Connect. Communicate. Collaborate Global On-demand Light Paths – Developing a Global Control Plane R.Krzywania PSNC A.Sevasti GRNET G.Roberts DANTE TERENA.

Slides:



Advertisements
Similar presentations
Key Multi-domain GÉANT Network Services June 2011.
Advertisements

Grant agreement n° SDN architectures for orchestration of mobile cloud services with converged control of wireless access and optical transport network.
Connect. Communicate. Collaborate GÉANT2 JRA1 & perfSONAR Loukik Kudarimoti, DANTE 28 th May, 2006 RNP Workshop, Curitiba.
Draft-li-rtgwg-cc-igp-arch-00IETF 88 RTGWG1 An Architecture of Central Controlled Interior Gateway Protocol (IGP) draft-li-rtgwg-cc-igp-arch-00 Zhenbin.
ESnet On-demand Secure Circuits and Advance Reservation System (OSCARS) Chin Guok Network Engineering Group Thomas Ndousse Visit February Energy.
1 ESnet Network Measurements ESCC Feb Joe Metzger
Circuit Services - IPTV Christian Todorov Internet2 Fall Member Meeting October 9, 2007.
National Science Foundation Arlington, Virginia January 7-8, 2013 Tom Lehman University of Maryland Mid-Atlantic Crossroads.
GEANT Performance Monitoring Infrastructure – Joint Techs meeting July Nicolas Simar GEANT’s Performance Monitoring.
GN2 Performance Monitoring & Management : AA Needs – Nicolas Simar - 2 nd AA Workshop Nov 2003 Malaga, Spain GN2 Performance Monitoring & Management.
Linking European and Chinese Research Infrastructures and Communities.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE II - Network Service Level Agreement (SLA) Establishment EGEE’07 Mary Grammatikou.
Connect. Communicate. Collaborate Afrodite Sevasti, GRNET 8th Annual Global LambdaGrid Workshop Seattle, 1 st October 2008 Developments.
| BoD over GÉANT (& NRENs) for FIRE and GENI users GENI-FIRE Workshop Washington DC, 17th-18th Sept 2015 Michael Enrico CTO (GÉANT Association)
Connect. Communicate. Collaborate Building and developing international future networks Roberto Sabatino, DANTE HEANET conference, Athlone, 10 November.
Connect. Communicate. Collaborate VPNs in GÉANT2 Otto Kreiter, DANTE UKERNA Networkshop 34 4th - 6th April 2006.
Performance Monitoring - Internet2 Member Meeting -- Nicolas Simar Performance Monitoring Internet2 Member Meeting, Indianapolis.
Connect communicate collaborate perfSONAR MDM updates: New interface, new possibilities Domenico Vicinanza perfSONAR MDM Product Manager
Connect. Communicate. Collaborate JRA3 - Bandwidth on Demand GGF16 Athens, 14 th February 2006 Afrodite Sevasti GRNET.
InterDomain Dynamic Circuit Network Demo Joint Techs - Hawaii Jan 2008 John Vollbrecht, Internet2
Connect. Communicate. Collaborate Design and implementation issues of a multi-domain BoD-service for the NREN community Afrodite Sevasti, GRNET Workshop.
Connect. Communicate. Collaborate eduGAIN in Real Life! Ajay Daryanani, RedIRIS TERENA Networking Conference Brugge, 20th May 2008.
DataTAG Research and Technological Development for a Transatlantic Grid Abstract Several major international Grid development projects are underway at.
Connect. Communicate. Collaborate Implementing Multi-Domain Monitoring Services for European Research Networks Szymon Trocha, PSNC A. Hanemann, L. Kudarimoti,
Connect communicate collaborate GÉANT3 Services Connectivity and Monitoring Services by and for NRENs Ann Harding, SWITCH TNC 2010.
ASCR/ESnet Network Requirements an Internet2 Perspective 2009 ASCR/ESnet Network Requirements Workshop April 15/16, 2009 Richard Carlson -- Internet2.
TeraPaths TeraPaths: Establishing End-to-End QoS Paths through L2 and L3 WAN Connections Presented by Presented by Dimitrios Katramatos, BNL Dimitrios.
Connect. Communicate. Collaborate BANDWIDTH-ON-DEMAND SYSTEM CASE-STUDY BASED ON GN2 PROJECT EXPERIENCES Radosław Krzywania (speaker) PSNC Mauro Campanella.
OGF DMNR BoF Dynamic Management of Network Resources Documents available at: Guy Roberts, John Vollbrecht.
Lucy Yong Young Lee IETF CCAMP WG GMPLS Extension for Reservation and Time based Bandwidth Service.
Dynamic Lightpath Services on the Internet2 Network Rick Summerhill Director, Network Research, Architecture, Technologies, Internet2 TERENA May.
