Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11.

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

9 x9 81 4/12/2015 Know Your Facts!. 9 x2 18 4/12/2015 Know Your Facts!
1 x0 0 4/15/2015 Know Your Facts!. 9 x1 9 4/15/2015 Know Your Facts!
1 x0 0 4/16/2015 Know Your Facts!. 1 x8 8 4/16/2015 Know Your Facts!
3 x0 0 7/18/2015 Know Your Facts!. 4 x3 12 7/18/2015 Know Your Facts!
VERMONT STATE COLLEGES WHO WE ARE. VERMONT STATE COLLEGES SHARED SERVICES From the data center: (located in a state-owned building) Wide-area network.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Electrical Distribution: How to Ensure Safe Powering and High Availability for LHC Machine Protection Systems? V. Chareyre / EN-EL Machine Protection Panel.
CERN Mobile network migration Rodrigo Sierra Communication Systems group, IT Department, CERN.
Electrical power distribution in experiments W.Iwanski.
This is the way an organisation distributes the data across its network. It uses different types of networks to communicate the information across it.
Experiences Deploying Xrootd at RAL Chris Brew (RAL)
RAID Shuli Han COSC 573 Presentation.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
GGUS summary ( 4 weeks ) VOUserTeamAlarmTotal ALICE ATLAS CMS LHCb Totals 1.
KIDDE FIRE PROTECTION Vega Peer to Peer Networking.
4 x1 4 10/18/2015 Know Your Facts!. 5 x /18/2015 Know Your Facts!
3 x0 0 10/18/2015 Know Your Facts!. 11 x /18/2015 Know Your Facts!
How can we reduce the “no beam„ time? Walter Venturini Delsolaro D. Arnoult, S. Claudet, G. Cumer, K. Dahlerup Petersen, R. Denz, F. Duval, V. Montabonnet,
UNIT -1. DATA COMMUNICATIONS The term telecommunication means communication at a distance. The word data refers to information presented in whatever form.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
Control, monitoring and safety aspects of electrical distribution in the Atlas experiment W.Iwanski PH/ESE-BE.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
13 October 2004GDB - NIKHEF M. Lokajicek1 Operational Issues in Prague Data Challenge Experience.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Chapter 1 : Computer Networks.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Christian Michor Andreas Spitaler. Principal A fixes that fail structure consists of a balancing loop which is intended to achieve a particular result,
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
Fault Tree Analysis Why do we need fault tree analysis? What is it? Why do we use it? Why this matters to you How it works Bridgestone/Firestone Brief.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
WP 17.1 Civil Engineering Point 1 - Networks LS2 COMMITTEE – CERN – Pieter Mattelaer (SMB-DI)
YETS & LS2 Works EN-EL / Power distribution
EYETS Works EN-EL [ FC excluded ]
Computer Network Collection of computers and devices connected by communications channels that facilitates communications among users and allows users.
YETS & LS2 Works EN-El on LHC / Power distribution
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Fault Tolerant [I/o] Networks Applied to ship control
Network/Controls issue 15 September h00 – 9h30
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
the high-voltage network of CERN ToMORROW
the CERN Electrical network protection system
YETS & LS2 Works EN-EL / Power distribution
netready - Partial use case descriptions -
ZOOM INSTALLATION WIZARD STEP 1
Stereotyping Aim Key Word To understand the meaning of stereotyping and how it can be both positive and negative Key Word Stereotype.
F Duval, on behalf of EN/EL
Power cut 18kV cable for EMD404/E9 is heating
Learn Your 2x Facts.
F Duval, on behalf of EN/EL
Friday 28 October 2011.
Presentation transcript:

Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11

1) FACTS

- 3 major events in 30 min (11:03, 11:11, 11:34) - Discrimination not easy but last was worst (short on Verbois OHL) - Impact on several points (starting contact: EHT2 pulsed, Diesel network, Meyrin admin. loop) - False intertrip on MP7 (second in a row after 3 month of storms) - Autotransfer failed to refeed SEM12 (Io on couplers) 1) FACTS

- Situation after autotransfert 11:34:48 - All machines off - LHC loop and ATLAS partially off - MEYRIN reenergized from Swiss network - DIESEL generators started well on all LHC points - Situation after Piquet reconfiguration 13:50 - Piquet at work at 12:15 (difficult to understand) - fail to refeed loop from LHC2 ( Io) at 12:58 - LHC loop fed from LHC2 (in two steps) 13:28 - ATLAS fully refed at 13:49 - Network back to the standard configuration at 16:00 1) FACTS

2) ANALYSIS -Another false intertrip on MP7 - second in a row after 3 months of storm seasons - intertrip will be deactivated ASAP - Fiber optics will be installed for intertrips - Io twice attempting to reenergized SEM12 (LHC loop + ATLAS) -No explanation yet - Unexpected and complex situation for Standby service - 2h15 before renergizing LHC1 (too long)