Cavity Measurements By Aaron Cheng 4 May 2007. 2 Overview RF measurements Waveguide-coax transition.

Slides:



Advertisements
Similar presentations
RFQ development for high power beams
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Normal-Conducting Photoinjector for High Power CW FEL Sergey Kurennoy, LANL, Los Alamos, NM, USA An RF photoinjector capable of producing high continuous.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
8 th ESLS RF Meeting 29 th – 30 th Sep Daresbury Lab 500 MHz ELETTRA Input Power Coupler B. Baricevic, A. Fabris, C. Pasotti.
Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
2.1GHz cavity without cell-to-cell coupling slots – 1.875” beam pipe Binping Xiao Aug
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
1.3GHz Input Coupler for ILC
LCLS-II FPC Aluminum Waveguide Box Karen Fant with work done by Chris Nantista and Ken Premo 6/24/2015.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
L. Xiao, LHC-crab-cavity WebEx meeting, Dec.09, 2008 Baseline Design: Significant coupling of input power to LOM/SOM couplers FPC HOM Update on LHC Crab.
Coupler Multipactor Studies F. Wang, B. Rusnak, C. Adolphsen, C. Nantista, G. Bowden, Lixin Ge.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
A 350 MHz, 200 kW CW, Multiple Beam IOT Lawrence Ives, Michael Read, David Marsden, R. H. Jackson, Thuc Bui Calabazas Creek Research, Saratoga, CA. USA.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
13/Nov/ mm STF2 Coupler Design Content 1.Motivation 2.40mm Design 3.“Preliminary” Result by HFSS 4.“Tentative” Conclusion 5.Future.
Mechanical Analysis Thermal Analysis Ø78 mm Ø106 mm L CLASSE facilities are operated by the Cornell Laboratory for Elementary Particle Physics (LEPP) and.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
BARC’s CW Power Coupler at 325 MHz for IIFC Rajesh Kumar BARC alternate mail id:
ESS RFQ B. POTTIN and RFQ team CEA-IRFU. RFQ design Strategy 3 RF codes to validate calculations Consideration of machining and assembly possibilities.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
TTF-III Coupler Parts Processing and Multipacting Simulation using Magic Faya Wang Dec Wake Fest 07 – ILC wakefield workshop at SLAC.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
TDR guideline discussion on Cavity Integration
T5.2: Harmonization - Material and Component Reference
Physics design on Injector-1 RFQ
Status of the Front End Test Stand April 2007.
12 GHz High Power RF components requirements for CEA activities
Findings in RF Power Couplers after operation on cavities in PXFEL2
RF-Dipole Cavity Update
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
(i.e. the 4-vane cold model)
CEPC-650MHz Cavity Cryomodule
V. Veshcherevich Cornell University
Cryomodule Design for CW Operation 3.9 GHz considerations
SNS Coupler Shipping Plans
Presentation transcript:

Cavity Measurements By Aaron Cheng 4 May 2007

2 Overview RF measurements Waveguide-coax transition

3 RF measurements FETS 4-vane RFQ copper cold model in Imperial College

4 RF measurements Input couplers used

5 RF measurements Some coupling stability problems

6 RF measurements Some coupling stability problems

7 Waveguide-coax transition Studying doorknob wg-coax Coupler with coaxial RF window S11 = dB S21 = dB DescriptionValue [mm] radius of coax conductor33.5 Radius of coax insulator77 coax line length300 doorknob distance from wg end plate doorknob height doorknob radius thickness of doorknob wall10.6 waveguide length1000 window position from waveguide10 window thickness6

8 Studying doorknob wg-coax Coupler with planar RF window S11 = dB S21 = dB DescriptionValue [mm] radius of coax conductor33.5 Radius of coax insulator77 coax line length300 Doorknob distance from wg end plate doorknob height doorknob radius200 thickness of doorknob wall10.6 waveguide length1000 window position from doorknob96.25 window thickness3.5 Waveguide-coax transition

9 Studying doorknob wg-coax Coupler with planar RF window S11 = dB S21 = dB ParameterValue [mm] radius of coax conductor33.5 Radius of coax insulator77 coax line length300 coax distance from waveguide end plate doorknob height doorknob radius thickness of doorknob wall10.6 waveguide length1000 window inner radius229 window thickness6 Waveguide-coax transition

10 Studying t-bar wg-coax Coupler with coaxial RF window S11 = dB S21 = dB DescriptionValue [mm] coax line conductor radius33.5 coax line insulator radius77 coax line length-200 t-shape distance from waveguide end- plate t-shape height153 window height11 position of window from waveguide128.5 Waveguide-coax transition

11 Studying t-bar wg-coax Coupler with planar RF window S11 = dB S21 = dB DescriptionValue [mm] coax line conductor radius33.5 coax line insulator radius77 coax line length-200 distance from waveguide end-plate120.5 t-shape height window thickness8.7 position of window from t-bar center45 Waveguide-coax transition

12 Thermal analysis Vacuum pumping ports and requirements Electron probes and threshold Connecting flanges Waveguide-coax transition

13 Summary 1.Bead pull measurement to be conducted more with unbrazed and brazed RFQ 2.Waveguide-Coax transition will stop at current status until after PAC conference 3.Other matters: Microwave signal generator and amplifier have arrived, currently placed in RAL