Greenhouse Gas Permitting Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.

Slides:



Advertisements
Similar presentations
Dana Poppa Vermillion, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2012.
Advertisements

DEP TRANSFORMATION Air Permit Review & Process. 2 ITEMS DISCUSSED Permit Format Streamlining of Compliance Plans Level of Monitoring Level of monitoring.
Common Permit by Rule Authorizations in Texas
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
GHG BACT Analysis Deanna L. Duram, P.E., C.M. August 4, 2011 Air & Waste Management Association Southern Section Meeting trinityconsultants.com.
1 Year in Review: Climate Change Presented by: Tom Wood Stoel Rives LLP October 8, 2010 EPA Heats Things Up.
Update on CAAAC Workgroup, EPA Guidance, and Possible Future EPA GHG Regulations.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2014.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
Air and Waste Management Association-Gulf Coast Chapter Meeting October 7, 2014.
EPA Rulemakings to Set GHG Emission Standards for Power Plants National Hydropower Association Webinar Kyle Danish February 14, 2014.
Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group #2 May 28, 2008 SCAQMD Diamond Bar, California.
Air Protection Branch 1. 2 Air Quality Activities Support the Mission of the Air Protection Branch Monitor and Report Air Quality Data Analysis and Planning.
EPA Regulations On Electric Utility Generating Units (EGU)
Response to Comments on HAR Amendments Clean Air Branch Greenhouse Gas Rules Stakeholders Meeting 10/18/2013.
Standardized Authorizations (Permits by Rule & Standard Permits)
Clean Air Act Section 111(d) Indiana Energy Association September 11, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of Environmental Management.
Air Permitting Overview.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
NACAA Permitting Workshop, Chicago June 14, 2011 Raj Rao, NSR Group Leader OAQPS, EPA GHG Permitting – Regulatory Update.
Oil & Gas Permitting Issues and Guidance Revisions Statewide and Jonah/Pinedale Development Area Mark Smith Wyoming DEQ/AQD.
The world’s leading sustainability consultancy Generic Front Cover What’s this layout for? This is the generic slide front cover, but you can also make.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
Delivering sustainable solutions in a more competitive world GHG Mandatory Reporting Rule – Implications for PSD Review for GHG September 2012 Ramesh Narasimhan.
Russell City Energy Center Voluntary GHG BACT Determination Bay Area Air Quality Management District June 14, 2011 Brian Lusher Senior Air Quality Engineer.
American Public Power Association Washington, DC April 27, 2010 Leslie Sue Ritts, RITTS LAW GROUP, PLLC 1.
PERMITTING ELECTRIC GENERATING UNITS Jim Linville & Erik Hendrickson Air Permits Division.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Greenhouse Gas Permitting August 22, 2011 Richard Angelbeck U.S. EPA Region 5.
Greenhouse Gas (GHG) Permit Training Region 4 – Atlanta, GA Dec , 2010.
Bill Harnett March 30, 2010 WESTAR Spring Meeting.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 MOBILE6 -Input and Modeling Guidance -SIP and Conformity Policy North American Vehicle Emission Control Conference Atlanta, April 4, 2001 Gary Dolce.
GHG BACT Developments Justin Fickas Clay Raasch. Overview ˃ Since January 2011, Greenhouse Gases (GHGs) have been evaluated under Prevention of Significant.
Clean Air Act Section 111(d) Indiana State Bar Association Utility Law Section September 4, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department.
Michigan Air Quality Division Greenhouse Gas BACT Analysis for Wolverine Power Supply Cooperative Inc. Mary Ann Dolehanty Permit Section Chief Air Quality.
© 2012 The Williams Companies, Inc. All rights reserved. GHG Reporting Update Rocky Mountain EHS Peer Group January 17 th, 2013 Laura London, P.E.
1. Carbon dioxide (CO 2 ) – Naturally occurring and man- made. 5,505.2 mmts emitted in 2009, GWP = 1 Methane (CH 4 ) - Naturally occurring and man-made.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Current situation concerning national inventory system in Ukraine 1. Previous national inventories Up to date 3 national inventories were prepared and.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Electric Utility Greenhouse Gas Emissions Reduction Initial Rule Development Workshop August 22, 2007 Department of Environmental Protection Division of.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
REGULATIONS & LEGISLATION BIG TEN ENVIRONMENTAL STEWARDSHIP GROUP STEVE MARUSZEWSKI – PENN STATE Greenhouse Gases.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
Best Available Control Technology/Lowest Achievable Emission Rate Evaluation Sarah Fuchs Air Permits Division Texas Commission on Environmental Quality.
Emissions Banking and Trading (EBT) Overview/Update Melissa Ruano Air Quality Division Texas Commission on Environmental Quality Advanced Air Permitting.
Wingra Engineering, S.C.1 Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective Steven Klafka, PE Wingra Engineering, S.C Electric.
Workshop of St Petersburg - 27 th October 2009 Expert sub-group on Emerging Technologies/Techniques EGTEI - Emerging technologies/ techniques for LCPs.
MassDEP Response to EPA GHG Initiatives SIP Steering Committee January 13, 2011 Marc Wolman.
Update on EPA’s Greenhouse Gas Rulemakings Norman W. Fichthorn Hunton & Williams LLP 2010 American Public Power Association Energy and Air Quality Task.
Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
EBC New Hampshire Chapter EBC New Hampshire Chapter Report from the NH DES Division Directors.
Tribal Permitting Conference 2013 Steve Dunn, P.E., Construction Permit Team Leader; Bureau of Air Management (608) ;
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Clean Power Plan Kyra Moore Director, Air Pollution Control Program Prepared for: Midwest Energy Policy Conference October 6, 2015.
PSD/Nonattainment Applicability Arturo J. Garza Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
March 28, 2013 Office of Research and Development 1 National Risk Management Research Laboratory, Air Pollution Prevention and Control Division. Oak Ridge.
First in Service First in Value
Clean Air Act Glossary.
NSPS Rulemakings for Greenhouse Gas Emissions
Greenhouse Gas Permitting: One Year After the Tailoring Rule
Department of Environmental Quality
GHG Permitting: Regulatory Update
Michigan Air Quality Division
Best Available Control Technology for Greenhouse Gas Emissions Sources
Presentation transcript:

