From RNP Divergence to Performance Based Navigation Convergence

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

Regional RAIM Prediction System – Progress Report
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
Overview of the PBN Airspace Implementation Processes
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Performance based navigation: The ICAO PBN programme
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
The Way Forward for ICAO Nancy Graham Director, Air Navigation Bureau, ICAO Gdansk International Air & Space Law Conference – Poland in International Civil.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
PBCS Workshop Bangkok, Thailand, May, 2013
ICAO Provisions for Safety Management
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
APAC PBN Seminar F.LECAT (ICAO)
PBN Airspace Concept Process
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
Area Nav: RNP Evolution
ICAO SARPS and Guidance Material
Performance Based Navigation
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
PERFORMANCE BASED NAVIGATION OPERATIONAL APPROVAL
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, March Performance Based Navigation The Future Erwin Lassooij Manager.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March Dave Nakamura ICCAIA/Boeing Member to ICAO OCP and RNP SORSG.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
1 Dave VanNess Implementation and Resource Development Coordinator Performance Based Navigation Programme ICAO, Montreal Dave VanNess Implementation and.
1 Presented by Erwin Lassooij Presented by Erwin Lassooij The Future on RNAV and RNP NAM/CAR/SAM Regional Seminar on RNAV and RNP Implementation Mexico.
Overview of the PBN Airspace Implementation Processes
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
Performance Based Navigation The Future
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Overview of Continental En-route Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Regional RAIM Prediction System – Progress Report
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Airspace Concept Workshop
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
ASEAN PBN Routes Objectives:
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
RNAV and RNP Strategy in Japan
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN ICAO HQ Activities Overview
Presentation transcript:

From RNP Divergence to Performance Based Navigation Convergence Presented by Erwin Lassooij Manager Performance Based Navigation Programme (ICAO, Montreal)

Goal of presentation To update participants about: Need for Performance Based Navigation The activities in ICAO on PBN To inform on the status of the concept of RNAV and RNP in relation to PBN To inform about other provisions to be delivered by ICAO To inform on the envisaged timeline Explain details on the PBN manual Awareness an implementation Actions proposed by COSCAP-NA

PBN solution to modern navigation implementations Performance based navigation allows: Predictable, flexible flight paths (through prescribed navigation specification) Performance requirements that addresses the continuous growing number and combination of navigation sensors Optimum use of existing capabilities in modern type of aircraft Solution for: Safety, efficiency, capacity, fuel efficiency and noise problems

The problem Current ICAO RNP concept Current applications: RNP 10 RNP 4 RNP 0.3 Containment based on: Accuracy Integrity Continuity Availability ICAO RNP provisions insufficient to meet terminal airspace and approach requirements

The problem Developments outside ICAO RNP concept has continued to evolve RTCA/EUROCAE defined performance and functional requirements Aircraft manufacturers deliver “RNP” based on different versions of requirements Confusion in implementation!

F U T R E RNP Divergence P R E S RNP N T Europe B-RNAV US Boeing Australia Canada South America China Japan Airbus B-RNAV P-RNAV US-RNAV RNP10 RNP 4 Boeing RNP RNP/RNAV

ICAO Assessment Individual ANC Panels unable to address the problem Need for focal point in ICAO to address problems experienced with RNP Concept (GNSSP/4 recommendation 1/1) ANC (163/9) approves establishment of Required Navigation Performance Special operations requirements Study Group (RNPSORSG) as coordinating group

RNP SORSG Main Goals Common understanding of the RNP concept and the relationship between RNP and RNAV functionality; Harmonize use of RNP and RNAV functionality on global basis, for benefit of operators. Identify operational requirements for RNP and RNAV

RNPSORSG RNP Concept issues Main issues: On-board performance monitoring and alerting ICAO does not currently specify this RTCA does specify, consistent with cockpit terminology Addition of functionality requirements

RNPSORSG RNP Concept issues On-board performance monitoring and alerting function. A function on board the aircraft that detects and informs the crew when the RNAV system is unable to satisfy the performance prescribed in the navigation specification. The required level of on board monitoring and alerting is stipulated in each RNP specification.

