Avinor update CPWG/16 Ottawa 4-6 December 2013 Bodo ACC Bodo Oceanic FIR.

Slides:



Advertisements
Similar presentations
BULATSA 40 Years of Safety in Bulgarias Skies Sofia, 27 February 2009, CNATCC.
Advertisements

Air Traffic Management
Workshop on preparations for ANConf/12 − ASBU methodology
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Presented to: By: Date: Federal Aviation Administration Air Traffic Management (ATM) Issues 30 Nautical Mile (NM) Lateral / Longitudinal Distance-based.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
OFFSHORE M-ADS Modified Automatic Dependent Surveillance.
Chubaka Producciones Presenta :.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
FAA Strategic Planning Flight Plan Update James Ballough Director, Flight Standards Service November 2004 Flight Standards Service.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
Federal State Unitary Enterprise «STATE AIR TRAFFIC MANAGEMENT CORPORATION OF THE RUSSIAN FEDERATION» Igor Moiseenko, Director General.
PBN “SETTING UP A NEW BUT SUCCESSFUL, PBN PROGRAMME”
Presented to: By: Date: Federal Aviation Administration Air Traffic Management (ATM) Issues Summary of the Outcomes of the 17th Cross Polar Trans East.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
INNOVATION PROJECT PROGRESS
1 Ministry of Education Budget Execution March 28, 2010 As of.
CPDLC / ADS Introduction 4/22/ :49 AM
INNOVATION PROJECT PROGRESS Sept Innovation Management Project Status Project Name: Innovation Management Project Budget : Operational Budget 2010/11.
Mutual Aid Box Alarm System. MABAS Communications Committee  Charged with the task of improving fire service communications interoperability to assist.
CPDLC / ADS Operations 4/22/2017 2:35 PM
Can our ATM systems cope?
Entity Risk Management Program Q & 2008 September 12, 2007 Corporate Accounting & Internal Control Bernard van Oost Gijsbert Visser.
Cost effective ATM – from the perspective of airspace users Torbjørn Lothe, ATM Conference 19 May 2015.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
“Reaching across Arizona to provide comprehensive quality health care for those in need” ICD10  AHCCCS ICD10 Project Milestones Completed Requirements.
APICS Newsletters A “how we do it” as compiled from the Central Ozarks and Southern Minnesota Chapter Newsletters Coordinated by: Julie Stumpe, Central.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Novell to Microsoft Conversion School Year.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Presented to: Emerald Coast Transportation Symposium By: Terry Washington, P.E. Regional Capacity Manager – FAA Southern Region Airports Division Date:
Airspace 1 st LT Zouhar Jakub 12 th September 2014.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
ASSTAR Airborne Separation Operations in Oceanic Airspace Bob McPike, NATS ASAS-TN2 Conference Glasgow, September 2006.
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
CPWG 16 NAV CANADA Update December 3-6,  Private, non-share capital company  2nd largest ANSP in the world  12 million aircraft movements annually.
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
Datalink & Polar Operations ATN 2003 London, September 2003 Presentation to.
September 2003 ATN Middle East Airlines CNS Developments in the Middle East Captain Ousama Balaa, Head of Technical Department Middle East Airlines.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Vertical, lateral separations based on time / distance
Workshop on preparations for ANConf/12 − ASBU methodology
FAA NAVAID Rationalization / Resiliency Overview
Workshop on preparations for ANConf/12 − ASBU methodology
Rome November 2008 Johan Martensson, CASCADE
FANS 1/A over Iridium (FOI)
How do airports plan to solve their future ATM challenges?
San Diego County & Imperial County
RNAV and RNP Strategy in Japan
McDonald’s calendar 2007.
February 2007 Note: Source:.
Soren Dissing - EUROCONTROL
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

Avinor update CPWG/16 Ottawa 4-6 December 2013 Bodo ACC Bodo Oceanic FIR

Avinor Organization changes ANS division of Avinor will in 2014 be established as a separate company owned by Avinor Date will be determined by the Avinor board 27 March 2014 All Avinor ANS employees will be transferred to the new company Re-organizing the Area Control Centers in Norway Decision of one ACC unit in Norway was made in 2012 In September 2013 it was decided to keep the three locations for en- route services, and organize it as one unit. The goal is increased efficiency through standardization, centralized management, support and training to meet the Single European Sky requirements. A plan to achieve the goals is to be presented by the end of the year. After extensive analysis, Avinor management believes this will give the best solution when taking into account economic demands, risk, capacity to execute the change, and to meet external requirements.

Bodo OFIR Stavanger ATCC Oslo ATCC Bodo ATCC Norway ACC

Bodo Oceanic – New ATM system update Improvements compared to current Oceanic system: Data-link (CPDLC and ADS-C) service Oceanic clearance via CPDLC AIDC/ OLDI capability Reduces controller workload significantly and increases sector capacity Status December 2013 Factory acceptance test September 2013 failed. New FAT week Contract agreed with SITA for data-link communication services Instructor training completed in Azores October 2013 Simulator installation planned for January 2014 Controller training starting in February 2014 Operational on AIRAC May 29 th 2014

Bodo Oceanic – Other developments Project for replacing old HF transmitter and receiver stations has started. Three old stations will be replaced by two new installations Target date for implementation is 30 th June Project for adding an extra VHF radio has started. Improved VHF coverage in eastern part of Oceanic airspace along border to Murmansk FIR Expected to be completed summer 2014.

Bodo Oceanic – VHF Communications Established new VHF stations for Oceanic use (127,725 Mhz) Coverage FL300+ Before

Expected summer 2014

Bodo Oceanic – Radar coverage

LYR/ ENSB

Longyear airport – ENSB Possible en-route alternate Published hours of service: H24 Commercial aircraft operations throughout the year primarily with B737s. Published Runway dimensions are 2323 X 45m (7,621 X 148 FT ). ILS RWY 10 / LOC 28 instrument approach procedures Hotels, restaurants and medical center in Longyear Contact information and more details in Norwegian AIP at