1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

January 11, Data Format for MICE Trackers Tracker Data Readout Basics Preliminary Tracker Data Format and Suitability for VME Data Transfers. Questions.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Line Efficiency     Percentage Month Today’s Date
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
Group 5 Alain J. Percial Paula A. Ortiz Francis X. Ruiz.
LKr readout: present and future R. Fantechi 30/8/2012.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
CSE430/830 Course Project Tutorial Instructor: Dr. Hong Jiang TA: Dongyuan Zhan Project Duration: 01/26/11 – 04/29/11.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
EE 345S Real-Time Digital Signal Processing Lab Fall 2008 Lab #3 Generating a Sine Wave Using the Hardware & Software Tools for the TI TMS320C6713 DSP.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
Jan 2016 Solar Lunar Data.
Tracker TriP-t Test Stand
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Muon Recording Studies and Progress for the MICE Tracker
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
This Presentation Pack is brought to you by
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Step 3 Step 2 Step 1 Put your text here Put your text here
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
Budget Planning Calendar
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August 1, 2007 Updates since July 12, 2007 Tracker Meeting shown in bold, italic, purple text.

2 AFE IIt Firmware Modifications Modifications needed for data buffering –Shorten time to digitize data Zero suppression End digitization series after last channel above threshold These are done. –Protocol for data transfers between DFPGA and AFPGA Bitmaps from DFPGA to AFPGA Digitized data from AFPGA to DFPGA This is done. –Buffer triggers in DFPGA FIFO This is done. DFPGA AFPGA ADC TriP-t Data from VLPCs Memory Bank Shown at July 12, 2007 MICE Tracker Meeting

3 Immediate AFE IIt Firmware Tasks Synthesize AFGPA and DFPGA firmware modifications. –FNAL concentrating of AFPGA –RAL concentrating on DFPGA: event synchronization to be finished –Compilation of latest code versions to be done soon. Kwame Bowie and Bill Luebke working on this at FNAL. DFPGA and AFPGA compilation successful Test operation of entire board. –Signal timing needs to be checked. –Check compatibility of modified firmware with existing firmware. –ChipScope signal analyzer checks if signals match simulations. Tests just started Key output signals not seen in initial tests (not unexpected at start). Terry Hart, MICE Tracker Meeting, August 1, 2007

4 VLSB Firmware Main task: set up initial signals correctly for simulation –Documentation and expertise are limited Not as dire as previously thought; Bill Haynes at FNAL very helpful. –Simulations of unmodified firmware completed. Access to computer with Aldec simulation tools Compile firmware Set up initial signals and run simulations until input data and address are written to memory bank addresses. Modifications for MICE –Event counter during spill (will check with Malcolm) –Fast clear of VLSB memory (follow up with Bill Haynes) –Overwrite memory addresses only when there’s data Data are stored in continuous memory blocks. (Initial results good. Checks underway. ) –Enable Direct Memory Access block transfer (done) AFPGA controls ADC and TriP-t operation DFPGA directs DFPGA and AFPGA data flow VLSB memory banks storing charge and time data Terry Hart, MICE Tracker Meeting, August 1, 2007

5 Hardware Updates VLSB Boards –9 boards are built (to be spares), –15 more to be made After interruption from FNAL departmental restructuring, production restarted thanks to Alan Bross. VLSB Cables –May need to be 9 meters long made from three 3-meter long cables. –Over 2 × 10 6 words transferred on 4 LVDS links over 9-meter cables. –Tests continuing to ensure reliable data transmission of ~ 10 6 muons. AFE IIt boards/Cryostat –Data taken for 2 of 4 production cryostats (8 boards assigned). –Preliminary assignment of 7 of 8 boards made for 2 remaining cryostats. –8 spare boards remaining after 15 assigned boards (23 total AFE IIt boards for MICE) Terry Hart, MICE Tracker Meeting, August 1, 2007

6 TriP-t/ADC Control Firmware Hardware tests DFPGA/AFPGA I/O Bus Board test at MHz Board test at 55 MHz Simulations at different frequencies Data transfer protocol AFPGA Firmware Write firmware controlling bitmap transfers Test pipeline/buffer operation Test mode development DFPGA Firmware Make 4-level trigger buffer Data format VLSB Firmware (simulation progress reported) Event aggregation (VLSB) Data block transfer Fast clear of memory banks Suppress writing zeros to memory VLSB Board Manufacture (15 boards) AFE IIt Board Preparation Repairs for MICE Firmware and hardware modifications Board characterization in cryostats Ship cryos/boards to RAL Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Done Conservative simulations indicate this is o.k. Done Standalone routine written Feedback loop testing previous version Should be quick; not done Initial code written, testing started Low to middle priority Process being worked out Ongoing Initial versions done; testing started Done Data taken for cryostats 1 and 2 Cryostats 1 and 2 shipped

7 Summary First version of AFE IIt firmware development to enable trigger buffering done. Analysis of AFE IIt signals to be started soon. –Compilation of DFPGA and AFPGA code done. –Tests of timing and how close signals are to simulation results started. VLSB firmware development almost done. –Simulation of initial firmware done (This was the hard part.) –Simulation of our modifications started with initial good results. Almost all AFE IIt boards for MICE are available. VLSB board assembly for MICE restarted. Terry Hart, MICE Tracker Meeting, August 1, 2007