INJECTION PUMP REBUILD Teknik Kendaraan Ringan Semester 5 th Class XII Kompetensi Kejuruan SK-KD 5 TH.

Slides:



Advertisements
Similar presentations
Steering Systems Chapter 44.
Advertisements

J.P. Langston Brake Retrofit
Unit Eight Check Valves, Cylinders, and Motors
Servicing Welch DRYFAST ULTRA Pump Models 2032
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Service Training PV Series 42 PVplus
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Yamaha oil pump rebuild
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
Leg Assembly A step-by step guide to the disassembly and service of a HUBO leg.
Engine Removal and Disassembly
Hydraulic Valve, Pump, Motors
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
The art of Engineering TURBINE PARTS. The art of Engineering TURBINE PARTS Valve Parts A. Stems, Disc, Seats B. Crosshead Assembly, Crosshead Bushings,
© 2012 Delmar, Cengage Learning Ordering Parts, Short and Long Blocks, and Engine Assembly Chapter 55.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
Steering Columns.
Small Engine Reassembly Briggs & Stratton OHV
DISASSEMBLE ENGINE Teknik Kendaraan Ringan Semester 3 th Class XI Kompetensi Kejuruan SK-KD 6 TH.
Cylinder Head Motorcycle Engineering (021) Overhaul Cylinder Head (SK-KD – 04)
Modern Automotive Technology PowerPoint for by Russell Krick
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
CHAPTER 33 Drum Brake Systems.
PARKING BRAKE OPERATION, DIAGNOSIS, AND SERVICE
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
© 2012 Delmar, Cengage Learning Manual Transmission Diagnosis and Repair Chapter 72.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
PRINCIPLE & CONSTRUCTION OF HYDRAULIC PUMPS
COOLING SYSTEM Teknik Kendaraan Ringan Semester 3th Class XI Kompetensi Kejuruan SK-KD 3 TH.
1 DIESEL ENGINE Teknik Kendaraan Ringan Semester 5 th Class XII Kompetensi Kejuruan SK-KD 5 TH.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Fluid Power Control.
FLUID POWER CONTROL ME604C. FLUID POWER MODULE:02 ~ HYDRAULIC SYSTEM COMPONENTS.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Unit III Class II Pneumatic actuators.
STARTER TESTING AND OVERHAUL
ENGINE PARTS IDENTIFICATION
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
ENGINE MODE CODES.
Bilge Pump Service Project Model Service Kit
Steering Systems Topics covered in this presentation:
Teknik Kendaraan Ringan
475, 475V, 475XL 4”-10”.
826YD 21/2”-10”.
Teknik Kendaraan Ringan
Teknik Kendaraan Ringan Dasar Kompetensi Kejuruan
Teknik Kendaraan Ringan
SERVICE TRAINING MANUAL ENGINE LACETTI.
Disassembly and Assembly of A800C-W Electronic Governor Actuator for 7100 Fuel Injection Pump
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
Delphi Fuel pump. Overshoot protection screw. No load throttle adjust
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
5000SS 21/2”- 6”.
850 2½”-10”.
4D-100, 4D-600 2½”- 10”.
LF856 2½”-10”.
880V 21/2”-10”.
C400, C400N, C400Z 21/2”-10”.
375DA 2½”-10”.
M400, M400N, M400Z 21/2”-10”.
856 2½”-10”.
INSTALLATION OF THE STAR MACHINE TWIN MOTOR EVP AND BATTERY
Presentation transcript:

INJECTION PUMP REBUILD Teknik Kendaraan Ringan Semester 5 th Class XII Kompetensi Kejuruan SK-KD 5 TH

DIAGRAM ALUR PENCAPAIAN KOMPETENSI

Here you see the starting point, a pump, seals kit with the control lever seal and driveshaft seal. As usual, all components must be clean with strict cleanliness maintained throughout. Moreover, a good lubrication of parts that push, contact, or slide is essential during the reassembly TEKNOLOGI DAN REKAYASA 3 REBUILT INJECTION PUMP

We should not complain, a rotary pump is worse! Here it is about an hour later. I did not take pictures of the disassembly, go in reverse from what follows if you have doubts for disassembly. Important settings to record: 1.Full load adjusting screw. 2.Speed control lever graduations 3.Governor shaft adjustment screw 2. TEKNOLOGI DAN REKAYASA 4 REBUILT INJECTION PUMP

Get started by doing the distributor head hydraulics, it will always be so de facto. Below are the different components of the delivery valve holder. bushing, spring, shim, needle, and new sealing washer. 3. TEKNOLOGI DAN REKAYASA 5 REBUILT INJECTION PUMP

The copper sealing washer on the delivery valve holder. The finished distributor head. That is done, so it is time to get to the serious mechanicals TEKNOLOGI DAN REKAYASA 6 REBUILT INJECTION PUMP

Its competely disassembled! We see even my jeans clear through the bore. Starting with the fuel feed pump, insert the stator ring TEKNOLOGI DAN REKAYASA 7 REBUILT INJECTION PUMP

