1 2. Overview of WRF Program Status WRF Executive Oversight Board Meeting 2 30 July 2004.

Slides:



Advertisements
Similar presentations
WRF Modeling System V2.0 Overview
Advertisements

1 Generic logging layer for the distributed computing by Gene Van Buren Valeri Fine Jerome Lauret.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Eta Model. Hybrid and Eta Coordinates ground MSL ground Pressure domain Sigma domain  = 0  = 1  = 1 Ptop  = 0.
Nesting. Eta Model Hybrid and Eta Coordinates ground MSL ground Pressure domain Sigma domain  = 0  = 1  = 1 Ptop  = 0.
1 ESMF in Production at NCEP Mark Iredell Chief NCEP/EMC Global Climate and Weather Modeling Branch May 23, 2006 NCEP: “where America’s climate, weather,
Mesoscale & Microscale Meteorological Division / NCAR ESMF and the Weather Research and Forecast Model John Michalakes, Thomas Henderson Mesoscale and.
Who does what and when? Mary Rowlatt MDR Partners.
Marine Recreational Information Program Data Management Standard (MDMS) NOAA Environment Data Management Conference Data Management Planning Workshop June.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
A Foundation for the Future Building blocks for comprehensive connectivity Tracy Schroeder Vice President, Information Services and Technology.
Implementation of Project Governance at the Center Level
WRF Outline Overview and Status WRF Q&A
Open and Shared Information System OaSIS. SUNCOM’s Standard Business Process Centralized ordering for the enterprise Maintenance of an enterprise inventory.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
Metadata Creation with the Earth System Modeling Framework Ryan O’Kuinghttons – NESII/CIRES/NOAA Kathy Saint – NESII/CSG July 22, 2014.
CCSM Software Engineering Coordination Plan Tony Craig SEWG Meeting Feb 14-15, 2002 NCAR.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
1 4. Draft Charters WRF Executive Oversight Board Meeting 2 30 July 2004.
ESMF Application Status GMAO Seasonal Forecast NCAR/LANL CCSM NCEP Forecast GFDL FMS Suite MITgcm NCEP/GMAO Analysis Climate Data Assimilation.
1 The WRF Developmental Testbed Center (DTC) Bob Gall A facility where the NWP research and operational communities interact to accelerate testing and.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
CESM/ESMF Progress Report Mariana Vertenstein NCAR Earth System Laboratory CESM Software Engineering Group (CSEG) NCAR is sponsored by the National Science.
DTC HWRF Task AOP2009 & AOP /01/2009 Ligia Bernardet.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Summary of EMC-DTC Meeting June 18, DTC AOP 2010 Tasks to be continued from 2009: – WRF-NMM + WPP community support (Jamie Wolff) – Reference configurations.
3 rd Annual WRF Users Workshop Promote closer ties between research and operations Develop an advanced mesoscale forecast and assimilation system   Design.
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
1 5. Overview of DTC Status and Annual Operating Plan WRF Executive Oversight Board Meeting 2 30 July 2004.
S2I2: Enabling grand challenge data intensive problems using future computing platforms Project Manager: Shel Swenson (USC & GATech)
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
UNCLASSIFIED NCES Net-Centric Enterprise Services Lynda D Myers DISA, Center for Enterprise Capabilites February 2003.
CSC480 Software Engineering Lecture 10 September 25, 2002.
1 Report: JAG/OCM Operational Community Modeling COPC Meeting AFWA, Omaha, NB 2 May, 2007.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Fall COPC 2008 AFWA, Omaha, NB 13 November 2008.
1 National Environmental Modeling System (NEMS) Status M. Iredell and EMC Staff.
Transition to Practice. We define “Transition to Practice” as making privacy tools and systems operational.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
WRF Software Development and Performance John Michalakes, NCAR NCAR: W. Skamarock, J. Dudhia, D. Gill, A. Bourgeois, W. Wang, C. Deluca, R. Loft NOAA/NCEP:
1 1.Agenda: WRF ExOB Meeting April Meeting Agenda and Objectives(Dr. N. Seaman, Prog. Coord.) 8:30 – 8:40 am 2.Overview of N7C Mission(Dr.
Toward GSI Community Code Louisa Nance, Ming Hu, Hui Shao, Laurie Carson, Hans Huang.
Bill Kuo DTC Science Advisory Board. Outline Charge of DTC Science Advisory Board (SAB) Membership of DTC SAB Operation of DTC SAB Review of DTC tasks.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
The NOAA Environmental Modeling System at NCEP Mark Iredell and the NEMS group NOAA/NWS/NCEP Environmental Modeling Center June 12, 2014.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Higher Resolution Operational Models
Geospatial Line of Business FGDC Steering Committee Meeting October 23, 2006.
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
12 th Meeting of the GBIF Participant Nodes Committee 6-7 October 2013, Berlin, Germany Towards a generic work programme for a Node Olaf Bánki Senior Programme.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GNSO Council Restructure Enhance & Support SGs/Constituencies Improve Communications & Coordination Revise the Policy Development Process Adopt a WG Model.
Project Execution Methodology
Developmental Testbed Center: Governance highlights
Implementation Strategy July 2002
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Strategic & Operational Planning:
CIM Model Manager Report
Mariana Vertenstein CCSM Software Engineering Group NCAR
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
Team 7- SCRIPTONOMICS Advanced movie script analytics made simple
Executive Project Kickoff
A brief introduction to NEMS
Presentation transcript:

