June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

BILCW07 - Feb 2007 Global Design Effort 1 RDB S3: Damping Rings R&D Junji Urakawa for Andrzej Wolski (Cockcroft Institute), Susanna Guiducci (INFN-LNF),
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Nick Walker KEK-DESY meeting 7 th March 2005.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
DR Kick-Off Meeting CI, 5 Nov 2007 Global Design Effort 1 Damping Rings Update (after the RDR) Andy Wolski.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Global Design Effort 22 March 2007 Tor Raubenheimer1 ILC Machine Overview and Critical R&D ALCPG Meeting Tor Raubenheimer.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
ILC damping ring options and their critical issues 12th July th ACFA MDI/POL/ACC Pohang Accelerator Lab. Eun-San Kim.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC Damping Ring Collective Instability update: Electron Cloud Mauro Pivi SLAC ILC Vancouver Meeting July 19-22, 2006.
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
AEC09, CERN Mauro Pivi, SLAC TiN chambers and SEY measurements in PEP-II M. Pivi J. Ng, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper, C. Spencer, B.
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
7 November 2006 Valencia Global Design Effort 1 Damping Ring Susanna Guiducci INFN-LNF for Jie Gao (IHEP), Andrzej Wolski (Cockcroft Institute) and Mike.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Tor Raubenheimer SLAC ILC Accelerator Efforts SLAC DOE Program Review June 13 th, 2007.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Mark Palmer for the CESRTA Collaboration
Status and Plan of GDE Design Work (Including Road Map for RDR)
Technical Design Report preparation
ILC Global Design Effort
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
Electron Source Configuration
CesrTA Experimental Schedule and Priorities
Electron Clouds at SLAC
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE

June 13, 2007 Global Design Effort 2 RDR – a major effort in 06/07 Original Schedule was complete draft by Nov 06 but cost re-optimiation forced delays Drafts due to editors in late Dec 06 ‘Critical’ sections approved by EC at Beijing in Feb 07 and released Complete draft of all sections was released Apr 1, 07 except Executive Summary & EDR chapter still refining graphics, updating costs, references International Cost Review held May 24/25 in Orsay Final release for FALC 7/11 & ILCSC 8/15 with Executive Summary, Detector Concept Report

June 13, 2007 Global Design Effort 3 RDR Matrix Matrix of Area Systems and Technical Systems to develop design and cost estimate International representation in all working groups SLAC contributions in red RDR Management group: Nick Walker, Tor Raubenheimer, Kaoru Yokoya, Ewan Paterson, Wilhelm Bialowons, Peter Garbincius, Tetsuo Shidara

June 13, 2007 Global Design Effort 4 SLAC role in RDR RDR Chief Editor – NP with co-editors Toge (KEK), Walker (DESY) + major help from Bharadwaj, Tenenbaum SLAC was ~ only contributor to e- Source, RTML, Dumps, Installation SLAC was lead author for those 4 sections + e+ Source, Linac, BDS, OPS, Mod, Klys, rf distr’n SLAC was major contributer to costing for magnets, e+, e- & rf sources, dumps, CFS, install’n SLAC provided Systems Integration & graphics support

June 13, 2007 Global Design Effort 5 RDR Design Changes Central Injector proposed and coordinated by Paterson with SLAC e-, e+ sources, RTML, BDS area leaders January 06 Baseline

June 13, 2007 Global Design Effort 6 Central Injector January 07 RDR Configuration Damping rings now centrally located in common tunnel e- source, e+ 5 GeV linac, DR all located 10 m above BDS for early commissioning during linac installation

June 13, 2007 Global Design Effort 7 Central Injector > DR Current schematics have tunnels vertically offset

June 13, 2007 Global Design Effort 8 Tuneup Dumps (220 kW each) Ring To Main Linac: Schematic RTML was completely redesigned for Central DRs now the longest system in the entire ILC

June 13, 2007 Global Design Effort 9 In linac tunnel, follows curvature from gravitational equipotential 38 m quad spacing, 45° FODO cell except in vertical arcs RTML Return Line Transport low emittance beam

