Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
The Central and Southern Florida Project Conceived by Florida Built by the Corps Integrates a Large Dynamic Economy and Multiple Valuable Ecosystems How.
Preparing for the Rainy Season SFWMD Operations & Actions.
The South Florida Watershed
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
National Park Service - DOI Everglades National Park Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project.
Settlement Agreement April - September 2008 Prepared for the Technical Oversight Committee January 29, 2009.
SETTLEMENT AGREEMENT REPORT October - December 2009 Technical Oversight Committee March 2, 2010 Pam Lehr Section Leader Restoration Sciences Department.
. Topographic map of the Refuge marsh (figure provided by Dr. E.A. Meselhe based on USGS topography data). Elevations are in feet, NGVD29.Form USGS data;
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Everglades Protection Area Tributary Basins January 15, 2004 Tracey Piccone, P.E.
Framework Agreement Principals Meeting #5 March 23, 2015 Everglades Water Quality Restoration.
CRFS Technical Meeting LC Operations Update November 8, 2011.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
Grays Harbor County Shoreline Master Program Update Our Heritage, Our Future Grays Harbor Master Builders January 9, 2012.
Water Supply Planning Initiative State Water Commission November 22, 2004.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
Water Resources Advisory Commission January 5, 2006.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Water Resources Advisory Commission Lake Okeechobee Committee January 25, 2006 Susan Gray, Ph.D.
Idaho Water Supply Committee Meeting Southwest Idaho Report March 14, 2014.
PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Basin-Specific Feasibility Studies STA and Reservoir Alternatives Basin-Specific Feasibility Studies STA and Reservoir Alternatives November 21, 2002 Presentation.
VALIDATION OF CLIMATE- BASED LAKE OKEECHOBEE NET INFLOW OUTLOOKS LONINO Paul Trimble Jayantha Obeysekera Ph.D., P.E., D.WRE Jayantha Obeysekera Ph.D.,
One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers 1 Coastal Protection and Restoration Advisory Committee 3 April 2006 D
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Comparison of Arithmetic Mean Stage vs. Weighted Mean Stage in Refuge Compliance Calculations Cheol Mo, PhD Lead Environmental Scientist South Florida.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
The Lake Okeechobee Protection Plan Evaluation Update, 2007 The Lake Okeechobee Protection Plan Evaluation Update February 8, 2007.
Settlement Agreement April June 2007 Prepared for the Technical Oversight Committee August 28, 2007.
Lake Okeechobee Regulation Schedule
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Model Overview Application of CALSIM II to Friant System.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Teton Basin Study Teton Lake vs Teton Dam.
1 Upper Basin Snowpack as of 3/26/2014
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Water Conditions Summary Jeff Kivett, PE, Division Director Operations, Engineering.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
Western Municipal Water District Drought Update
Monthly Drought Reporting to the State Water Resources Control Board
December 2017 Dynamic Position Analysis Modeling Assumptions
2018/2019 School Calendar July August September October November
Presentation transcript:

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals STAs and Related Projects Update Quarterly Meeting of the Technical Oversight Committee January 29, 2009 Tracey Piccone, P.E. South Florida Water Management District

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals STA Performance Data Updated Dec. 9, Contains Preliminary Data STA-1ESTA-1WSTA-2STA-3/4STA-5STA-6 Sep – Nov Oct – Nov June 1999 – Nov Oct – Nov Oct – Nov Oct – Nov Average Inflow TP (ppb) Average Outflow TP (ppb) TP removed (m tons)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals STA Performance Data Updated Dec. 9, Contains Preliminary Data Previous Year (December 2007 – November 2008) STA-1ESTA-1WSTA-2STA-3/4STA-5STA-6 Average Outflow TP (ppb)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals LWDD Water Supply Pumps Increase use of C-51W for water supply deliveries to Lake Worth Drainage District (LWDD) Increase use of C-51W for water supply deliveries to Lake Worth Drainage District (LWDD) ØReduce use of Refuge for LWDD water supply ØReduce need for water supply deliveries to Refuge ØReduce potential impacts of Lake Okeechobee water supply deliveries on the Refuge Provide LWDD more operational flexibility Provide LWDD more operational flexibility ØCapture local and eastern runoff and seepage ØReduce loss of valuable runoff to tide

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals LWDD Water Supply Pumps

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals LWDD Water Supply Pumps Temporary pumps installed at Control No. 2 to test feasibility of moving water to LWDD along C-51 Canal Temporary pumps installed at Control No. 2 to test feasibility of moving water to LWDD along C-51 Canal Two-year test between 2005 and 2007 Two-year test between 2005 and 2007

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals LWDD Water Supply Pumps Recommendations resulting from pump tests Recommendations resulting from pump tests ØInstall new 100 cfs pump at Control No. 11: Complete

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals LWDD Water Supply Pumps Recommendations resulting from pump tests (cont.) Recommendations resulting from pump tests (cont.) ØReplace Control No. 2 with new 100 cfs pump: Complete Electrical work underway, testing to follow Ø$600,000 project (50/50 cost share between SFWMD & LWDD)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Sixth Annual Public Meeting on Implementation Progress of the Long-Term Plan Wednesday, February 25 Wednesday, February 25, 2009 South Florida Water Management District Headquarters Building B-2, Conference Room 3W Meeting Notice