Service Accounting Data Comparison Action Item 2014-1113-03 CCSDS CSSM Technical Meetings Pasadena, CA, USA 23 – 27 March 2015 Jessica Reinert NASA/GRC.

Slides:



Advertisements
Similar presentations
CSTS Service Instance Identification Summary of CSTS Discussions on M.Götzelmann.
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
SGSS Extensions to and Modifications of CCSDS Space Communication Cross Support Service Management October 2012 John Pietras Global Science and.
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
CA ERwin r8 installing the application things you should know before installing your CA ERwin r8 Data modeling application.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Metrics in Spiritual Care
Database Software Creation Process Arvin Meyer, MCP, MVP
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Paper Title Your Name CMSC 838 Presentation. CMSC 838T – Presentation Motivation u Problem paper is trying to solve  Characteristics of problem  … u.
Uniqueness of user names is enforced Customer information logged to database Require contact information as well as address address will.
Databases and Processing Modes. Fundamental Data Storage Concepts and Definitions What is an entity? An entity is something about which information is.
CS292 Computational Vision and Language Visual Features - Colour and Texture.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Environment Change Information Request Change Definition has subtype of Business Case based upon ConceptPopulation Gives context for Statistical Program.
Description; compare-contrast; narrative; definition; opinion; cause- effect; classification; process.
1 NASA OSMA SAS02 Software Reliability Modeling: Traditional and Non-Parametric Dolores R. Wallace Victor Laing SRS Information Services Software Assurance.
1//hw Cherniak Software Development Corporation ARM Features Presentation Alacrity Results Management (ARM) Major Feature Description.
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
MDS Enhancements TSH User Group Meeting MDS Base Modifications 248 Cases Updated this Year Cases Completed By System Area ODBC2 Purchasing22 Pricing7.
An Introduction to Software Architecture
Topics Covered: Data Processing Data Processing Information Examples of data and information Examples of data and information Difference between data.
Representing variables according to the ISO/IEC standard.
CSSM Meeting Summary CCSDS CSSM Technical Meetings London, UK 10 – 14 November 2014.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
DLR ITCT (Inputs To Current Topics) CCSDS CSSM Technical Meetings London, United Kingdom 9 November – 14 November 2014 Friendly provided to you by: Marcin.
Software Engineering Chapter 7 Fall Capturing the Requirements as Use Cases Capturing the Requirements as Use Cases By using use cases analysts.
NASA Space Network Ground Segment Sustainment (SGSS) Schedule Request SMWG Boulder, CO 31 October – 4 November 2011 John Pietras GST, Inc.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
SacProNet An Overview of Project Management Techniques.
Learning Phase at Head Ends 1 Edge Events Appliance Table Input Output by Naoki ref: M. Baranski and V. Jurgen (2004) by Josh Implemented in Java with.
© 2008 Prentice Hall2-1 Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process.
Basic Probability Permutations and Combinations: -Combinations: -The number of different packages of data taken r at time from a data set containing n.
Test Plan Outline. Key Points from the Narrative process is ad hoc a lot of code reuse usability is very important accuracy and interoperability are problems.
Mr Conti 28th March 2014 Lesson Aim To learn about different types of software that are produced for computer systems. Lesson Outcomes Good – will be able.
The Project Management Life Cycle. What is the Project Management Life Cycle? A project life cycle simply includes the necessary steps, from beginning.
Requirements Capture. Four Steps of requirements capture List candidate requirements Understand system context Capture functional requirements Capture.
UML-1 3. Capturing Requirements and Use Case Model.
Environment Change Information Request Change Definition has subtype of Business Case based upon ConceptPopulation Gives context for Statistical Program.
UML-1 8. Capturing Requirements and Use Case Model.
1 Computing Challenges for the Square Kilometre Array Mathai Joseph & Harrick Vin Tata Research Development & Design Centre Pune, India CHEP Mumbai 16.
CSSM Meeting Summary CCSDS CSSM Technical Meetings Pasadena, CA USA 23 – 27 March 2015.
Major Information Flows in the Production Process
Configuration Profile Development Approach Bakeoff: Build Up Results CCSDS Spring Workshop Pasadena, CA March 2015 Anthony Crowson Telespazio VEGA.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 6 Need Identification and Specification.
Trajectory Predictions Data Formats Draft White Book CCSDS CSSM Technical Meetings Pasadena, CA, USA 23 – 27 March 2015 Jessica Reinert NASA/GRC.
Internal and Confidential Cognos CoE COGNOS 8 – Event Studio.
Using patterns to determine the main point the author is trying to convey.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
Oracle apps scm Online Training & Corporate Training Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC.
Oracle Apps Technical Online Training Introduction to ERP  Definition of ERP, Overview of popular ERP’S Comparison of Oracle Apps with other ERP’S Types.
Requirements Determination
Systems Analysis and Design in a Changing World, Fifth Edition
NASA Earth Science Data Stewardship
Flooding Walkdown Guidance
Analysis ready data: definition document
Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e.
State Electronic Requisition
Penny.
Item 20: Price and Volume Measures
Approaches to Accounting and Auditing for Unallowable costs
Web-based Imaging Management System Working Group - WIMS
[Your Product or Company Name Here]
Presentation transcript:

Service Accounting Data Comparison Action Item CCSDS CSSM Technical Meetings Pasadena, CA, USA 23 – 27 March 2015 Jessica Reinert NASA/GRC

Service Accounting – Inputs to AI Information captured during the London meetings DLR: Description of ad hoc reporting that is performed and applicable metrics / characteristics ESA: ESTRACK KPI for Network Service accounting & Performance measurement - How are the costs of Units of Service (UoS) determined and associated material - Describes report sent upon completion of each pass NASA: SN SGSS Service Accounting - User Mission Platform - Schedule

Observations Types of metrics observed (May not match CCSDS definitions) Contact/Pass Identifier Quantity Quality (of Executed Services/passes) Request (Service and other) and Event Resource Timing/Duration Accounting metrics Include both User Mission Platform specific and network centric Metrics from organizations covered from when services are requested to performance / quality of service execution Do we want them all?

Service Accounting A combination of raw metrics and calculated metrics were provided Some overlap between all three sets of metrics Kept cost data separate from technical data reported to the Missions. Is the difference between ESTRACK technical outage and SGSS Maintenance service requests are whether or not they planned?

Similar Metrics DLRESTRACKSN SGSS UoS for periodTotal Duration of Services UoS durationDuration of the Execution Reporting periodTime Interval Service Agreement Number of good passes (not mission specific, others are) PassSuccessfulUser Mission Platform meeting Contact Duration per Time Interval Service Agreement Number of requested passes Number of Processed User Requests Time for a tour of the spreadsheet

Per Service Package (applies to scheduling and service execution) Requested services Executed services Metrics for a particular service type (applies to service execution) Number of Frames/CLTUs/etc Per Service Agreement Counts of passes? (promised in service agreement v. requested by User v. executed by provider) For a particular unit of time