Stéphane Gabourin TE/MPE-EP MPP – 23 th Oct 2015 CIBDS beam dump triggers due to glitches in BIS loop B1-A diagnosis and mitigation measures.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
4th July Two physics fill during the day Smooth data taking LHC plans changed: 90m run postponed to tomorrow (24h) OT FE still excluded, to be looked at.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
LHC 9 & 10 May :50: Start ramp for de-squeeze optics measurements 10:15: Measured squeezed optics 12:00: Dump 13:00: Start local aperture measurements.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
ADAPT is a Human Resources Community Initiative supported by the European Union through the European Social Fund (ESF)
Failure mode impact studies and LV system commissioning tests
A. Castañeda 07 th September 2009 Generators and Detectors Permit Loop / CIBG / CIBO 0v0.
1 Optical Time Domain Reflectometer Piotr Turowicz Poznan Supercomputing and Networking Center 9-10 October 2006.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
B. Todd et al. 25 th August 2009 Observations Since v1.
A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
JgimenoIWM-12/1/2004 Fiber Optic module 1 STUDIES AND DEVELOPMENT OF A FIRST FIBER OPTIC MODULE PROTOTYPE Javier Gimeno Vicente.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Signal Integrity Electro-Magnetic Compatibility Dependability.
Hints on debugging
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
ICT Module 4 Revision. ICT Attenuation and cable type What is attenuation What cable should be used between buildings and why?
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Monday October 5, 2015 WARM-UP: QUESTION #1 WEEK OF OCT 5 QUESTION - DESCRIBE HOW THE RESPIRATORY SYSTEM AND THE CIRCULATORY SYSTEM WORK TOGETHER. Unit.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
CERN Marc Magrans de Abril MPP – RBI DCCT Incident Beam Lost in TI2 Event Analysis and Proposed Mitigations SPS and LHC MPP
0v1.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC-RF activities in LHC PT 4 TS2 YETS LS2
LHC Beam Dumping System Reliability Run Summary
J. Uythoven for the MPE-MI & MS Teams
Commissioning and Testing the LHC Beam Interlock System
trigger and other general LBDS electronics
Collimator Control (SEUs & R2E Outlook)
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)
Wednesday 31 October: Morning
Scrubbing progress - 10/12/2012
LHC Morning Meeting - G. Arduini
LHC Status Sun Morning 20-Mai
LHC Morning Meeting - G. Arduini
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
RADIATION induced failures in LHC 28th June 2011
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Saturday 10:00: Cryo Pt8 back, starting the pre-cycle.
SPS Injection BIS - Draft requirements
Presentation transcript:

Stéphane Gabourin TE/MPE-EP MPP – 23 th Oct 2015 CIBDS beam dump triggers due to glitches in BIS loop B1-A diagnosis and mitigation measures

S. Gabourin – 23 th Oct 2015 BIS dump trigger 1 (6 th October) -On Tuesday 06 th Oct at 04:42:42, the CIBDS triggered a dump due to a loss of Beam Permit frequency detection on Beam 1 Loop A. -After investigation, the issue may come from the optical link which has a low power margin -From MPP on 09 th Oct: No else (yet…) 2

S. Gabourin – 23 th Oct 2015 BIS dump trigger 2 (15 th October) -On Thursday 15 th Oct at 19:25:56, the CIBDS triggered a second time a dump, still due to a loss of Beam Permit frequency detection on Beam 1 Loop A. Then comes the “else if another dump occurs”: -Check the optical link during a (long enough) stop of the LHC -Opportunity on Monday morning (loss of Cryo in Sect 1-2) -On Monday 19 th, the fibre between TZ76 and UA67 on Loop Beam-1 A was re-measured, including the CIBO in TZ76 3

S. Gabourin – 23 th Oct 2015 Action taken (19 th October) -RX power measured higher by 1.2dB => Change the active fiber by spare fiber -Check the 4 optical loops are properly re-close using the CIBG debug frequencies of kHz (not possible to forget the LoopA freq generator…) 4

S. Gabourin – 23 th Oct 2015 Proposal for future action -EN/EL have replaced the 6 fibers between UA67 and TZ76 during LS1 -Ask EN/EL their fiber attenuation data -Ask EN/EL to re-measure the fibers with professional equipment (OTDR), as we are using JDSU power source, power meter and attenuator.  Proposed by EN/EL for the EYTS -Then decide of another action has to be taken VS Power attenuator 5

S. Gabourin – 23 th Oct 2015 Questions