1 2. Overview of WRF Program Status WRF Executive Oversight Board Meeting 2 30 July 2004

2 A Three-phase Strategy Phase 1: Develop and implement WRF as the next-generation mesoscale NWP modeling system, infrastructure and process… - To activate inter-organizational collaborations between research and operations - To streamline the transfer of new science into both research and operations Phase 2: Use the WRF process and infrastructure to sustain the flow of new science and technology into the WRF modeling system to improve operations and to open new research opportunities Phase 3: Extend the WRF collaboration into other modeling areas of mutual interest— e.g., Ocean modeling, Global modeling, Diagnostic and Statistical post-processing

3 Phase 1 Goals 1. Establish a common modeling infrastructure that facilitates inter-organizational collaboration for the development and transfer of new science into a common WRF mesoscale modeling system for research and operations 2. Create and release WRF as the next-generation mesoscale NWP modeling system supported to the research community 3. Implement WRF model and infrastructure as the next- generation mesoscale NWP system used in operations 4. Create a sustainable repeatable process that facilitates inter- organizational collaboration to develop and transfer new science into the common mesoscale NWP modeling infrastructure 5. Develop a plan for Phases 2 and 3

4 The WRF Modeling Infrastructure is two-fold 1a.WRF Software Infrastructure : 1b.Organizational Infrastructure: Research Community Operational Community DTCOTCs New Science and Technology

5 Status of Desired Outcomes – Phase 1, Goal 1a Capability Metrics Status Susp.Date - 2 WRF cores released to NCAR, FSL, NCEP, AFWA, Done Sept ‘03 & Univs (T) - 2 WRF cores released to community as single On track Aug ‘04 Reference code, with physics interoperability * (T) - I/O interoperability between COAMPS and WRF Discuss’n TBD Reference code (T) - Physics interoperability between COAMPS and WRF (O) Pending TBD - Core interoperability: 3 WRF cores released to Pending TBD community as single Reference code (O) “A common WRF modeling infrastructure established that provides interoperability to the WRF system at level of…” “Software Infrastructure, allowing… - Input/output-field exchange (Threshold) - Physics exchange (Threshold) - Dynamic-core exchange (Objective) …among WRF participants.” * Blue indicates progress since WRF ExOb mtg. of 1 Dec ‘03