Greenhouse Gas Permitting Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015

General Topics Administrative Expectations Technical Expectations Implementation & Integration Contact Information & Questions

Administrative Expectations Greenhouse Gas Permitting Technical Expectations Implementation & Integration Contact Information & Questions Administrative Expectations The Do’s and Don’ts

Greenhouse Gas Permitting Administrative Expectations The Do’s -  Submit non-GHG and GHG applications at the same time: Separate – two PI-1s; or Consolidated – one PI-1  Resubmit if change method

Greenhouse Gas Permitting Administrative Expectations The Don’ts -  Don’t submit a minor amendment for: A stand-alone GHG permit; or The GHG portion of consolidated permit  No minor revisions of GHG permits  Don’t send fee for GHG permit actions

Greenhouse Gas Permitting Implementation & Integration Contact Information & Questions Technical Expectations How to Make Your Life Easier

Greenhouse Gas Permitting Technical Expectations Consider GHGs as a Pollutant -  One of several permitted pollutants  Same importance as NO x, VOC, etc.  Will be permitted with PSD program

Greenhouse Gas Permitting Technical Expectations Two Ways to Handle GHGs - 1.Separate Application 2.Consolidated Application

Greenhouse Gas Permitting Technical Expectations Separate GHG Application -  Two complete applications required: Don’t cross-reference other application No impacts review or discussion needed  Update both applications in the same or physical mail

Greenhouse Gas Permitting Technical Expectations Consolidated GHG Application -  No change in most of application: Add GHG BACT analysis and calculations Use only one BACT process  No impacts review or discussion needed

Greenhouse Gas Permitting Technical Expectations BACT and GHG -  Concept questions  Example  Example questions

Greenhouse Gas Permitting Technical Expectations BACT and GHG -  Is the process different for GHG? For example, the use of Carbon Capture and Sequestration (CCS)  What is the BACT determination? A numerical emission limitation, or if infeasible..... A work practice

Greenhouse Gas Permitting Technical Expectations BACT Example (Non-GHG) -  Combined cycle (CC) power plant  Fires natural gas  What is BACT for NO X ?