Connect. Communicate. Collaborate AMPS/ANStool interop: Automated cross-domain QoS Vangelis Haniotakis, GRnet / UoCrete TNC2007, Copenhagen, May
Building Dynamic Lightpaths in GÉANT Tangui Coulouarn, DeIC E-Infrastructure Autumn Workshop, Chiinău 8 September 2014.
Connect. Communicate. Collaborate Stitching framework for AutoBAHN Victor Reijs, HEAnet TNC2007, May 23 rd, 2007
Connect. Communicate. Collaborate AAI scenario: How AutoBAHN system will use the eduGAIN federation for Authentication and Authorization Simon Muyal,
NORDUnet Nordic Infrastructure for Research & Education Workshop Introduction - Finding the Match Lars Fischer LHCONE Workshop CERN, December 2012.
Connect. Communicate. Collaborate Operations of Multi Domain Network Services Marian Garcia Vidondo, DANTE COO TNC 2008, Bruges May.
Connect communicate collaborate LHCONE moving forward Roberto Sabatino, Mian Usman DANTE LHCONE technical workshop SARA, 1-2 December 2011.
January 16 GGF14 NMWG Chicago (June 05) Jeff Boote – Internet2 Eric Boyd - Internet2.
Internet2 Joint Techs Workshop, Feb 15, 2005, Salt Lake City, Utah ESnet On-Demand Secure Circuits and Advance Reservation System (OSCARS) Chin Guok
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Vassiliki Pouli
Connect communicate collaborate The GÉANT Multi-Domain Bandwidth-on-Demand Service: HEAnet Experience Andrew Mackarel Internet 2 Workshop April 2012.
Update on GÉANT BoD/AutoBAHN LHCONE Workshop: Networking for WLCG - CERN Tangui Coulouarn, DeIC 11 February 2013.
Connect communicate collaborate LHCONE Diagnostic & Monitoring Infrastructure Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe.
Connect communicate collaborate Connectivity Services, Autobahn and New Services Domenico Vicinanza, DANTE EGEE’09, Barcelona, 21 st -25 th September 2009.
Connect. Communicate. Collaborate NRENs on the AutoBAHN Afrodite Sevasti, GRNET Radek Krzywania, PSNC Guy Roberts, DANTE TERENA Networking Conference
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
DICE: Authorizing Dynamic Networks for VOs Jeff W. Boote Senior Network Software Engineer, Internet2 Cándido Rodríguez Montes RedIRIS TNC2009 Malaga, Spain.
1 Revision to DOE proposal Resource Optimization in Hybrid Core Networks with 100G Links Original submission: April 30, 2009 Date: May 4, 2009 PI: Malathi.
Strawman LHCONE Point to Point Experiment Plan LHCONE meeting Paris, June 17-18, 2013.
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
1 Prototype for the interoperability between FEDERICA slices and other IP domains by means of the IPsphere Framework Josep Pons Camps i2Cat.
Connect. Communicate. Collaborate educonf Coordinated support of European videoconferencing under the GN2 SA6 framework Dimitris Daskopoulos, GRNET, AUTH.
Networks ∙ Services ∙ People Mian Usman Introducing SDN capabilities in backbone GÉANT BoD Service Evolution IP Network Architect GÉANT LHCOPN/ONE.
1 | Bruno Hoeft, TNC2012 | Karlruhe Institute of Technology (KIT) Bruno Hoeft (KIT/SCC) Co-Authors: Kostas Stamos (CTI), Tangui Coulouarn (UNI-C)
©2011, NTT 1 NTT’s SC11 Demo Plan Akeo Masuda NTT Labs.
1 Network related topics Bartosz Belter, Wojbor Bogacki, Marcin Garstka, Maciej Głowiak, Radosław Krzywania, Roman Łapacz FABRIC meeting Poznań, 25 September.
BoD: an update on GÉANT NSI multi-domain guaranteed bandwidth service Tangui Coulouarn, DeIC/GÉANT 3 rd International VLBI Technology Workshop Groningen,
Policy in GÉANT Guy Roberts, Tangui Coulouarn NSI meeting, NORDUnet Conference, Uppsala, 22 Sept 2014.
Active Distributed & Dynamic Optical Network Access Systems Next Generation Access Network Łukasz Podleski (PSNC) Work in the ADDONAS project is financially.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
1 Network Measurement Challenges LHC E2E Network Research Meeting October 25 th 2006 Joe Metzger Version 1.1.
An evolutionary approach to G-MPLS ensuring a smooth migration of legacy networks Ben Martens Alcatel USA.
Bob Jones EGEE Technical Director
GÉANT Multi-Domain Bandwidth-on-Demand Service
InterDomain Dynamic Circuit Network Demo
PerfSONAR: Development Status
Integration of Network Services Interface version 2 with the JUNOS Space SDK
Network Technology Evolution
Network Technology Evolution
Presentation transcript:

Connect. Communicate. Collaborate Global On-demand Light Paths – Developing a Global Control Plane R.Krzywania PSNC A.Sevasti GRNET G.Roberts DANTE TERENA Networking Conference ‘08, Brugge, Belgium,

Connect. Communicate. Collaborate AutoBAHN is… … a research activity for engineering, automating and streamlining the inter-domain setup of guaranteed capacity (Gbps) end-to-end paths … a Joint Research Activity of the GN2 project –GN2 is an European Commission-funded project, with all the European Research and Education networks (NRENs) as partners

Connect. Communicate. Collaborate AutoBAHN approach Control and provisioning has to be distributed Business-layer related interactions include AA, policies, advance reservations etc. Privacy and control of intra-domain resources must be safeguarded

Connect. Communicate. Collaborate AutoBAHN architecture

Connect. Communicate. Collaborate AutoBAHN experiences Jun 2007 Nov 2007 Jan 2008 Apr th GN2 Workshop – AutoBAHN prototype demo SC’07 – 1 st AutoBAHN & DCN demo 5 th GN2 Workshop – Fully operable European AuoBAHN demo Internet2 Spring Meeting – Fully operable AutoBAHN & DCN demo

Connect. Communicate. Collaborate GEANT2 Workshop June 2007 Demonstration Three domains are involved: –GRNET and HEAnet interconnected through GEANT2 links AutoBAHN is in prototype phase –IDM functionality is near completed –DM functionality is emulated

Connect. Communicate. Collaborate GEANT2 Workshop June 2007 Demonstration The system assumes that it has full control over network resources within domain Domains are able to exchange abstracted resources view Inter-domain pathfinder enables searching for available resources within AutoBAHN cloud (local domain search was pre-defined manually and fixed) Reservations can be set for future execution (advance reservation feature) Single reservation requests are grouped under service instance

Connect. Communicate. Collaborate GEANT2 Workshop June 2007 Demonstration Calendar module allows to schedule reservations in advance

Connect. Communicate. Collaborate GEANT2 Workshop June 2007 Demonstration The live demonstrations of AutoBAHN have sped up the development process providing feedback to the development. It opens NRENs for cooperation, so that important input of requirements and suggestions could be taken into consideration The number of NRENs involved in test and demonstration environment is increased More NRENs declares its interest to join the AutoBAHN cloud Reservation time can not be easily estimated. The highest delay is introduced by Alcatel NMS and associated domain resource management tool (up to 4 minutes).

Connect. Communicate. Collaborate GEANT2 Workshop June 2007 Demonstration Lessons learned –The DM implementation is strongly dependant on local domain network management model and procedures –The DM needs to be extended with dedicated tools to collaborate with existing management applications used within domains –Exceptional situations were encountered during testing, and preventing/reacting actions must be defined and implemented –Network configuration time depends on domain technology and capabilities (e.g. NMS efficiency) and must not be ignored

Connect. Communicate. Collaborate GEANT2 Workshop June 2007 Demonstration

Connect. Communicate. Collaborate AutoBAHN experiences Jun 2007 Nov 2007 Jan 2008 Apr th GN2 Workshop – AutoBAHN prototype demo SC’07 – 1 st AutoBAHN & DCN demo 5 th GN2 Workshop – Fully operable European AuoBAHN demo Internet2 Spring Meeting – Fully operable AutoBAHN & DCN demo

Connect. Communicate. Collaborate SuperComputing’07 demonstration On November 2007 AutoBAHN is presented on SuperComputing’07 event European test environment is interconnected with USA part Dedicated IDC protocol is defined and implemented to assure interoperability of AutoBAHN and DCN systems

Connect. Communicate. Collaborate SuperComputing’07 demonstration

Connect. Communicate. Collaborate SuperComputing’07 demonstration 4 European domains involved Attempt to collaborate with alternative system Attempt to automatically connect two continents Phoebus infrastructure deployment Cyclic durability test

Connect. Communicate. Collaborate SuperComputing’07 demonstration IDM is improved and enhanced with IDC capability DM is implemented and enable control of network resources (with assist of domain dedicated tools) Deployment of domain resource management tools in all involved NRENs in Europe – GRNET, HEAnet, and PSNC/PIONIER, DANTE/GEANT2 The interoperability with ESNet and Internet2 clouds is enabled Phoebus infrastructure is deployed as a client for BoD systems