6 Status of Desired Outcomes – Phase 1, Goal 1b Capability Metrics Status Susp.Date - DoD OTC proposal submitted and approved (T) Done Apr ’03 - DTC (Central) proposal approved (T) Done Mar ’04 - DTC functional (O) Done Mar ’04 - Distributed-DTC TORs written and approved (T) In Progress Sep ‘04 - Distributed DTC functional (O) Pending TBD - OTC functional at DoD (AFWA/FNMOC) (O) - AFWA Done Jul ‘04 - FNMOCIn Progress Sep ’04 - NCEP OTC proposal submitted and approved (T) Delayed Oct ’04 - OTC functional at NCEP (O) Pending TBD “A common WRF modeling infrastructure established that provides interoperability to the WRF system at level of…” “ Organizational Infrastructure that… - Defines institutional roles of DTC and OTCs (Threshold) - Establishes common DTC (Objective) - Establish OTCs (NCEP + shared DoD).”(Objective) 6

7 Status of Desired Outcomes – Phase 1, Goal 2 “WRF modeling system created and released to the research community at a level that defines and supports…” “Reference code for one core to the research community (Threshold) Reference code for three cores to the research (Objective) community.” Capability Metrics Status Susp.Date - Eulerian mass core (WRFv1.0) in code repository Done Jun ‘03 (Reference code) and supported to community (T) - WRFv2.0 Advanced Research WRF (ARW) Reference Done May ‘04 code with two-way grid nesting supported to community (tutorial) (T) - One core supported with grid and obs nudging (T) On track Jun ’05 - WRF Reference code with two cores supported to On track Jun ’05 community (O) (tutorial) - WRF with two-way grid nesting for two cores supported On track Dec ’05 to community (O) (documentation + tutorial) -WRF with three cores supported to community (O) Pending TBD (documentation + tutorial) 7

8 Status of Desired Outcomes – Phase 1, Goal 3 “WRF model and infrastructure implemented as the next- generation mesoscale NWP system used in operations …” “… At 2 operational NWP centers(Threshold) At all three operational NWP centers.”(Objective) Capability Metrics Status Susp.Date - End-to-end real time WRF experimental systems running Done Oct ‘03 daily at NCEP and AFWA (T) - DTC retrospective testing of WRF completed and Done Jun ’04 statistics available (as per WRF Test Plan) (T) - WRF (two cores) implemented operationally at NCEP On track Sep ’04 in Hi-Res Window domains (T) - WRF (one core) implemented operationally at AFWA On track Apr ’05 in some domains (T) -WRF-based COAMPS experimental system running Pending TBD daily at FNMOC (O) - WRF-COAMPS implemented operationally at FNMOC (O) Pending TBD 8

9 Status of Desired Outcomes – Phase 1, Goal 4 “Sustainable repeatable process created that facilitates inter- organizational collaboration to develop and transition new science into the common mesoscale NWP modeling infrastructure, including…” “WRF organization and roles defined(Threshold) WRF annual operating plan developed(Threshold) WRF 5-Year plan developed(Threshold) WRF resource plan defined.”(Objective) Capability Metrics Status Susp.Date - DTC and NCEP-OTC organization and roles proposed (T) Done Dec ’03 - WRF program Management Plan approved by ExOB (T) Done Dec ’03 - WRF Management charters (roles) & appointments On track Aug ’04 approved (T) - WRF FY05 annual operating plan developed & approved (T) On track Aug ’04 - Preliminary WRF 5-Year Plan developed and submitted (T) Pending Mar ’05 - Comprehensive WRF 5-Year Plan developed and submitted (T) Pending Nov ’05 - WRF interagency resource plan defined (O) Pending TBD

