Network infrastructure for CERN DataCenter HEPiX Fall 2015.

Slides:



Advertisements
Similar presentations
Excellence in Connectivity Solutions Author | Name of the presentation | Date |1 MPO-Solutions for LISA.
Advertisements

Innovative and Unique Solution for EOE – RAISECOM
RiT PatchView Solution
Antonio González Torres
Install L2 Switch Head End CATV
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
1 © 2001, Cisco Systems, Inc. All rights reserved. NIX Press Conference Catalyst 6500 Innovation Through Evolution 10GbE Tomáš Kupka,
Given Connections Solution
Presented By The Fiber Optic Association ©2004, The Fiber Optic Association, Inc. Understanding Fiber Optic Communications Communications over hair-thin.
1 1. Power over Ethernet (PoE) Switches 2.Connection to IP Cameras  IP Cameras over fibre  IP Cameras over legacy Co-ax  PoE Injector 3.Connection to.
Virtualization driving the need for Affordable 10 GbE © 2009 Extreme Networks, Inc. All rights reserved Jan Hof Director Field-Marketing EMEA-SAM
1 Nexans Cabling Solutions Fibre solutions for fast deployment Joost Grillaert.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Confidential information. All rights reserved.© Wave2Wave Solutions 1 © Wave2Wave Solution Corporation Connectivity Solutions.
10/100/1000Base-T to Dual 1000Base-X SFP Media Converter GT-1205A Icon5Icon4Icon3Icon2Icon1.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Rack Mounted Network Equipment Patch Panels Network Switch Router Rack Servers HDD Arrays UPS System Provides circuit protection and an uninterruptable.
Cabling Systems NEWLINK ARE YOU READY FOR THE… TECHNOLOGY RACE?
1 Nexans Cabling Solutions Easy and reliable migration from fast to faster to100G.
©2007 D-Link India Ltd. All rights reserved. Business Solution Solution is for network extension through out the campus of IISER. End user.
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
InfiniSwitch Company Confidential. 2 InfiniSwitch Agenda InfiniBand Overview Company Overview Product Strategy Q&A.
Gigabit Ethernet.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Detector Cabling and Patching Rainer Schwemmer
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Fiber connections of QIE cards in UX5 Ulrich Heintz 4/23/20151.
111 © 2006 Cisco Systems, Inc. All rights reserved.CISCO 1 PCI Certification Panduit Certified Installer Bob and Lee.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
1 Using VPLS for VM mobility cern.ch cern.ch HEPIX Fall 2015.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
Where we are... Public Interconnects: Number of peers on switch ~60 Aggregate bandwidth through switching fabric ~530mb/s average - ~680mb/s peak.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
CRICOS No J a university for the world real R Nov 2009 Andy Joyce Infrastructure Services Information Technology Services The Provision, Support.
Status of the NA62 network R. Fantechi 23/5/2012.
Activity # 1 Problem Solving/ Engineering Design Process IET 120-Technology Systems Team Harris & Jent.
Update on Optical Fibre issues Rainer Schwemmer. Key figures Minimum required bandwidth: 32 Tbit/s –# of 100 Gigabit/s links > 320, # of 40 Gigabit/s.
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
September 30, 2008 Jim Van Dyke, Web:
1 Rick Dallmann Session: DB 1.1 Designing Next-Generation SAN/Storage Optical Infrastructure Why Low Link (Budget) Loss is Critical.
Solutions – 1 – opticonx.com FOR DATA CENTERS AND STORAGE AREA NETWORKS Solutions Xtreme8™ is Opticonx’s Base-8 cabling solution for easy migration.
RF over Fiber - Application Riedel solutions for broadcast applications 1 Application Examples – RF over Fiber.
Ethernet Line Extensions Gigabit PoE Unmanaged Switches M12 Unmanaged Switches.
1 DB 1.3 Case Study: eBay’s 40G/100G Network Upgrade Shawn Tugwell, Sr. Data Center Design Engineer – eBay Gary Bernstein, RCDD, CDCD Sr. Director of Product.
Huawei xDSL solution(ADSL2+ and VDSL2 solution) - Huanetowrk.com
Network Cabling Next-Gen Cabling. Copper Ethernet Standards 10/100 Mbit/s – Fast Ethernet 10Base-T 2 Twisted Pairs on Cat 3/5 Cable 100Base-TX 2 Twisted.
August 22, 2001 Traffic and Cost Model for RPR versus 1GbE and 10GbE Architectures A Carriers’ Carrier Perspective Stevan Plote Director of Technology.
KBC Networks 2010 Fibre optic Wireless Broadcast Network Transmission Welcome.
Enterprises systems : Enterprise Wireless Network Solution Provider
Belden Electronic Components in Dubai
Site report of Wigner Datacenter
Optimizing the Data Centre Physical Layer in the Era of the Cloud
Data Center Network Topologies
Media Conversion Solution
Prove the Capacity of your Fibre Infrastructure
Rack Design Proposal as of 01/03/2013
OpenLab Enterasys Meeting
General aspects: Optical links :
Broadband Wireless Infrastructure
S12700 CSS Card Clustering 1 Components and Tools 2 Installing Cards
Fiber Installation for RUN 3&4
May 7 About the Datacenter (hardware show and tell)
Security Advantages of Centralized Fiber Networks
AKSUM UNIVERSITY ICT Directorate Oct 10, 2018 Axum, Tigray, Ethiopia