Align 180° holes with the the pump housing taps (circled). Then the rotor and vanes TEKNOLOGI DAN REKAYASA 8 REBUILT INJECTION PUMP

First, the rotor. then the vanes using a needlenose plier TEKNOLOGI DAN REKAYASA 9 REBUILT INJECTION PUMP

then the pressure plate. and tightened down TEKNOLOGI DAN REKAYASA 10 REBUILT INJECTION PUMP

Assemble the driveshaft. with the governor drive gear TEKNOLOGI DAN REKAYASA 11 REBUILT INJECTION PUMP

and two rubber dampers.then the thrust plate TEKNOLOGI DAN REKAYASA 12 REBUILT INJECTION PUMP

and the woodruff key that drives the fuel feed pump. Insert the shaft in the pump housing TEKNOLOGI DAN REKAYASA 13 REBUILT INJECTION PUMP

Here is the axial view. In this radial view, you can see the lozenge shaped hole for the timing control TEKNOLOGI DAN REKAYASA 14 REBUILT INJECTION PUMP

Moving on to the next piece, the roller cage and timing pin. The correct alignment for the timing pin TEKNOLOGI DAN REKAYASA 15 REBUILT INJECTION PUMP

An axial view of the cage positioned in the pump housing. Seen from the top TEKNOLOGI DAN REKAYASA 16 REBUILT INJECTION PUMP

To understand how these systems interact, slide the timing pin into the crossover chamber so it protrudes into the timing cylinder. The pin controls the angular advance of the roller cage. Now slide the actuator back out to install the timing piston. This is the final position of the actuator TEKNOLOGI DAN REKAYASA 17 REBUILT INJECTION PUMP

Now we assemble the timing control piston and pivot. 28. TEKNOLOGI DAN REKAYASA 18 REBUILT INJECTION PUMP

This piston slides back and forth in the cylinder, causing the timing pin to pivot the roller cage into advanced position. 29. TEKNOLOGI DAN REKAYASA 19 REBUILT INJECTION PUMP

The piston is subject to two forces during normal running. On the spring side, fuel pump inlet pressure pushes it and the chamber side, the fuel pressure inside the pump housing pushes it the other way. The balance of these two pressures set the timing advance. When the inside ousing pressure is high, the timing is at maximum advance. The open end of the piston will clear the fuel pump inlet gallery. 30. TEKNOLOGI DAN REKAYASA 20 REBUILT INJECTION PUMP

Insert the piston in the cylinder. Now push the pin down the lozenge hole TEKNOLOGI DAN REKAYASA 21 REBUILT INJECTION PUMP

and lock with the pin. 33. TEKNOLOGI DAN REKAYASA 22 REBUILT INJECTION PUMP

Clip the pin with the retainer. 34. TEKNOLOGI DAN REKAYASA 23 REBUILT INJECTION PUMP

Cover the cylinder with the new seal. With the cover screwed on TEKNOLOGI DAN REKAYASA 24 REBUILT INJECTION PUMP

Then on the other side, the timer spring and coldstart advance. 37. TEKNOLOGI DAN REKAYASA 25 REBUILT INJECTION PUMP

There are no controls for electrical coldstart on this car, so I put the usual cover on the cylinder. Insert the cross coupling that drives the rest of the pump TEKNOLOGI DAN REKAYASA 26 REBUILT INJECTION PUMP

Then the rollers. They are shown here in their cage outside the pump. Note the orientation of the washers, which are shaped to the inside curvature of the outer flange. 40. TEKNOLOGI DAN REKAYASA 27 REBUILT INJECTION PUMP

Axial view of the rollers installed. 41. TEKNOLOGI DAN REKAYASA 28 REBUILT INJECTION PUMP

Insert the spring in the center. The spring in position TEKNOLOGI DAN REKAYASA 29 REBUILT INJECTION PUMP

Put the cam disk in, completing the roller cage. Timing is adjusted by the slight rotation of the roller cage relative to the camplate. Note that the plunger drive pin (circled) aligns with the woodruff key of the driveshaft TEKNOLOGI DAN REKAYASA 30 REBUILT INJECTION PUMP

The cam lobes rolling on the cage cause the plunger to reciprocate and rotate simultaneously, building the high pressure for injection. Moving now to the distributor plunger. The spill port (circled) regulates the volume of injected fuel. When the port is open, pressure drops and injecting stops TEKNOLOGI DAN REKAYASA 31 REBUILT INJECTION PUMP

The control collar (below), driven by the governor, adjusts the timing of the spill port. When injecting, the plunger is pushed by the cam. Depending on the position of the governor, the spill port is opened by the plunger stroke. That is the control mechanism of the fuel injection. 48. TEKNOLOGI DAN REKAYASA 32 REBUILT INJECTION PUMP

Insert the distributor plunger in the distributor head. Then the return springs TEKNOLOGI DAN REKAYASA 33 REBUILT INJECTION PUMP

The spacer of the plunger end. 51. TEKNOLOGI DAN REKAYASA 34 REBUILT INJECTION PUMP