Agreeing PBN PBN specifies RNAV system performance i.e. accuracy, integrity, continuity, availability + functionality; - written up in navigation specifications This is different than the RNP concept, which stressed navigation accuracy and ‘stopped’ at required performance. However, PBN is anchored in detailed navigation specifications, which contain performance and functionality requirements. RNP X specifications RNAV X specifications Require on-board performance monitoring + alerting Do not require on-board performance monitoring + alering

Harmonizing PBN Common understanding of the performance based navigation concept and the relationship between RNP and RNAV functionality Harmonization between States

RNP SORSG - Harmonization   RNP SORSG - Harmonization Area of Application Nav accuracy Designation of navigation standard: Current situation Designation of navigation specification: PBN concept (new) Simplification results in Lower costs for Operators and ANSP Oceanic/ Remote 10 RNP 10 RNAV 10 (RNP 10 label) 4 RNP 4 RNP 4 EnRoute- Continental 5 RNP 5 Basic RNAV RNAV 5 En Route - Continental and Terminal 2 USRNAV type A RNAV 2 Terminal 1 USRNAV type B and P-RNAV RNAV 1      

RNP SORSG Terminal airspace Common understanding of the performance based navigation concept and the relationship between RNP and RNAV functionality Harmonization between States Development of RNP 1 and 2

RNP SORSG RNP 1 and 2 Work in progress RNP 1 requires on board performance monitoring and alerting Basic RNP 1 Advanced RNP 1 (work in progress) RNP 2 (work in progress)

RNP SORSG Approach concept Common understanding of the performance based navigation concept and the relationship between RNP and RNAV functionality Harmonization between States Development of RNP 1 and 2 Development of RNP for approach

RNP SORSG Approach Concept On-board performance monitoring and alerting required RNP APP: RNP approach for lowest common denominator Meets RNP0.3 in final segment Basic GNSS/SBAS Functionalities: VNAV optional No Special authorization required RNP AR APP (Authorization Required): Scaleable RNP (0.3 – 0.1NM) Functionalities: VNAV, RF legs Authorization required (small protection area) Operational approval Aircraft qualification

RNP AR approach-example

RNP SORSG Performance Based Navigation Concept No perf. monitor and alerting Perf. Monitor and alerting RNP 4, Basic RNP 1 RNP APP, RNP AR APP

Overview of Navigation Specifications

PBN F U T R E P R E S PBN N T PBN Convergence…. EUROPE B-RNAV US Boeing EUROPE US Australia Canada China Japan Airbus South America B-RNAV P-RNAV US-RNAV RNP10 RNP 4 PBN PBN RNPSORSG initiatives

Through implementation to PBN convergence Need for Global integrated implementation programme “ICAO PBN programme” Development/maintenance of provisions Create awareness and acceptance Training and awareness material Ensure Implementation Through implementation to PBN convergence

RNP SORSG Provisions From concept to ICAO provisions …

ICAO Provisions Performance Based Navigation Manual PBN Manual to provide a “one-stop shop” for States on how to implement RNAV and RNP in their airspace PBN Manual being developed: Two Volumes: Volume I – An Application of RNP and RNAV Concept of PBN and how it is used Implementation Guidance to States / Regions Volume II – Compendium of Navigation Specifications RNAV 10 RNAV 1 RNP APP RNAV 5 RNP 4 RNP AR APP RNAV 2 Basic RNP 1 Advanced RNP1* RNP 2* * Work in progress

ICAO provisions Standards Annex 2, 4, 6, 10, 11 and 15 Procedures PANS-ATM, PANS-OPS, regional SUPPS Manuals Manual on Performance based navigation Manual on RNP/AR procedure design Manual on Quality Assurance in Procedure Design Ensure centralised maintenance of the concept Gap analysis Future expansion based on ops needs

Thank you for your attention! END Thank you for your attention!