OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER WELCOME OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER enquiries@splashstructures.com
STEP ONE POSITION CONTAINERS Prepare ground, slab and/or footings to the ballast requirements outlined in your manual. Position containers to the required distance apart then check that containers are at equal height, level and exact distance as outlined in Manual. Hint: Wait until first arch is installed before locking down containers. enquiries@splashstructures.com
Construct and Attach Canopy Base Rail STEP TWO CANOPY BASE RAIL Construct and Attach Canopy Base Rail Assemble base rail sections, preferably on top of container, starting with the correct corner twist lock base plates, ensuring that rail is flush with edge of the container. enquiries@splashstructures.com
STEP THREE ASSEMBLE ARCHES Assemble arches on ground then raise into position using crane, lifts and/or telehandler. Install purlins and end bracing as you go. enquiries@splashstructures.com
STEP FOUR INSTALL ANY END WALL FRAMES Install End Wall Fabric and Doors Before Raising Canopy enquiries@splashstructures.com
Use Lifts and/or crane where possible STEP FIVE PULL THE CANOPY Use Lifts and/or crane where possible enquiries@splashstructures.com
ENJOY PLEASE ENJOY YOUR SHELTER We’ve put a lot of thought and design into providing you with an easy to assemble, strong, elegant and cost effective portable shelter. Refer to your manual always for exact assembly details. enquiries@splashstructures.com