Prepared for CSC by Fred Borcherding FNAL
Presentation transcript:

Network infrastructure for CERN DataCenter HEPiX Fall 2015

Agenda Needs Situation Options Implementation Questions HEPiX Fall

Needs Support 40GbE, 100GbE and more Still available for 10GbE Also for low bandwidth (PDU, Management) High availability and reliability HEPiX Fall

Needs Supporting 40G, 100G and more imply At least OM3 optical infrastructure At least MPO connectors HEPiX Fall

Needs 10GbE compatible imply : LC connectors Convert MPO to LC Copper (Cat6A …) HEPiX Fall

Needs Low bandwidth for management and PDU Copper is enough HEPiX Fall

Needs High availability and reliability Respect of installation methods HEPiX Fall

Needs HEPiX Fall High availability and reliability Respect of installation methods Cabling organization

Needs HEPiX Fall High availability and reliability Respect of installation methods Cabling organization Operation methods “Inspect before you connect !”

Situation Old infrastructure Copper from 1995 OM2 Racks Extension of the DC locally but also in Wigner site HEPiX Fall

Options Copper Which use ? Management and PDU May come the need for 10G uplink HEPiX Fall

Options Optical fiber quality OM3 allow 100GbE over 100m OM4 allow 100GbE over 150m HEPiX Fall

Options Connector MPO, LC, … ? MPO-12 or MPO-24 ? What about MTP ? HEPiX Fall

Options Optical cabling type A, B, C, …? key up, key down ? HEPiX Fall

Options Type A HEPiX Fall

Options Type B HEPiX Fall

Options Type C HEPiX Fall

Options Module type 1 MPO to 12 LC ? 2 MPO to 24 LC ? How many fiber per trunk and per chassis ? HEPiX Fall

Options Cable type A same MPO to LC module but different patches HEPiX Fall

Options Cable type B same patches but different MPO to LC module HEPiX Fall

Options No type C if you want more than 10GbE ! HEPiX Fall

Options Same patches and same MPO to LC module Patented solution HEPiX Fall Manufacturer dependent solution

Implementation Aggregation and ToR switches for Management ToR Data switches HEPiX Fall

Implementation HEPiX Fall Infrastructure every 3 or 5 racks New copper in new rooms Old copper cabling reused for management and PDU

Implementation OM4 72 fibers with MTP-12 Type B HEPiX Fall

HEPiX Fall