of CM failures/strengths

2006 CMBG Conference Increasing CM Awareness Steering committee - management level individuals who review CM health based on CM Key Performance Indicators (KPIs) - Take ownership of CM - Increases overall awareness (trickle down effect) Involve workers in preparing CM process/procedures Cross train workers to understand other aspects of CM - Walk in someone else’s shoes

2006 CMBG Conference Increasing CM Awareness, Cont’d. Posters for each workgroup (e.g. what is a mechanics’ role in CM) Examples of work evolutions and effect on CM Follow a worker with a camera to capture simulated CM problems

2006 CMBG Conference Increasing CM Awareness, cont’d. Benchmarking plants with strong CM awareness Unauthorized modifications - Matrix of types of changes and mechanism to make changes CM pocket pamphlet - use in pre-job briefs CM website Engineering Support (Continuing) training GET - General Employee Training

2006 CMBG Conference Increasing CM Awareness, cont’d. Training Advisory Board “Shock” training Computer Based Training Supervisor Continuing Training (supervisor then provides training to his staff)

2006 CMBG Conference Specific Training Topics Specific Training Topics Examples of consequences of CM failures (loss of defense in depth) 3-Ball Model Terminology Hierarchy of Program starting from License/Design basis Task specific examples - unauthorized mods

2006 CMBG Conference Specific Training Topics, cont’d. Understanding Facility Configuration Information Equilibrium Restoration Diagram Reporting configuration differences Define objective - what do you want them to know (tailored to the individual group)

2006 CMBG Conference Incentives Food Prizes Parking space Positive feedback to workers for identifying CM issues

2006 CMBG Conference Preparation & Methods Need plan for increasing CM awareness including Scope and Schedule

2006 CMBG Conference Challenges Prove positive long-term benefit from CM awareness at worker level Station Management Support Increased workload for CM Group from increase of identification of CM problems Timeliness of response to CM issues discourage workers from future reporting Resource constraints Lack of an existing positive CM Culture