Connect. Communicate. Collaborate SuperComputing’07 demonstration IDC protocol –Defined by AutoBAHN and DCN team to enable interoperability of BoD systems –Web Services based messages exchange –Contains: Topology exchange details Reservation related requests/responses –Scheduling –Signalling

Connect. Communicate. Collaborate SuperComputing’07 demonstration IDC protocol – Topology elements –Minimal set of toplogy exchange elements Domains Nodes Ports Links –Domain privacy and policy Only the abstracted topologies are available to public and is exchanged between systems Real data (interface names, etc.) may be hidden or missing depending on abstraction level and policy

Connect. Communicate. Collaborate SuperComputing’07 demonstration

Connect. Communicate. Collaborate IDC protocol – Path definitions SuperComputing’07 demonstration SRC and DST points only SRC and DST with some intermediate points All points on the path

Connect. Communicate. Collaborate SuperComputing’07 demonstration Synchronous vs. Asynchronous communication model for inter-domain connections –AutoBAHN implements asynchronous communication as communication delays and resource processing can not be arbitrary defined –DCN implements synchronous communication, which leaded to waiting for request responses between Europe and USA –The reservation time in Europe requires all resources to be configured and put into operational state, which may take up to 4 minutes. –DCN may consider timeouts and reservation failures if response waiting periods were defined too short.

Connect. Communicate. Collaborate AutoBAHN experiences Jun 2007 Nov 2007 Jan 2008 Apr th GN2 Workshop – AutoBAHN prototype demo SC’07 – 1 st AutoBAHN & DCN demo 5 th GN2 Workshop – Fully operable European AuoBAHN demo Internet2 Spring Meeting – Fully operable AutoBAHN & DCN demo

Connect. Communicate. Collaborate Demonstration on GEANT2 Workshop January 2008 Multiple parallel connections between end points was supported by data plane Domains resource management is fully automated and performed without administrator attention

Connect. Communicate. Collaborate Demonstration on GEANT2 Workshop January 2008

Connect. Communicate. Collaborate GEANT2 Workshop Jan’08 Lessons learnt Domains are not keen to show too much details of their topology. In some cases it should be limited just to domain edge points (Ingress/egress points and links to clients) MPLS domains topology is seen as a cloud, and limited management capabilities are supported through available NMS’

Connect. Communicate. Collaborate GEANT2 Workshop Jan’08 Lessons learnt Alcatel NMS do not allow easily to control the resources at very low level Issues with usage of local NMS pathfinding for advance reservation (pathfinding is done with current state, as no calendar is available)

Connect. Communicate. Collaborate GEANT2 Workshop Jan’08 Lessons learnt That leads to modification of initial AutoBAHN assumption of having explicit and full control over network resources –Domains may be represented in very simplified way (abstraction process), even as a single node –NMS may be considered to have „unlimited” resources and control resources basing more on policy, rather than tracking network status –Abstraction process should be modified and new methods of resource management at DM level must be introduced

Connect. Communicate. Collaborate AutoBAHN experiences Jun 2007 Nov 2007 Jan 2008 Apr th GN2 Workshop – AutoBAHN prototype demo SC’07 – 1 st AutoBAHN & DCN demo 5 th GN2 Workshop – Fully operable European AuoBAHN demo Internet2 Spring Meeting – Fully operable AutoBAHN & DCN demo

Connect. Communicate. Collaborate Internet2 Spring Meeting 2008 demonstration

Connect. Communicate. Collaborate Internet2 Spring Meeting 2008 demonstration

Connect. Communicate. Collaborate Internet2 Spring Meeting 2008 demonstration IDC protocol improvements in features and stability Hazard situations are limited and IDM/DM stack handles most failure situations Phoebus infrastructure is used to request circuits and generate traffic QinQ support due to Phoebus requirements Constant, long term durability testing on automated circuit set up and tear down 7 domains involved on European site: CARNet, CESNET, GARR, GEANT2, GRNET, HEAnet, PIONIER

Connect. Communicate. Collaborate Internet2 Spring Meeting 2008 demonstration – Lessons Learnt Reservation states incompatibility –SCHEDULED state is missing in DCN design. New features are requested for IDC functionality –Modify reservation –Find possible reservation time

Connect. Communicate. Collaborate The AutoBAHN team

Connect. Communicate. Collaborate Global On-demand Light Paths – Developing a Global Control Plane Thank you Please visit: