DRAUGHON COMMUNITY ROOM Welcome to the. 1972 1991-1992.

Slides:



Advertisements
Similar presentations
Doors and Windows.
Advertisements

One Point Perspective Interior
NGfL CYMRU GCaD FLOOR COVERINGS.
Furniture Alternatives Presentation to The King County Board of Trustees April 30, 2014 Furniture Study Group.
Threads and Fasteners Thread Symbols.
Ground-Supported Slabs • Exterior Flatwork
WICAP Head Start In-Kind
Housing in the past Town House in Rastatt Rastatt is a town of about inhabitants in the south of Baden- Württemberg/Germany. The river Rhine.
IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain,
Boren School Preparing an existing wall to receive structural improvements.
Grimsby Secondary School
LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY.
Redecorating Committee Report. Qualities of Church Abundance Unity Classic design Comfort Sharing Light Growth Beauty Joy What qualities do we want to.
PowerPoint Presentation
Common Architecture Terms. Fenestration The design and placement of windows in a building.
Town House in Rastatt The house is situated in Rastatt,a town of about inhabitants in the south of Baden-Württemberg/Germany. Rastatt lies.
Selecting Furnishings: Off-the shelf v. custom furniture George H. Pike Director, Barco Law Library and Assistant Professor of Law University of Pittsburgh.
© T Madas. Mathematical and Technical Drawings Bottom Side (Left) Back Front Top Side (Right)
Blue Prints.
If all of these rectangles were placed together to make one shape, what would be the area of the new shape?
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Maintaining Structural Integrity. Structural Integrity Before we can understand how to maintain structural integrity, we need to understand how homes.
Painting Architectural Portraits In Watercolor. You could paint a castle.
Introduction The 2012 senior engineering students were given the task of creating a wall to assist Coppell High School’s special education students. The.
Town Meeting Presentation October 29, 2012 Randall Library Building Committee.
Paul Revere’s House A lot of interesting information.
Planning Living Areas.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Sainte-Chapelle Elizabeth Anderson. History… Sainte-Chapelle was built by King Louis IX in 1246 to hold the crown of thorns worn by Jesus Christ during.
The Non-profit Center Enid, Oklahoma Redeveloping an Empty Department Store (Circa 1949) to Create a Place Where Nonprofits Can Grow.
Chapter 36 Sectioning Basics. Introduction Sections –Drawn to show vertical relationships of structural materials Show methods of construction for framing.
Section C Nonstructural Protective Measures
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Space Planning Chapter 7 and 16.
Affordable housing project
LLANCAIACH FAWR – INFO. Dare you enter the haunted house?  At Llancaiach Fawr lots of history is revealed!  Go for a ghostly tour! (spooky!)  Visit.
Lead-Based Paint Hazard Control Madison County Community Development Alan Dunstan, Madison County Board Chairman Frank Miles, Administrator.
Emmaus House of Saginaw 733 S. 14 th Street, Saginaw, MI The name “Emmaus” is from the Bible, Luke 24: In the Bible, it designates the.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
7 Planning the Living Area Chapter. Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the three.
Read the directions and put the items where they belong.
Purpose To provide the best learning and working environments for children and teachers Vision 2016 Leading the Way in Quality Early Childhood Education.
 School children have had no access to the outside world, as there is no regular mail delivery, phone service, TV or Internet connection in the village.
Rondo Avenue Inc University Ave W, Suite 140 St Paul, MN CIB - Community Task Force Presentation March 30, 2015 Prepared by: 275 East 4th Street,
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
Chapter 24 Chimneys and Fireplaces Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Explain how masonry chimneys.
Carnegie Public Library Renovation Project 2008 More than thirty years have passed since the library interior was last remodeled. Public demand for library.
Campus Art Collection: Open to All Carol MacDonald Saskatchewan Library Association Conference May 11, 2014.
APPLICATIONS OF TECHNOLOGY
Jeii.com designs Donor | Award | Engraved | Tree plaques and Signs.
Palisades Middle School: Fitness Center Board Presentation April 20, 2016.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
ROTARY PARK ON THE GREENBELT A collaborative effort Boise Metro Rotary Eagle/Garden City Rotary Centennial Rotary.
Group 8 Façade failure of the John Hancock Building.
Elevations.
FURNITURE & PREPOSITIONS OF PLACE
A Brief History of Sayville Congregational Church
FLORIDA’S CAPITOL BUILDINGS
Welcome Home A Tour of 1734 N Street
1440 Chain Bridge Road The Old Firehouse Teen Center was created between the years of 1916 and The date is not exact due to the absence of written.
Basement Finishing - Creative Ideas & Cost
Welcome Thank you for joining us for our
Minuteman Vocational Technical Regional High School Progress
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Hudson’s Portfolio.
Stoughton Public Library
Proposed New Layout for Lobby Eagle Hospitality Interiors
Presentation transcript:

DRAUGHON COMMUNITY ROOM Welcome to the

1972

Federal laws guaranteeing accessibility to persons with handicaps prevented us from using the lower level of the library until accessibility to all patrons could be guaranteed. The lower level became used for storage only.

Yearly growth in our children’s programming, both in numbers of programs held and number of children served, led to a need for additional programming space at the library.

Under the leadership of the library’s Board of Trustees, plans were drawn and a fundraising drive announced to raise necessary funds to renovate the lower level of the library to create additional programming and meeting space.

Fundraising efforts kicked off in March 2013 with donations from Gerald Settles (left), in memory of former library board member Nancy Settles; and from former library board member Bob Depro (below)

Other early donors to our fundraising included (clockwise from top right) the Boyce family, Chapter JU-PEO, the King’s Highway chapter of the Daughters of the American Revolution, and Altrusa.

A donation in the amount of $435,000 in late 2013 met our fundraising goal and allowed contracts for construction to be awarded. The donation from the estate of Ann Draughon Matthews was given in memory of her parents, Harris N. and Anna C. Draughon.

A major ongoing fundraiser for the renovation was the Children’s Tile Project. For a small donation, a child could paint a tile to be displayed in the basement. Over two years’ time, a total of 240 tiles for children and adults were decorated.

The first indication that construction was underway was a new wall on the main level to conceal the hole cut in the floor to prepare for an elevator shaft. Actual metal framing of the elevator shaft took place behind the wall and in the lower level.

Brick was removed from the back wall of the library to install the elevator. Once completed, the elevator opens to the main level of the library near the circulation desk, in the young adult section.

The lower level of the library was built in two stages and at two different elevations. A curved ramp with wrought iron accents connects the two levels and allows for accessibility to the platform.

A major goal of the renovation was to respect the history of the original space. The windows, which once provided an outdoor view, were retained and improved, with backlighting to allow for displays.

The platform in the lower level maintains its original shape and size, but has new wood flooring to repair years of damage and wear. The fireplace, while non- working, is still a focal point of the lower level with a fresh coat of paint and newly- built wood mantle.

A major portion of the funding was a donation from the estate of Ann D. Matthews, given in memory of her parents, after whom the room has been named. Additional funds were received from the estate of Paul and Regina Meyer. Funding for furnishings, including 28 tables, 80 chairs, and a lectern, were donated by Gerald Settles in memory of former library board member Nancy Settles.

All individuals, organizations and businesses who donated $100 or more have been recognized on the donor tree, which is located at the base of the stairway on the east side of the lower level. Approximately 160 donors are named on the tree, which was designed by local artist Sheila Bohannon.

With the opening of the Draughon Room, the library gains a 1,000-square foot programming space suitable for school visits, Family Nights, summer reading program, and a variety of library and community programs.