PCWA MFP Operations Model All Models are Wrong But Some Models are Useful.

Slides:



Advertisements
Similar presentations
Active Water Resource Management in the Lower Rio Grande TOOLS FOR A NEW ERA IN WATER MANAGEMENT presented by Peggy Barroll, Hydrologist New Mexico Office.
Advertisements

Reinaldo Garcia, PhD A proposal for testing two-dimensional models to use in the National Flood Insurance Program.
May Middle Fork Project Project Operations Overview May 2006 PCWA MAY 16, 2006 HANDOUT #4.
Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
SUSTAINABLE OPERATION OF THE YAQUI RESERVOIR SYSTEM.
Defining the Status Quo. Definition of Status Quo The “Status Quo” describes existing or anticipated conditions of a water resources system if policies,
CVEN 5838 Aug 28, 2008 Lecture 2 Reservoir Capacity Yield Analysis (how to size a reservoir and measure its performance)
CE 3372 Water Systems Design
June 26, PCWA - Middle Fork Project Project Operations
1 Simulation Modeling and Analysis Verification and Validation.
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
WESTCAS - Shortage Impacts on AZ CAP General Manager David Modeer October 29, 2014.
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
Water Supply Forecast using the Ensemble Streamflow Prediction Model Kevin Berghoff, Senior Hydrologist Northwest River Forecast Center Portland, OR.
Reclamation Mid-Term Operational Modeling Seasonal to Year-Two Colorado River Streamflow Prediction Workshop CBRFC March 21-22, 2011 Katrina Grantz, PhD.
Water Resources Planning and Management Daene C. McKinney Simulating System Performance.
Dr. David Ahlfeld Professor of Civil and Environmental Engineering The Westfield River Basin Optimization Model Demonstration:
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Hood River County Monthly Meeting Presentation Toni E Turner, M.S., P.E., Project Manager and Technical Lead.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Lecture 1 Water Distribution Systems
Lecture 5 Hydropower Sept 9, 2008 CVEN 4838/5838.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
CE 3372 Water Systems Design EPA-NET Pumps, Valves, Tanks.
Deksyos Tarekegn National DSS Specialist - Ethiopia
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
January 29, 2013 Lake Diefenbaker Reservoir Operation Proposed Operating Manual Development.
HYDROELECTRIC POWER PLANT. PRELIMINARY INVESTIGATION  The purposes of preliminary investigations are to provide sufficient information to find out the.
Middle Fork Project Project Description April 25, 2006.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
Hydro and Wind Power By Tom Juzeler Phi Kha. HYDRO POWER Hydro Power is basically the power derived from the movement of water. Hydroelectricity comes.
Middle Fork Project Potential Project Betterments October 1, 2007.
James VanShaar Riverside Technology, inc
Modeling Development CRFS—Technical Meeting November 14, 2012.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Water Balance/Operations Modeling Yuba River Development Project FERC Project 2246 Relicensing Wednesday, May 9, 2012.
Dr. Richard Palmer Professor and Head Department of Civil and Environmental Engineering University of Massachusetts Amherst.
Resource allocation and optimisation model RAOM October 2003.
Colorado River Update Terry Fulp Deputy Regional Director
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
What is OASIS? Water resources simulation/optimization model
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
OASIS Basics Computer Aided Negotiations of Water Resources Disputes.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O Don Pedro Reservoir 3-Dimensional Temperature Model.
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 Refining Objectives and Developing Scenarios.
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 The Art of Scenario Evaluation.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
CHALLENGES IN WATER RESOURCES SYSTEMS OPERATION 1 July 2004 B Mwaka Water Resources Planning Systems – User Forum No. 3.
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
Water Resources Planning and Management Daene C. McKinney Multipurpose Water Resource Systems.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
WATER SYSTEM WORKSHOP February 27, 2012
WATER RESOURCES DEPARTMENT
TechStambha PMP Certification Training
Allocation of Ogallala Groundwater Supplies
Hydrologic Simulation Models
Department of Environmental Quality Division of Water Resources
Water Resources Planning for an Uncertain Future Climate
GENESYS Current Functionality
Tami Thompson - MBK Engineers
Presentation transcript:

PCWA MFP Operations Model All Models are Wrong But Some Models are Useful

What is a Model? A Simulation Model is a mathematical representation of a physical system that includes: Rivers Reservoirs Conveyance and Release Facilities Tunnels, Penstocks & Powerhouses, Streamflow release valves Operating Rules, Licenses and Agreements

What is a Model? The Model routes water (Input Hydrology) through the System (mathematical representation of the physical world) according to Rules

What is a Model? A model chooses how water is routed through the system in order to meet certain criteria and goals. A model allows us to measure the impact that changes to the input set will have on the output set.

What are the Rules? Rules are inputs to the Model Rules represent decisions made by the operators Rules fix operating parameters that can vary from run to run

Examples of Rules Instream flow requirements Storage level requirements and targets Use of discretionary water supplies Meet Consumptive Demands Generate Power Provide Recreation

Other Model Inputs Flow (Hydrology) - PCWA believes that it has a reasonably accurate record of Project flows since the project began operation in 1968 For each different set of inputs, we intend to generate output using the same identical set of historic hydrology

Other Model Inputs Fixed Criteria - project parameters that cannot be changed without physical alteration of the Project. Fixed Criteria include: Tunnels and Turbine capacities Outlet capacities Elevations

Other Model Inputs Water Supply Demands - special class of Rules Consumptive demands at Folsom Reservoir Consumptive demands at Auburn Pump Station Environmental Demands (Water Forum Agreement)

Model Outputs Tables to verify that the Rules are met Rules guide the operation of the model, but may not be met 100% of the time. For example, minimum instream releases will not be met if a reservoir runs dry. Having the flexibility to violate rules helps provide information.

Model Outputs Reservoir Level Trace Identify excursions from “preferred” operation - too high (spills and loss of generation) or too low (risk of failure to meet consumptive demand) Power Generation

Benchmark and Baseline A Benchmark Run is used to verify that the model reasonably represents actual historic operations The Baseline Run is the run against which all Alternative Model Runs are compared to determine the impacts of proposed conditions on the MFP operation

Benchmark and Baseline PCWA proposes that the difference between the Benchmark and the Baseline Runs is that the Benchmark Run uses historic consumptive water demands and the Baseline Run uses buildout consumptive water demands

Using the Model Model Consumptive Demands Hydrology Operating Rules Fixed Criteria Verification Tables Reservoir Levels Input Output Baseline Study Generation Model Consumptive Demands Hydrology Operating Rules (Changes) Fixed Criteria Verification Tables Reservoir Levels Input Output Generation Alternative Study Assess Impacts Compare Outside Model Inside Model

Assessing Impacts The Model Does Not assess environmental impacts The model only provides comparative information on water supply and power generation for Alt Model Runs Assessment of the full impacts of any Model Run is done by people

Assessing Impacts An analysis of the benefits and costs of each alternative may be viewed differently by each person To develop alternatives based upon environmental parameters requires completion of the 1st year of field studies. March 2009.

Alternative Model Runs The desire to create a given environmental condition leads stakeholders to suggest changes to the rules The resulting model run shows the impact of the rule change on water supply and power generation

Where are we now? The Model is operational Benchmark input set has been assembled for testing A draft users manual has been prepared

What do we do until 2009? Verification Education Development (betterments, hourly) Investigate physical limitations Find our sideboards: Dry year issues, Ralston Afterbay flexibility

How do we get there? Process: We need good process around our group understanding of how Modeling Alternatives are developed, run and assessed