Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.

Slides:



Advertisements
Similar presentations
Energy Balancing Credit Proposal MOD 315 Energy Balancing Credit Proposal MOD 315 To Enhance Section X of the UNC Transportation Principal Document to.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Transmission Workstream.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Review Group -140 Thoughts on additional information requirements.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
Energy Balancing Credit Proposals Transmission Work Stream 7th October 2010 Loraine O'Shaughnessy.
MOD0335: Offtake Meter Errors David Watson Distribution Workstream - 28 th October 2010.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Gas Performance Assurance Framework 11 th January 2013.
Meter Error – NTS Revenue Flows Gas TCMF – 2 nd December 2010.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
1 Modification 0152V Implementation Matters 25 October 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Exit Capacity User Commitment – Transmission Workstream update
Action 0002: Meter Error Notifications
UNC Trader User – Licence obligations
Incentives 26 September 2018.
Modification th July 2008.
UNC Modification 0335 – Offtake Metering Error Payment Timescales
CSEPs Reconciliation Proposals
Long Term Non Firm Capacity Update
Stefan Leedham 22 November 2007
OCC & Standard Commodity Changes
Entry Overrun Calculation
Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.
MP0131: Meter Error Notifications
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Assignment of NTS Entry Capacity – Previous Work Undertaken
Project Nexus Workgroup
Presentation transcript:

Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011

2 Modification Proposal 0395 / 0398  Both Modification Proposals seeks to reduce the meter reconciliation period  0395 sets it to a minimum of 2 years and a maximum of 2 years and 364 days  0398 sets it to a minimum of 3 years and a maximum of 3 years and 364 days  Current UNC sets it to a minimum of 4 years and a maximum of 4 years and 364 days

3 Cash Impact of the retrospective invoicing limits

4 Aberdeen SC006 SMER  Early estimate of the magnitude of the error included daily correction factors of:  for the period 21/09/09 to 27/07/10  for the period 28/07/10 to 09/08/10  Using actual flow data and system average prices gives a result of:  £18,657,966  £7,814,778  Bearing in mind the timescales for delivering the SMER through the industry’s LDZ Meter Error Guidelines and invoicing it, clearly there is a risk to the NTS shipping community were the £18M to fall outside the timescales proposed in 0395 or  Later implementation of either mod proposal would perhaps allow Aberdeen to be reconciled. It must be stressed the figures quoted here are illustrative only. The results of the Aberdeen SMER are for expert determination.

5 Mod 0395 impact on Error Detection & Reconciliation Timeline 21/07/09 Last Good meter reading (2009 validation) 21/07/10 Error detected following 2010 validation27/09/10 Notification to Joint Office SMER Process It is in the gift of the industry to determine the time of total time to produce the final report. Typical Process Appointment of ITE(s) ITE Testing/Analysis Compilation of Report Agreement of Report (Potential of feedback loop) Publication of Final Report Period reconcilable under Mod /04/10 Code cut-off date under mod 395 for fiscal year Industry Process NG Process 3 months UKT begin review of SMER UKT obtain financial sanction Data sent to xoserve via RBD return Reconciliation invoices issued Reconciliation invoices due date Data sent to xoserve via RBD return

6  Much of the evidence presented in support 0395/0398 is in terms of DN RbD activities.  Less analysis of impact that Proposals may have on NTS Users, particularly in respect of NTS/LDZ meter reconciliation.  0395 proposer’s analysis identifies that majority of LDZ meter errors are under-reads.  The risk from not re-apportioning under-read energy at an NTS/LDZ offtake sits with the NTS Shippers through the Shrinkage Incentive. Impact of proposed retrospective invoicing limit on the Transmission Activities

Background information National Grid Transmission’s UAG role and performance

8  NG NTS is cash neutral with regard to NTS/LDZ Offtake Meter Reconciliation.  NG NTS does not own NTS/LDZ meters.  NTS Connected Meter Assets predominantly owned by DN’s, Terminal Operators and Large Industrial End Consumers  NG NTS has a Meter Assurance role and therefore monitors Asset Owners’ compliance with meter validation obligations  NG NTS may also assist the Asset Owner in the discovery of meter errors through its Data-mining initiatives. National Grid NTS role in reducing UAG

9 NG NTS Meter Assurance Role  NG NTS has to date received zero UAG incentive revenue.  Since 2009 NGG NTS has undertaken a range of activities to address UAG.  NGG NTS has incurred additional cost for carrying out these activities and delivered User benefits.  Costs of Data Mining from April 09 to date ~£240,000.  NG NTS Data Mining has contributed toward discovering measurement errors at both entry and exit.

10 UAG Costs as a % of throughput  For 2009/10 value of UAG compared to overall system throughput was 0.6%.  With a gross value of ~£100m p.a for 2009/10  With correction of recent Significant Meter Errors, Data mining has contributed to an estimated UAG reduction to 0.5% of overall system throughput, with a significant reduction in gross cost to the industry.