Insert the entire distributor head assembly into the pump, but don't tighten it down just yet. The radial view TEKNOLOGI DAN REKAYASA 35 REBUILT INJECTION PUMP

We will now go the governor tension lever and support springs. 54. TEKNOLOGI DAN REKAYASA 36 REBUILT INJECTION PUMP

Support springs go in these holes. This part can be a bit of a challenge getting the springs positioned. 55. TEKNOLOGI DAN REKAYASA 37 REBUILT INJECTION PUMP

The tension lever pivots on three sided bolt-hinges. I modified an old 13mm socket to fit the triangular bolts. Insertion of these bolts with new aluminum washers TEKNOLOGI DAN REKAYASA 38 REBUILT INJECTION PUMP

Now we are installing the lever assembly from the top. 58. TEKNOLOGI DAN REKAYASA 39 REBUILT INJECTION PUMP

To do this, remove the distributor head (which you did not bolt down) and position the lever assembly so it looks like this. Notice on the plunger shaft the spill port (green), the distributing slit (red), and four intake slits (green) extending into the high pressure chamber. The plunger is galleried to facilitate all this. 59. TEKNOLOGI DAN REKAYASA 40 REBUILT INJECTION PUMP

The hydraulic manifold ready to assemble with the return springs. Now we are ready to install the head assembly and screw it in. This may be a bit of a challenge since the springs tend to fall out, so have some patience here TEKNOLOGI DAN REKAYASA 41 REBUILT INJECTION PUMP

The top view. Turning now to the centrifugal governor, here are all the parts TEKNOLOGI DAN REKAYASA 42 REBUILT INJECTION PUMP

Assemble the flyweights. Put that assembly into the rotor TEKNOLOGI DAN REKAYASA 43 REBUILT INJECTION PUMP

Replace the governor sleeve. Note the calibration hole that modulates initial injection according to load. 66. TEKNOLOGI DAN REKAYASA 44 REBUILT INJECTION PUMP

Insert the shaft through the rotor. The governor adjustment screw TEKNOLOGI DAN REKAYASA 45 REBUILT INJECTION PUMP

Washers between the rotor and housing. 69. TEKNOLOGI DAN REKAYASA 46 REBUILT INJECTION PUMP

Install the rotor assembly. The adjustment of this shaft is important, because it modulates initial injection according to load (along with vacuum, if so equipped). This is why it is a good idea to mark its position at disassembly TEKNOLOGI DAN REKAYASA 47 REBUILT INJECTION PUMP

Use a hex key to screw in the shaft to the same position it was before disassembly. Use two wrenches at the same to tighten the time jam nut so the shaft is locked. Now the pump housing is complete, only needing the pump cover and the fuel pressure regulation valve. 72. TEKNOLOGI DAN REKAYASA 48 REBUILT INJECTION PUMP

On the cover, drive out the old control shaft bushing. 73. TEKNOLOGI DAN REKAYASA 49 REBUILT INJECTION PUMP

Insert the new bushing from the inside. Use an old bolt and large washers to clamp the bushing down flush TEKNOLOGI DAN REKAYASA 50 REBUILT INJECTION PUMP

Put in the control shaft and yoke. The yoke assembly holds three springs, the governor spring, the partial-load spring and the idle damper spring. Close up of the governor linkage. Retract the rod so the flat section in the rod (green) slips into the narrow slot in the lever (red) TEKNOLOGI DAN REKAYASA 51 REBUILT INJECTION PUMP

Assemble the speed control lever with its return spring and new seal. 78. TEKNOLOGI DAN REKAYASA 52 REBUILT INJECTION PUMP

Here you see the idle adjusting screw on the top of the picture, and the maximum speed screw at he bottom. This is one place where you need to identify the lever's setting at disassembly. Adjust it to the same graduation. 79. TEKNOLOGI DAN REKAYASA 53 REBUILT INJECTION PUMP

The regulating valve sets the proper fuel pressure for the timing advance and fuel feed for the distributor plunger. Install it now with new seals. 80. TEKNOLOGI DAN REKAYASA 54 REBUILT INJECTION PUMP

The fuel shutoff solenoid. 81. TEKNOLOGI DAN REKAYASA 55 REBUILT INJECTION PUMP

Notice that immediately above the solenoid is the full load adjusting screw. You may prefer to mark the setting of this screw before disassembly. 82. TEKNOLOGI DAN REKAYASA 56 REBUILT INJECTION PUMP

Last piece, the driveshaft seal. 83. TEKNOLOGI DAN REKAYASA 57 REBUILT INJECTION PUMP

You have done it! Not as hard as you thought it would be. All that is needed now is to mount the pump! 84. Sumber : BOSCH Germany TEKNOLOGI DAN REKAYASA 58 REBUILT INJECTION PUMP

TEKNOLOGI DAN REKAYASA 59 Bibliography: Bosch Injection Pump Repair Book

Presented by Anang Waskito SMK Negeri 1 Magelang