Meter Reads-Method Project Number 0307-23-001 Black Belt Rob Zinsky Northeast region.

Slides:



Advertisements
Similar presentations
Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: October 1, 2015 Team members: Joe Jones TECH
Advertisements

Identify and Control Printing Costs. Can You Answer These Questions? How many printers, copiers, MFPs do you have? Are they being properly used? Too much?
Revenue Protection Process Options with Relation to Smart Meters.
1 Chapter 3 Project Organization, Selection, and Definition.
Six Sigma Dr. Ron Tibben-Lembke SCM 462 Dr. Ron Tibben-Lembke SCM 462.
The Analyst as a Project Manager
Barry Murash MBBit Nortel 2007
Premium Reduction & Delivery Improvement
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
“Safety is a Measure of Success”
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Leadership and Culture SEA Managed Process Continuous Improvement Process Presented May 24, Phone: 1(203)
Items Required for Process Hand-off
REDUCTION OF OUTBOUND FREIGHT COSTS - EQUIPMENT Black Belt - Nicole Brannon Champion - Tony Martino MBB - Art Girard FA - Diane Brightwell.
Project Selection & Scoping Overview Dan Sommers PG: Dan this does not appear to be a full hour of material??? PG: Dan this does not appear to be a full.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Executive Case Study Credit Card Declines.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Project Title GB or BB name: XYZ.
Project Storyboard (Page 1 of 2)
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Assets Returned From Lease Project: Bill Cody Black Belt September 25, 2003.
Inconsistent Administration of Sales Commissions Status Report August 28, 2003 Norcross, GA.
Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Operations/Northeast BU – Steering Comm Presentation.
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
IT Asset Reassignment / Moves David Levine Information Technology IKON Network Center.
Project Update Effective Product Launch Vendor Integration Inga Broerman Black Belt Marketing - Corporate.
Contract Setup Accuracy Project Black Belt: Rob Vaughn Week 2 Presentation Define and Measure Phase.
Project Charter Revenue/Sales Implications of Trials Black Belt Jack Thackrah NE Region BS – Malvern PA.
Canon Strategic Marketing Plan - Supply Credits
Working Capital - > 90 Day Delinquency Project – Heath Peacock Finance Tempe, AZ - CCC.
Total Call Process Effectiveness Black Belt – Alan Libbert Function: Operations/Service.
Project Selection & Scoping Overview Deb Dixon. 2 Objectives Explain why effective project selection is so critical Project Selection Approach Characteristics.
Product Promotions Effectiveness Chris Tantakis Canada.
Sales Forms Package Art Zieky INA-Sales Operations Macon, Malvern.
David Pasquarello Ikon Office Solutions
Project Chartering & Approval Process
Assets Returned From Lease Project: Bill Cody Operations Columbus OH.
Six Sigma Black (& Blue) Belt: Jeanette Wall. Unapplied Cash-Calculation Error Jeanette Wall Operations Location- Company-wide CANCELLED!
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
Meter Reads-Optimum Calling Process Project Number Black Belt Rob Zinsky Northeast region.
National Accounts/Meeting Customer Expectations - Customer Training Marty Brecht - Black Belt INAP.
Service Productivity- Parts Project # Black Belt – Rich Capasso Northeast Region.
Roles and Responsibilities of the Finance Support Team
Effective Product Launch Vendor Integration Inga Broerman Black Belt Marketing - Corporate.
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.
Set Up-Pick Up Coordination Asset Recovery Cluster Black Belt Brent Wigington Western Mountain West.
Collections Accountability Leases that Terminate into Term Code TMDCR Tom Merry October 23, 2003 Week 4 Presentation.
Assets Returned From Lease Project: Bill Cody Black Belt Week 3 Report Out.
Deal Approval Process Project # &
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Northeast BU – Forecasting/Service/ Revenue/Base/Type of Machine.
Contract Setup Project Black Belt: Rob Vaughn Week 3 Presentation Houston, TX.
Unapplied Cash – Canon & Ricoh Credits, Discrepancy in System Project # Black Belt - Jonathan Williams Division- Service/ Order Entry/Vendor.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Credit/Rebill – Field Service Incorrect Billing. The Problem We are generating invoices for service calls on machines that have contracts, are IKON fixed.
Inconsistent Administration of Sales Commissions Project Status October 23, 2003 Norcross, GA.
Collections Accountability Leases that Terminate Following Automatic Renewal Tom Merry September 24th, 2003.
Change Development Rework Leonard Sealy Corporate Supply Chain – Rochester, NY.
Canon Strategic Marketing Plan - Supply Credits Marcus Downey South Region.
Meter Reads- Web Meter Effectiveness Project Number Black Belt Cathy Delvalle Atlanta CCC.
A cross functional team was formed to review the current revenue protection process, the potential impact due to the implementation of Smart Metering.
General Guidelines for this Template Add the letter of the stage (DMAIC) you are in on EACH SLIDE. Don’t feel like you have to use the tools at the end.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
Measure Phase Wrap Up and Action Items
Presentation transcript:

Meter Reads-Method Project Number Black Belt Rob Zinsky Northeast region

2 Background – Current Process n There are currently up to 12 ways in which a meter read can be attained from a customer. n Missed meters equals missed revenue. n Vendor contracts can not use an estimated meter read to bill. n Currently, we bill contracts monthly, quarterly, semi- annual and annually. n In any given month, we can leave up to 40% of our meters unread. n Each machine within a fleet must have a meter read or the entire contract will not bill. n There are a wide variety of contract types today, Copy Block, Copy Management, ITT’s, Fleet and others. n Measurement system is currently off goal.

