Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.

Slides:



Advertisements
Similar presentations
Putting the Pieces Together Grace Agnew Slide User Description Rights Holder Authentication Rights Video Object Permission Administration.
Advertisements

Clearinghouse and OGC Web Services Overview Doug Nebert FGDC Secretariat December 4, 2001.
Products being integrated to create Home Base OpenClass Collaboration Schoolnet Instructional Tools and Assessment PowerSchool Student Information Core.
PDS MC April 2-3, Wash. D. C.1 PDS4 Data Model Working Group Status Report to the PDS Management Council April 2-3, 2008.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
TM 1 Countermeasure and Response Administration Demonstration and Working Group August 26, 2008 Jeanne Tropper, MS, MPH & CRA.
Fedora 3: A Smooth Migration Michael Durbin. The Scenario  New versions of software promise exciting new capabilities and improvements.  They also present.
Operating a Virtual Observatory Raymond J. Walker, Jan Merka, Todd A. King, Thomas Narock, Steven P. Joy, Lee F. Bargatze, Peter Chi and James Weygand.
Tools and Services for the Long Term Preservation and Access of Digital Archives Joseph JaJa, Mike Smorul, and Sangchul Song Institute for Advanced Computer.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Issue: Unknown / Unrecognized Filesystems Initial Analysis Extract Metadata Identify Restricted Info Identify Duplicates Generate Reports.
Cyberinfrastructure Status July, NSF reverse site visit Refactoring and cleanup after review preparations Coordinating Node technology changes.
Web-Based Tool and Why Cross Platform Support Multi-User No special software to install… just a browser Offload real work to server No worrying about versions.
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
Module 12 Installing and Upgrading to SharePoint 2010.
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
Persistent Digital Archives and Library System (PeDALS) SC Department of Archives and History.
Module 7: Fundamentals of Administering Windows Server 2008.
Introduction to Apache OODT Yang Li Mar 9, What is OODT Object Oriented Data Technology Science data management Archiving Systems that span scientific.
PDS 2010 Project Update Dan Crichton MC Face-to-Face Washington DC March 25-26, 2010.
Search Update April 1-3, 2009 Joshua Ganderson Laura Baalman.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
PDS4 Tool Development Strategy PDS Management Council Meeting November 18, 2014 Dan Crichton.
PDS4 and Build 5a Update Dan Crichton, Emily Law November
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
PDS4 Project Report PDS MC F2F Columbia, MD Dan Crichton April 2-3,
Atmospheres Node Report Reta Beebe Nancy Chanover Lyle Huber Lynn Neakrase Jim Murphy Irma Trejo Matias Roybal Shannon Rees.
NSSDCA Status Dave Williams PDS Management Council Berkeley, CA 19 November 2014.
Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications.
PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
AMMOS-PDS Pipeline Service (APPS) NASA-Planetary Data System Management Council Meeting Berkeley, CA November 18, 2014 Costin Radulescu *, Steve Spohn.
PDS Atmospheres Node Plans for PDS4 User Roll-out 8/28/12PDS4 Roll-outStatus 1 Reta Beebe Lyle Huber Lynn Neakrase Jim Murphy Nancy Chanover Joni Johnson.
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
Microsoft Project Reporting with Reporting Services.
Operations Report PDS Management Council Meeting Flagstaff, Arizona August 2006
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
PDS Geosciences Node Page 1 Archiving LCROSS Ground Observation Data in the Planetary Data System Edward Guinness and Susan Slavney PDS Geosciences Node.
Development Report Engineering Node August 2006
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
SBN Experience with PDS4 Workshops for the Community Anne Raugh PDS MC 26 August 2014.
A Technical Overview Bill Branan DuraCloud Technical Lead.
Cassini Archive Tracking System (CATS) Report Engineering Node November 30, 2006
PDS4 Mission Needs Assessment Reta Beebe Dan Crichton.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
PDS4 Demonstration Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
NSSDC Status Dave Williams, Pat McCaslin, Stef McLaughlin PDS Management Council UCLA 27 August 2014.
Tools Report Engineering Node March 2007
PDS4 Deployment Planning (Discussion) PDS MC F2F Columbia, Maryland Dan Crichton August 28,
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
International Planetary Data Alliance Registry Development and Coordination Project Report 7 th IPDA Steering Committee Meeting July 13, 2012.
IPDA PDS4 Report July 17, PDS4: The Next Generation PDS PDS4 is a PDS-wide project to upgrade from PDS version 3 to version 4 to address many.
International Planetary Data Alliance Registry Project Update September 16, 2011.
PDS 2010 System Design Report MC Face-to-Face Washington, DC March 25-26, 2010.
Tools Report Engineering Node August 2007
PDS4 Update Dan Crichton August 2014.
IPDA PDS4 Report PDS Team July 2015.
Costin Radulescu Steve Spohn 26 August, 2014
PDAP Query Language International Planetary Data Alliance
STATE OF NEW MEXICO STATE PERSONNEL OFFICE (SPO)
4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy
Presentation transcript:

Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman

Topics Overview Deployment Status Product-Level Search Reporting Build 5a Next Steps August 26-27, 2014Software Development and Deployment2

Overview Build 4b – Deployed to EN operations in April – A point build was completed in June Added support for capturing unit designations from the product labels. – Node deployments underway since last MC F2F. Build 5a – Delivery to Integration and Test scheduled for September 30, August 26-27, 2014Software Development and Deployment3

Build 4b Components Tools Ingest – Harvest Tool – Catalog Tool Preparation – Generate Tool – PDS4 Tools – Transform Tool – Validate Tool Services Registry – Registry Core/Client – Registry Service – Registry User Interface Search – Search Core – Search Service – Search User Interface Transport Service Report Service August 26-27, 2014Software Development and Deployment4

Build 4b EN Deployment August 26-27, 2014Software Development and Deployment5

Node Deployment Status NodeStatusComment AtmospheresBuild 4b InstalledActively working with Node to exercise PDS4 search scenarios. GeosciencesBuild 4a InstalledPlan to work with the Node to upgrade the installation. Imaging - JPLBuild 4b InstalledActively working with Node to exercise PDS3 registration scenarios. Imaging - USGSBuild 4b Installed NAIFBuild 3a InstalledStarted working with the Node to upgrade the installation. PPIBuild 4b Installed RingsBuild 4b InstalledWill continue to work with the Node to resolve installation issues. Small Bodies - UMDBuild 4b InstalledActively working with Node to exercise PDS4 search scenarios. Small Bodies - PSIBuild 4b InstalledInstalled in test environment. Plan to purchase new hardware for operations. August 26-27, 2014Software Development and Deployment6

Nominal Node Deployment August 26-27, 2014Software Development and Deployment7

Product-Level Search Working with Atmospheres and Small Bodies on exercising PDS4 software for product-level search. For Atmospheres, focusing on Product_Update and support for indexes. For Small Bodies, focusing on support for Primary_Result_Summary and facet-based search. August 26-27, 2014Software Development and Deployment8

Reporting Sawmill software installed at the EN. – Finally has a permanent home server. Utilizing the service for web metric reports. – Generating EN and Imaging reports since the last MC F2F. Have started testing the pulling of Node web logs for service population. – Targeting Build 5a with multi-protocol support. Delivery of Build 5a should finally trigger our active use of the service. August 26-27, 2014Software Development and Deployment9

Build 5a Support data model changes. – Product_Update, Query Models, etc. Additional features for validation. – Focused on bundle and collection integrity. Better integrate search results with available tools and services. Get Tracking Service development underway. – This is where archive status and certification status will reside for PDS4 bundles/collections. August 26-27, 2014Software Development and Deployment10

Next Steps Continue to work with the Nodes on Report Service population. Continue to work with the Nodes to deploy the PDS4 software locally and integrate it into their environments. – This includes population of the registries. Build 5b Development – Focus on product-level support including content validation, search, transformation and visualization. August 26-27, 2014Software Development and Deployment11

Questions/Comments August 26-27, 2014Software Development and Deployment12