10 Status of Desired Outcomes – Phase 1, Goal 5 “Plan for Phases 2 and 3 developed, including… Significant deficiencies identified and prioritized in Phase 1 WRF modeling system, common modeling infrastructure and process (threshold) Strategy, roadmap and resource plans developed for each (threshold) At least one cycle of improvement executed to demonstrate repeatability -for one of three areas (threshold) -for all three areas (objective) Funding strategy identified to entrain university community -strategy developed (threshold) -strategy implemented (objective) Capability Metrics Status Susp.Date - Critical deficiency identified in WRF infrastructure (T) Done Jul ’03 - Strategy, roadmap and resource plan developed for infrastructure Done Sep ’03 documentation, training and code streamlining (T) - Infrastructure training held for WRF signatories (T) Done Jan ’04 - Infrastructure documentation draft complete (T) On track Oct ’04 - Infrastructure documentation finished & released (T) On track Dec ’04 - Infrastructure streamlining strategy developed (T) Underway Oct ’04 - Infrastructure streamlining completed (T) Pending TBD - Infrastructure “understudy” position fully functional (T) Delayed May ’05 - Funding strategy developed to entrain universities (T) Done Jul ’04 10

11 Phase 2: Critical Deficiency Identified “The WRF Software Infrastructure is complex, difficult for new users to understand, lacks in-depth documentation, and is fully known to only one person (single point of failure) ” ExOB Mtg., 1 Dec 2003

12 Goals for Alleviating Infrastructure Deficiency 1 Dec Modify existing WRF Software Infrastructure to enhance its functionality, usability and extensibility in sync with an ESMF end state 2. Provide second full-depth expert for WRF infrastructure support to alleviate “single point of failure” 3. Publish developer-level documentation that enables experienced programmers to implement & extend WRF codes for research and operations. 4. Upgrade user support services through WRF infrastructure problem-logging and “help-desk” 5. Establish infrastructure training for new and advanced users

13 “WRF Software Infrastructure is modified to provide different levels of complexity necessary to satisfy different functions, such that… Current infrastructure is optimized for run-time efficiency (Threshold) for two cores, maintaining flexibility for research users Infrastructure is streamlined/rewritten to enhance usability (Threshold) for advanced users, with efficiency & threshold functionality Infrastructure is extended to establish compatibility with (Objective) ESMF standards and linkage to global capability” Status of Desired Outcomes for Phase 2: Alleviating Infrastructure Deficiency – Goal 1 Capability Metrics Status Susp.Date - Two WRF cores in current infrastructure optimized for run time On track Dec. ’04 efficiency (T) - Plan developed to rewrite a streamlined WRF infrastructure In discussion Sep ’04 that maintains efficiency & threshold functionality (T) - Efficient, more understandable, streamlined infrastructure Pending TBD completed (T) - Plan developed to extend WRF infrastructure to establish Pending TBD compatibility with ESMF standards and linkage to global capability (O) - WRF infrastructure extended to be ESMF compliant and Pending TBD supporting global capability (O) 13

14 “Second full-depth expert provided for WRF infrastructure support to alleviate single point of failure by… Hiring infrastructure understudy at DTC (Threshold) Having infrastructure understudy fully trained and able to provide range of user support (Threshold) Having infrastructure understudy train others at OPCs (Objective) and partner research labs to establish local full-depth infrastructure expertise” Status of Desired Outcomes for Phase 2: Alleviating Infrastructure Deficiency – Goal 2 Capability Metrics Status Susp.Date - Infrastructure understudy hired and on site at DTC (T) Offer made Jul. ’04 (original target: Feb ’04) - Infrastructure understudy fully trained and able to provide Pending May ’05 range of user support (T) (original target: Dec. ’04) - Full-depth infrastructure expertise established at two OPCs and Pending TBD two partner research labs (O) - Full-depth infrastructure expertise established at three OPCs and Pending TBD all signatory research labs (O)