3 Project Definition n Problem Statement: The e-IKON platform requires a valid meter reading be acquired or estimated within 15 +/- days of the billing date for every billing period to facilitate invoice generation. Currently 42% of meter reads do not meet standard. This directly impacts monthly base billing revenue. n Project Objective: To improve meter collection utilized for billing, from 58% collected per month to 88%. This project will focus on the optimum method and time to perform meter collection. Project Benefits: Timely revenue billing, reduce unbilled contracts, improve cash flow and customer satisfaction while reducing customer calls into the CIT.

4 Project Definition, Cont’d n Financial Benefits: Estimated $7 million in revenue that is not billed on a timely basis. Potential cost savings in labor and overtime. n Project Metric “Y”: Y 1 = Days from Contract Bill Date. Y 2 = Improve timeliness of meters collected. n Defect Definition: 15 +/- days of contract billing. n Leveragability: Meter collection timeliness is heightened in the e-IKON environment, so optimum return would be seen in those regions first with rollout to remaining OMD regions.

5 Project Team n Champion – Deb Kok n Financial Analyst – Peter Botkee n Black Belt – Rob Zinsky n Process Owner – Deb Kok n Master Black Belt- Laura Wells n Team Members: IT Support – Linda Hample, Jason Fitzwater and Ravi Balakrishan E-IKON & Web Meter Support – Mike Aiello, Dan Brown & Beth Beran IOSC Support – Susie Davis Contract Support – Sharon Herren Oracle Support – Erike Rudolph Subject Matter Expert/Process Owner-Deb Kok

6 Financial Benefits Increase in Revenue Productivity & Efficiency Savings n Increase in Cash Flow n Personnel Savings or reallocation n Increased Customer Satisfaction, both external and internal

7 Current Meter Read Process

8 Questions n Do we treat all contracts the same? n Are the contracts we collecting on worth the invoicing? n Where are the dollars coming from? Does the 80/20 rule apply? n Do our current methods of collection meet customer expectations? n Is there any prioritization or ownership? n How do I make sense of all this data?

9 CT Flow Down

10 Critical Successes n CUSTOMERS : -External -IOSC -Vendors n PROCESS : -To obtain a timely meter read in the most cost effective manner within the LSL of 15 days prior to contract billing or the USL of 15 days after contract billing.

11 Critical to Quality n CTQ : -A meter read must be entered or estimated in order to generate an invoice -The invoice needs to be delivered on a timely basis to the customer -The invoice shall have the correct contact information so it goes to the right person -The meter read shall be for the correct machine -The invoice should be clear and concise so our customer can understand -The invoice represents our company image

12 Critical to Delivery n CTD : -The invoice shall be delivered in a timely manner -The invoice shall be sent to the right contact -The invoice shall be delivered to the right address

13 Critical to Customer n CTC : -The method in which we obtain our meters has cost associated with it, drive out the cost and pass the savings on to the customer -The method of delivery has cost associated with it -Minimize administrative costs on customers and IKON’s end

14 Big Y/Primary Metric n Days from Contract Bill Date for each meter read as measured on a daily basis.

15 Scorecards Contracts Metric ReferencePrior WeekDate at beginning of measure mentEnding ##8/48/58/68/78/8 # Missing Meters Current* 1,2453,4082,1111,7701, # Missing Meters Past Due* 8,7827,1046,9686,8236, # Missing Meters (Oracle) 10,02710,5129,0798,5938,4818,472 # Florida Missing Meters Current* 1725,1274,8874,5464, # Florida Missing Meters Past Due* # Total Missing Meters19,03210,22115,66513,96613,13912,82911,837

16 SIPOC Starting Point

17 High Level Process map

18 Detailed Customer Phone Process Endless Loop

19 Web/IVR Detail Map All Defects go To MMR

20 Vendor detailed Map

21 Detailed Process Map

22 Detailed Process Map

23 High Level Process Map w/ X’s & Y’s

24 Detailed Process Map

25 C & E Matrix

26 Need to Complete w/ Data TASK to Complete Expected Date n MSA 9/5/03 n DPMO 9/3/03 n Z shifts 9/5/03 n Process Capability 9/5/03

27 Red Flags n Data, data, data n Current Reorganization n Overlapping Charters n Personnel n Time Sensitivity

28 Next Steps n Finalize Financial Benefit n Gather data to establish DPMO & Z scores n Send out C & E Matrix to determine data collection n Visit Houston CCC n Apply this week’s knowledge