Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October 2011 - H. Reymond.

Slides:



Advertisements
Similar presentations
ITIL: Service Transition
Advertisements

The System Development Life Cycle
Industrial Avionics Working Group 18/04/07 Defining the Safety Case Architecture IAWG Modular Certification.
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
UNIT 17 Computing Support.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
National Institute Of Science & Technology GPIB Controllers Ashutosh Pradhan 1 EI DECEMBER-2004 GPIB CONTROLLERS Technical Seminar Presented By.
S/W Project Management
Introduction to Software Quality Assurance (SQA)
Industrial Control Engineering PXI software support and accelerator integration.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Software Configuration Management
RUP Implementation and Testing
Control System and Software Engineering Process Elder Matias
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Chapter 14 Information System Development
1 A tutorial on the VISIR Open Lab Platform and an invitation to join the VISIR Group How to open a local electronics laboratory for remote access
Value and Supply Chain Management. What is Logistics? The Institute of Logistics defines logistics as the management of the flow of goods, information.
Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Integrating the Healthcare Enterprise Applying Integration Profiles: Marketing and Product Development Glen Marshall Co-Chair, IHE IT Infrastructure Planning.
การนำระบบไปใช้ Implementation อ.พัฒนพงษ์ โพธิปัสสา.
Software Quality Assurance
IS Methodologies. Systems Development Life Cycle - SDLC Planning Planning define the system to be developed define the system to be developed Set the.
An Introduction to Software Engineering. Communication Systems.
Notes of Rational Related cyt. 2 Outline 3 Capturing business requirements using use cases Practical principles  Find the right boundaries for your.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Software Maintenance Speaker: Jerry Gao Ph.D. San Jose State University URL: Sept., 2001.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
19/05/10FV 1 HyTec crate – DCS integration issues.
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Rod Fontecilla, Ph.D. Vice President Application Services Nov 2015 Deploying Applications Using DevOps.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
CSCE 240 – Intro to Software Engineering Lecture 2.
IPS Infrastructure Technological Overview of Work Done.
Instrumentation of the Controls Configuration Directory Service J. Luis González Arias BE3528 Software Developer for the Accelerator Controls Configuration.
Industrial Control Engineering Infrastructure: EN/ICE needs Wrap up Mandate: WG Infrastructure to establish the needs for an ICE server pool and study.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
FESA S. Deghaye for the FESA team BE/CO. What happened since April? followed by “Our plans”
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
Review of the processes released in the framework of the MMP Goran Perinić.
Members Sponsor: BLANCO Enrique Participants: BRADU Benjamin CHARRONDIERE Cédric COPY Brice TOURNIER Jean-Charles Working group for projects – Initial.
Introduction to ITSM processes. CONFIDENTIAL Agenda Problem Management  Overview  High Level process Change Management  Overview  High Level process.
A Software Defined Instrumentation Approach to Set-Top-Box Testing.
Industrial Control Engineering ADE Rapid Application Development Environment.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
Configuration Control (Aliases: change control, change management )
Electronic Systems Support EPTAB Electronics Pool - Status Report 3 May 2006 Catherine Moine.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
 System Requirement Specification and System Planning.
Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October H.
ITIL: Service Transition
Introduction Edited by Enas Naffar using the following textbooks: - A concise introduction to Software Engineering - Software Engineering for students-
CONS and HL-LHC day Analysis of needs from BE-CO
Chapter 18 Maintaining Information Systems
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Me, FESA classes, Testing
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
1.Introduction to Rational Unified Process (RUP)
Group Manager – PXI™/VXI Software
the CERN Electrical network protection system
Development of built-in diagnostics in the RADE framework (EN2746)
Introduction to Software Engineering
Introduction Edited by Enas Naffar using the following textbooks: - A concise introduction to Software Engineering - Software Engineering for students-
Presentation transcript:

Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October H. Reymond - EN/ICE

Industrial Controls Engineering Department Why to Establish the CERN PXI Users Group ? 2  To allow knowledge sharing about PXI  Experience about HW / SW  Known issues on drivers, cards, LV-RT, …  To promote the use of PXI at CERN by helping new users  Selecting the best PXI solution that fits their needs  Best programming practices (i.e. RT, fast triggering, …)  To be stronger actors when requesting new features/improvements  Asking development of CERN specific using  Improving existing PXI cards for our needs

Industrial Controls Engineering Department CERN PXI Users Group 3  Mandate of the CERN PXI Users group :  Validate a catalogue of recommended components  Build knowledge base for configuration & use  Define the critical spare parts, managed by EN-ICE

Industrial Controls Engineering Department 4  More than 1500 PXI products are available  Proposal for a reduced list of well known equipment  From National Instruments and other firms  Based on most popular PXI cards used at CERN…  … and on domain specific components Catalogue of recommended components RF Generation & Analysis Instrument control VME GPIB RS-232/422/482 VXI Sound & Vibration

Industrial Controls Engineering Department 5  Several cards have the same purpose but with different specifications  i.e. DAQ cards  We propose to keep multifunction cards with the highest capabilities  The idea of this catalogue is to give a best support to the recommended components  It will be established on yearly basis and will be updated according to new requirements and obsolete devices Catalogue of recommended components

Industrial Controls Engineering Department 6 An Example from ITER

Industrial Controls Engineering Department Shared knowledge base 7  Build a knowledge base for configuration & use  People interested will be asked for examples, proven solutions, …  EN/ICE will gather information from CERN users  A Web tool will be developed  Examples of code for specific PXI cards  Programming structures by app. area (RT, fast ACQ, multi cards trig.)  Known issues / fixes  Information about restrictive features or device behavior  This will not be a copy of the  Only data to use or debug PXI systems  No specifications or guidelines for selecting components

Industrial Controls Engineering Department Shared knowledge base 8 PXI Support

Industrial Controls Engineering Department Critical spares identification 9  Define the critical spare parts, managed by EN/ICE  Based on risk analysis & impact on accelerator availability  Criticality is different for a test bench & operational system  Depending on the number of cards in use  On request also specific cards could be added to the spare list  For chassis, controllers and cards  EN/ICE will buy and store these components  They will be available for participating clients  On demand a spare component will be delivered  The user will then refund EN/ICE to replace this component  For operational systems the delivery could be done by SBS (24/24)

Industrial Controls Engineering Department Support for recommended & critical systems 10  Monitoring tools (based on DIAMON or MOON)  Technical Support, through our actual LabVIEW support (Odd O. Andreassen, Cedric charrondiere, Alessandro Raimondo, Adriaan Rijllart, Hubert Reymond)  For obsolescent systems, proposal for staged update  Remote reboot (standard BE/CO solution)  Extended warranty from NI  Discussions in progress

Industrial Controls Engineering Department PXI in CERN Accelerator Complex 11 LINAC 4

Industrial Controls Engineering Department Questions 12