Greenhouse Gas Permitting Technical Expectations BACT Example (Non-GHG) - How should the application address BACT?  Numerical limit – 2 ppm NO X  Based on control device or technique – SCR  No prescribed design or operation of the unit (unless a work practice is BACT)

Greenhouse Gas Permitting Technical Expectations BACT Example - Do not propose design and work practices with a numerical BACT.  SCR with four catalyst beds using a zeolite catalyst  One bed will be replaced every year  Ammonia grid design

Greenhouse Gas Permitting Technical Expectations BACT Example (GHG) -  CC power plant  Fires natural gas  What is BACT for CO 2e ?

Greenhouse Gas Permitting Technical Expectations BACT Example (GHG) -  What controls are technically feasible/ economically reasonable?  Can a meaningful numerical limit be set for the turbine?

Greenhouse Gas Permitting Technical Expectations BACT Example (GHG) -  CCS is not cost effective and may be technically infeasible for full control of the stack  Efficiency requirements are possible and a numerical limit can be set

Greenhouse Gas Permitting Technical Expectations BACT Example (GHG) -  Example of BACT for CC power plant: Turbine ModelGross Heat Rate (Btu/kWh) Output Specific CO 2 Emission Rate (lb CO 2 /MWh) Mitsubishi Heavy Industries (MHI) J 7,  Both fuel usage and electrical generation can be measured

Greenhouse Gas Permitting Technical Expectations BACT Example (GHG) - Other facilities may express efficiency in different forms.  Exhaust stack temperature  Fuel usage per unit of product

Greenhouse Gas Permitting Technical Expectations BACT Example Summary - Numerical limits speak for themselves.

Implementation and Integration Greenhouse Gas Permitting Contact Information & Questions Issuance Updates GHGs Non-GHGs Implementation & Integration Issuance Updates GHGs Non- GHGs

Greenhouse Gas Permitting Implementation & Integration Issuance of Permits – Order Major NSR permitting actions for non-GHG and GHG may be issued out of sync.  Case-by-case basis

Greenhouse Gas Permitting Implementation & Integration Issuance of Permits – Timeframe Start of Construction deadline based on last permit issued.  Void process still exists  Issuance timeframes are important

Greenhouse Gas Permitting Implementation & Integration Updates to Non-GHG Permits - Non-GHG permit must always be accurate.  Amend or alter as needed  No change from past NSR permitting

Greenhouse Gas Permitting Implementation & Integration Updates to GHG Permits - GHG permit cannot use minor NSR mechanisms.  Updates will be allowed  Guidance is being developed  Must be part of a non-GHG action that is approved with or before the update

Greenhouse Gas Permitting Implementation & Integration Updates to EPA-Issued GHG Permits -  EPA will rescind if needed (contact EPA)  Updates/major mods through TCEQ  EPA-issued permits receive TCEQ permit numbers

Greenhouse Gas Permitting Implementation & Integration Current Issues -  When BACT is not a number: Numerical limit vs. work practice Work practices can be subjective  Fugitive monitoring for methane  Consistency with non-GHG permit  Updates and existing BACT

Greenhouse Gas Permitting Implementation & Integration Moving Forward -  Streamlining and standardizing permit conditions  Documenting more Tier 1 BACT determinations  Working with EPA on TCEQ issued draft permits

Contact Information and Questions Greenhouse Gas Permitting Contact Information & Questions

Greenhouse Gas Permitting Contact Information & Questions Contacts - Technical Contact: Sean O’Brien (512) Implementation Contact: Tasha Burns (512)

Greenhouse Gas Permitting Contact Information & Questions Questions?