Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM www.europeanspallationsource.se 15 th October 2015.

Slides:



Advertisements
Similar presentations
Dr. Ruth Collins TrinityHaus
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Installation. Indoor Unit Installation Typical Installation.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, Y. Bessler (FZJ), M. Klaus (TUD), H. Quack (TUD) TAC12 Presenters:
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Neutron Chopper Technologies Work Package
Joints for Diaphragm Walls
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, M. Andersson, M. Pucilowski, T. Hedlund, A. Olsson TAC11 Lund, 1 st.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Status of design and production of LEP connection cryostat
Progress and Issues with VTS Upgrade
INSTALLATION SEQUENCE
News and brief overview of Beamline plans for the next few months
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
TEC Services Status 30/12/2018 Nick Lumb.
ESS Concrete Pit Lids.
Operations, Risks & Hazards
The Bunker Project Overview Zvonko Lazic
Roof design Bunker Project CDR
Electrical and fluid couplings
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
STUB configuration Mats Pålsson
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
Radwaste: status & way forward
Bunker Project Schedule/Budget
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015

Outline Current Status Current Developments on – Stainless Steel Liner and Anchor Plates – Electrical Conduits and Junction Boxes – Confinement Penetrations – Internal Casks Next 3 months Risks and Issues 2

Current Status Currently there are 6 ESS staff, full time on the Active Cells WU and 2 Master Students In-kind partner selected for the active cells – UKAEA/Culham – Ramping up effort First major procurement of cast in items in progress Internal Cask concept development in collaboration with development of monolith and shielding design 3

Current Status at Site 4

The Active Cells Layout 5 Process cell – Introduction of radiated components from the high bay, processing of components and preparation for interim storage and shipment as well as refurbishment in specific cases. Maintenance cell – Maintenance of equipment and logistical hub for transfer inside the active cells. Storage pits – Intermediate storage of vessels awaiting off-site shipment. Technical galleries – Contains the remote handling interfaces for active cell operations, component storage, PIE activities, human logistics around the cells and air locks for entrance into the maintenance cells. Transfer area – For off-site shipment of casks, control and decontamination of shipment cask surfaces. Process Cell Transfer Area Maintenance Cell Storage Pits Size: Height 15 m Length 30 m Width 12 m Shipment Technical Galleries

Process Cell details 6 Power ManipulatorSawHEPA FiltersThrough Wall Manipulators Work TablesRotating Tables El. and I&CCameras Liner Beams Anchor Plates

Stainless Steel Liner 7 Maintenance Cell Floor Storage Pits Process Cell Floor Liner Beams Anchor Plates in Floor Liner Beams 120x70 Plates 4 mm on floor 2 mm on wall and roof Anchor plates combined with liner beams to ensure alignment Storage pits – prefabricated First Items on-site in March 2016 – Finished Sept 2017

Liner Beam Prototypes 8 Testing folding accuracy Filling degree of concrete underneath the beams – test casting with high density concrete Will perform bending and pull out tests

Electrical Conduits and Junction Boxes 9 Maintenance Cell Process Cell Transfer Area Technical Galleries Cold side connection Remote accessHands-on Grayboot Connector Diameter 114 mm Pipe routing from cold to hot side to avoid weak spots in the walls 1 meter bend radius

Confinement Penetrations - Layout 10

Confinement Penetrations 11 Stainless Steel Straight pipe, without step Oversized flanges 254 mm diameter In total Evenly distributed One size – increase flexibility Min. 2,7 meters from floor Tight tolerances between tube and plug

Target Wheel hoisting with shroud 12 5 cm Pb Shroud Wheel with Shroud Cask docking on top of Shielding ring Pb shroud lowered Lifting hoist connected to top of shaft Wheel lifted Shroud follows wheel up

Target Wheel combined cask 13 The target wheel casks will be able to lift both the wheel and the centre shielding block Target Wheel block in cask has a total weight of 85t Shielding block storage in high bay Storage Cylinder in High Bay Shielding block in cask Target Wheel in cask

Near Term Plans (next 3 months) Part 1 Critical Design Review for Confinement Systems follow up Perform Preliminary Design Review of Handling and Equipment Work Unit Initiate procurement process for cast in items Detailed Design of 2 nd in line cast in items Agree on installation interface of cast in items with Conventional Facilities/Sweco/Skanska In-kind kick off meeting in December Ramp up focus on monolith handling and cask operations 14

Risks and Mitigations Procurement of cast in items take longer than expected and will delay construction project – Hold Critical Design Review (CDR) for first set of cast in items prior to full system CDR to ensure timely delivery Cast in installation work takes longer than expected – active discussions with Conventional Facilities/Sweco/Skanska and inclusion of their experts in CDR review panel Suitable fire suppression system hard to find – Seek advice from fire suppression and hot cell experts 15

Fire Suppression System An active fire suppression system will be provided for defense in depth Candidates: – Nitrogen gas – Hypoxic gas environment – Water mist* – Water mist mixed with Nitrogen gas *) Currently preferred solution 16

Conclusions Layout – concrete interface with CF is fixed High focus on detailed design of cast in items Start procurement of cast in items in near future PDR of Handling and Equipment WU during autumn Final CDR of confinement systems before Christmas 17