June 13, 2007 Global Design Effort 10 Control System Design SLAC proposed new standard for controls ATCA – Advanced TeleCommunications Architecture Cost effective platform for High Availability SLAC/UIUC collaboration on test prototype XFEL is adopting ATCA Detectors interested too

June 13, 2007 Global Design Effort 11 EDR Phase SLAC will likely lead e-, BDS, RF sources & Linac design but expect others to take over e+ and RTML SLAC will lead Installation planning CFS study shallow site, provide liaison to AS Critical R&D e- source, RF sources, BDS (previous talks) DR electron cloud (M. Pivi is WP leader) DR kickers (2 projects) High Availability Power Supplies & Diagnostics Beam Dynamics/Wakefield Simulations (SciDaq)

June 13, 2007 Global Design Effort 12 Very High Priority DR R&D Lattice design for baseline positron ring Lattice design for baseline electron ring Demonstrate < 2 pm vertical emittance Characterize single bunch impedance-driven instabilities Characterize electron cloud build-up Develop electron cloud suppression techniques Develop modelling tools for electron cloud instabilities Determine electron cloud instability thresholds Characterize ion effects Specify techniques for suppressing ion effects Develop a fast high-power pulser WP WP WP WP WP WP "Very High" priority items divide into 6 Work Packages A. Wolski - S3

June 13, 2007 Global Design Effort 13 Multi-pronged program Simulations (SLAC, KEK, LBNL) Secondary Yield studies Test sample chamber in PEP-II Chambers with fins to trap e- E-cloud R&D Program Mauro Pivi

June 13, 2007 Global Design Effort 14 SEY test station in PEP-II LER Manipulator at 0 o position PEP-II LER e+  Manipulator at 45 o position Samples location inside beam line Isolation valves (2) ILC tests, M. Pivi et al. – SLAC

June 13, 2007 Global Design Effort 15 SEY test chamber samples - TiN Secondary Yield after two months of conditioning in PEP-II LER SEY recontaminationSEY before/after conditioning SEY increases slightly if sample is left under vacuum following conditioning

June 13, 2007 Global Design Effort 16 LER#1 XPS Before installationXPS After exposure in PEP-II LER for 2 months (e dose 40mC/mm^2) Carbon content is strongly reduced after conditioning with synchrotron radiation + electrons + ions in PEP-II LER. This is completely different from laboratory tests with electron (only) conditioning where carbon crystals actually grow. Surface analysis: Carbon content decrease X-ray photon spectroscopy ILC tests, M. Pivi et al. – SLAC

June 13, 2007 Global Design Effort 17  M. Pivi – L. Wang – T. Raubenheimer - P. Raimondi, SLAC. Mar 2006  M. Pivi – L. Wang – T. Raubenheimer - P. Raimondi, SLAC. Mar 2006 Layout of the clearing electrodes in ILC DR BEND vacuum chamber +100V clearing electrodes suppress electron cloud buildup E-cloud Clearing Electrodes

June 13, 2007 Global Design Effort 18 System availability studies Design of high availability hardware (SLAC, LLNL) Kickers, Power supplies, diagnostics, and control system General control system design (with ANL, FNAL, …) Fast (redundant) kicker for DR High Availability Design Modular 4 of 5 power supply with auto-failover

June 13, 2007 Global Design Effort 19 TESLA Cavity Imperfection Study Omega3p model (SciDaQ) 1st band 6th pair2nd band 6th pair Actual cell shape differs from the ideal due to fabrication errors, stiffening rings, frequency tuning process deformed cavity Black – design Red/Blue – after cell deformation (#4, …)

June 13, 2007 Global Design Effort 20 Summary RDR SLAC had a major role in the design of all area systems, cost optimization and costing SLAC led the editing and authored > 1/3 of the sections Critical R&D SLAC has a major role in e- sources, simulations, RF - modulators, klystrons, distribution & couplers, e- cloud mitigation, DR kickers, BDS, MDI, ATF-II EDR SLAC leads e- source, BDS, RF sources, Linac design, Installation planning, System Integration