WP7 - Small scale mockup Status 3rd Review Meeting Cartif-Brussels 17/12/2014 Gorenje d.d., Sašo Vinkovič, Mihael Bračko.

Slides:



Advertisements
Similar presentations
User Experience Krista Van Laan. Agenda What is User Experience? How does a User Experience team support the rest of the organization? What processes.
Advertisements

COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION London, 5 – 7 September.
Faith Warren My Portfolio and Techniques. Progress Energy We designed and developed a cross-platform experience for Progress Energy that included a new.
COM vs. CORBA.
SPE WITSML: Technology to Business (T2B) for the Oilfield J
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
Computer Monitoring System for EE Faculty By Yaroslav Ross And Denis Zakrevsky Supervisor: Viktor Kulikov.
1 Software Requirement Analysis Deployment Package for the Basic Profile Version 0.1, January 11th 2008.
Programming System development life cycle Life cycle of a program
RFID Shelving ADD Presentation: 19 Mar 2007 Guy Shtub Idit Gershoni.
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne. – Times: –See noticeboard outside.
SONG – Stellar Observations Network Group - The robotic software for the SONG network S.Frandsen 1, Eric Weiss 1, J. Skottfelt 2, M.F. Andersen 1, F.Grundahl.
Project Management Solutions Using SharePoint April 14, 2010.
KaZaA: Behind the Scenes Shreeram Sahasrabudhe Lehigh University
Company LOGO Bid Tracking System Smith & Schaefer, Inc.
Web Development Process Description
The Design Discipline.
RUP Requirements RUP Artifacts and Deliverables
Instructional Design Eyad Hakami. Instructional Design Instructional design is a systematic process by which educational materials are created, developed,
Semester 1, 2003 Week 7 CSE9020 / 1 Software Testing and Quality Assurance With thanks to Shonali Krishnaswamy and Sylvia Tucker.
Air conditioning: new IR emitter item WDS DIVISION Main advantage Permit to control air conditioning IR splitter from My Home touch screens Bus.
WP.5 - DDI-SDMX Integration E.S.S. cross-cutting project on Information Models and Standards Marco Pellegrino, Denis Grofils Eurostat METIS Work Session6-8.
Lesley Bross, August 29, 2010 ArcGIS 10 add-in glossary.
What is SMEcollaborate Primarily developed for Small and Medium Companies who wish to collaborate together. It is a:- A resource center for collaborating.
Michael Dermody September 2010  Capability Maturity Model Integration ◦ Is a Trademark owned by the Software Engineering Institute (SEI) of Carnegie.
Higher Computing Software Development. Software Development Process There are 7 main stages involved in developing a new software program: Analysis Design.
Epiphany Partners Corporation HealthTechNet ClerePath TM Solution July 21, 2006.
Requirements Engineering Requirements Elicitation Process Lecture-8.
 Protocols used by network systems are not effective to distributed system  Special requirements are needed here.  They are in cases of: Transparency.
1° Review meeting Recognition of the SandS project Bruno Apolloni Brussels, 31/3/2014.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
EKo ZigBee IHD Logistics. Kristi gives you 5 New eKo IHD orders 1.11 Albert St, Upper Ferntree Gully VIC Hillside Rd, Rosanna VIC Highwood.
Moving into Implementation SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED.Roberta M. Roth.
Management Board Meeting April 24-25, 2013 Hvar, Croatia SOLUTION is a project of the CONCERTO initiative co-funded by the European Commission under the.
ENERGY STAR for Residential Light Fixtures Durability Implementation June 23, 2003.
IPower: An Energy Conservation System for Intelligent Buildings International Journal of Sensor Networks Yu-Chee Tseng, You-Chiun Wang, and Lun- Wu Yeh.
The Systems Development Life Cycle
WP04: Wireless Networking Libelium David Remón & Anartz Nuin Brussels, March 31, 2014 Midterm Review1 31/03/2014.
OpenWebNet Training India, March 2009 Eng. Lorenzo Pini.
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Using the Right Method to Collect Information IW233 Amanda Murphy.
WP18: High-Speed Data Recording Krzysztof Wrona, European XFEL 07 October 2011 CRISP.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
Online Shopping e-Business ITCS451/951 Group Assignment Online Shopping e-Business Team Members: 1. Elmabourk Benlamma Dhany Setia Purnama
OBJECT-ORIENTED SOFTWARE DEVELOPMENT PROCESS BTS430 Systems Analysis and Design using UML.
IAD 2263: System Analysis and Design Chapter 3: Investigating System Requirements.
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Here we are 3rd review meeting Cartif-Brussels 17/12/2014.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Telnet  TErminaL NETwork  TELNET is a general-purpose client-server application program  TELNET enables the establishment of a connection to a remote.
1 SYS366 Week 1 - Lecture 1 Introduction to Systems.
1 CS 8803 AIAD (Spring 2008) Project Group#22 Ajay Choudhari, Avik Sinharoy, Min Zhang, Mohit Jain Smart Seek.
Eurostat Sharing data validation services Item 5.1 of the agenda.
Final Presentation Smart-Home Smart-Switch using Arduino
Ondřej Přibyl L3: System Development Life Cycle page 1 Lecture 3: System Development Life Cycle Doc.Ing. Ondřej Přibyl, Ph.D. Department of applied mathematics.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
Presented by : Piero Milani ( InfoCamere - Italy)Piero Milani InfoCamere - Italy VCD Signature & VCD Verification strategy as seen by InfoCamere ( WP1.
Advanced Higher Computing Science
Architecture Concept Documents
System Design Ashima Wadhwa.
Project Planning GCP 2008.
Object oriented system development life cycle
Home Automation System
Data validation in Statistical Office of the Republic of Serbia
X-DIS/XBRL Phase 2 Kick-Off
Identifying the Work to Be Done
Presentation transcript:

WP7 - Small scale mockup Status 3rd Review Meeting Cartif-Brussels 17/12/2014 Gorenje d.d., Sašo Vinkovič, Mihael Bračko

Submitted deliverables  D7.1 - Report on mockup installation [M15] ◦ Report on mockup installation: A document containing the list of all working components and their assembling peculiarities, includes a list of part that needed to be re-considered accompanied with the motivations and changes done.  D7.2 - Report on options validation [M20] ◦ Report on options validation: An analysis of the options considered in T7.2 on the light od the carried out experiments.  D7.3 - Report on validated communication protocols and interfaces boards [M23] ◦ Report on validated communication protocols and interfaces boards: Document containing the validation methodology and the corresponding results.

Forthcoming deliverables  D7.4 - Library of recipes and templates of basic scenarios ◦ Library of recipes and templates of basic scenarios: A software library containing a list of developed recipes for different scenarios  D7.5 - Report on collected data with corresponding analysis ◦ Report on collected data with corresponding analysis: A detailed document containing all the collected data accompanied by all the analysis e performances accomplished  D7.6 – Report on all the stress tests ◦ Report on all the stress tests: A detailed document on all the stress-tests done accompanied by a complete description on where/when the system maintained its usability and where/when not

WP7 Timeline & Deadlines Project year YEAR 1YEAR 2YEAR 3 Project month Year Month WP7 T7.1 T7.2 T7.3 T7.4 T7.5 D7.1 R D7.2 R D7.3 R D7.4 R D7.5 R D7.6 R MS 6 R MS 8 R Today

Testing the non branded solution  Before the appliances were sent to Cartif, both, the branded solution and the non branded solution were extensively tested in our laboratories.  The correctness of communication was extensively tested over the mockup‘s web page. A sequence of requests was sent to the web site, each time the response was observed if comply with our expectations.  After initial problems, a high level of correct responses was achieved.

Testing the branded solution  The correctness and speed of communication tests for the branded solution (refrigerator) were performed, using a branded solution home server and it‘s implemented web methods.  A series of tests for different commands were performed, each time with some hundreds of repeats.  Results are comparable with the results, that were obtained in our laboratories.  The response time is a little bit longer.

Real world scenarios and recipes  A set of real world scenarios is being built.  One of them will base on the „two days in real life“ experiment, which is described in D7.3. and will take place shortly  Working on a collection of basic recipes, derived from a set of real world sample scenarios.  Basic recipes represents an entry set for the Social&Smart facility, where basic recipes will be refined and optimized.  Afterwards a library of optimized recipes will be established as a basis for further investigation.

Sample: savings with refrigerator (1)  Scenario: during the low energy price period (from 10pm to 6am), a lower temperature should be set for the freezing compartment, to store the energy. During the higher energy price period the temperature should raise.  recipe: ◦ 10pm start the SuperFreeze mode (around -35°C) ◦ 6am stop the SuperFreeze mode (and operate between -24°C and -16°C)  web service calls (.NET methods): ◦ HRCommand("set", "G87C952FDX", "SUPERFREEZE_PROFILE", "ON"); ◦ HRCommand("set", "G87C952FDX", "SUPERFREEZE_PROFILE", "OFF");

Sample: savings with refrigerator (2)  Derived XML structure: (according to the D7.3) Refrigerator Gorenje G87C952FDX super_freeze RW 22:00 ON wait RW 480 super_freeze RW OFF

Thank you!