15 “Developer-level documentation published that enables experienced programmers to implement & extend WRF codes for research and operations, by… Completing draft version of WRF Infrastructure (Threshold) developer-level documentation Completing final version of WRF infrastructure (Objective) developer-level documentation reviewed and published” Status of Desired Outcomes for Phase 2: Alleviating Infrastructure Deficiency – Goal 3 Capability Metrics Status Susp.Date - Draft version of WRF infrastructure developer-level On track Sep. ’04 documentation completed (T) (original target: Jul’04) - Final version of WRF infrastructure developer-level On track Dec. ’04 documentation completed, reviewed and published (original target: Oct ’04)

16 “WRF problem-logging and “help-desk” support services upgraded for users, by… Establishing routine call-in support for users of the (Threshold) WRF infrastructure via “understudy” Establishing enhanced on-line web site for logging user (Objective) problems & coordinating assistance on infrastructure issues” Status of Desired Outcomes for Phase 2: Alleviating Infrastructure Deficiency – Goal 4 Capability Metrics Status Susp.Date - Routine call-in support established for users of the Pending May ’05 WRF infrastructure (T) - On-line web site enhanced for logging user problems and Pending TBD coordinating assistance on infrastructure issues (O)

17 “Infrastructure training established for new and advanced WRF users, by… Completing a special WRF infrastructure training workshop (Threshold) for at least one group of users Establishing routinely scheduled tutorial classes for (Objective) training in the WRF infrastructure” Status of Desired Outcomes for Phase 2: Alleviating Infrastructure Deficiency – Goal 5 Capability Metrics Status Susp.Date - Special training workshop on the WRF infrastructure Done Jan ’04 completed for one group of users (T) - Routinely scheduled tutorial classes established for training Pending TBD in the WRF infrastructure (O)

18 Phase 2 Goals Use the WRF process and infrastructure to infuse and sustain the flow of new science and technology into the WRF mesoscale NWP modeling system to improve operations and to open new research opportunities: Identify significant deficiencies in Phase 1 WRF modeling system, common modeling infrastructure and process Develop strategy, roadmap and resource plan for each Execute at least one cycle of improvement in all three areas to demonstrate repeatability

19 Immediate WRF Program Tasks: Produce a unified WRF Code Management document by completing/updating existing WRF Coding Conventions (NCAR) and WRF Code Management System (NCEP) documents, including documentation standards (Action: PC, Lead Scientist, Head of Requirements & Transitions Board, DTC director) Develop and implement plan to bring current WRF software into compliance with WRF Code Management document (Action: PC, Lead Scientist, Head of Requirements & Transitions Board, DTC director) Establish user comment and help forum through NCAR and DTC (Action: Lead Scientist, DTC director)

20 The WRF Software Engineering Infrastructure ( NCAR ): Driver Driver Layer Mediation Layer Model Layer Config Inquiry Solve WRF tile-callable Subroutines Config Module Data Formats Parallel I/O Message Passing Threads DM Comm OMP Package Independent I/O API Package Dependent External Packages 1.Objective: Insulate the scientist from parallelism and other architecture-specific details. 2.Three-Level Hierarchy: Driver Layer: Responsible for top-level control of initialization, time-stepping, I/O, domain set-up, nesting, domain decomposition, computer processor topologies and other aspects of parallelism Mediation Layer: “Glue” between driver and model layers; tiling, communication, time step control; makes driver layer transparent to model layer. Model Layer: Subroutines that perform actual model computations; meteorological codes, physics Package Dependents: Open MP, parallel I/O libraries, message passing libraries, node thread packages DM=Distributed Mem. API= Application Program Interface OMP= Open MP

21 Global Database Data Assim. 3DVAR Initialization & Pert. Gen. 1 2 M Dynamic Core 1: Mass Core Dynamic Core 2: NMM Core Dynamic Core 3: [COAMPS Core] Physics Layer Special Applications: Hurricane WRF, Chem-WRF, Rapid Refresh WRF, Climate WRF(?) The WRF Infrastructure LSM Conv.P.B.L. Radiation SI N Micro. Verifica- tion Post Processors Short range ensemble fcst Physics Interface WRF is Easily Extensible to an End-to-End Ensemble Modeling System