Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.

Slides:



Advertisements
Similar presentations
What is the ISOLDE cooler RFQ CB - ISCOOL H. Frånberg.
Advertisements

ISOLDE WS 2007 Results with ISCOOL a new Radio Frequency Quadrupole Cooler and Buncher at ISOLDE P. Delahaye, H. Frånberg, AB-OP-PSB, ISCOOL, COLLAPS,
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Possibility for the production and study of heavy neutron-rich nuclei formed in multi-nucleon transfer reactions proposal for a new project at FLNR V.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
ALTO Laser Ion Source Ruohong Li, Serge Franchoo, Christophe Lau LA 3 NET Feb 22, 2013.
On-line tests RFQ cooler ISCOOL A quick summary P. Delahaye, H. Frånberg, I. Podadera ISCOOL, COLLAPS, ISOLDE collaboration.
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
Mats Lindroos Technical report Mats Lindroos on behalf of The ISOLDE team.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Enhancement of the Resonance Ionization Laser Ion Source (RILIS) at ISOLDE - Setting up a complementary all solid-state laser system Sebastian Rothe Gentner.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Oliver Kester I3 EURONS EURONS, EURISOL-DS Town Meeting, Helsinki, Finland, Sept Advanced charge state breeding Objectives: To optimize the charge.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
A new RFQ cooler: concept, simulations and status Trapped Radioactive Isotopes:  icro-laboratories for Fundamental Physics E. Traykov TRI  P project.
A mass-purification method for REX beams
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
The HIE-ISOLDE Faraday Cup
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Pekka Suominen 2010 CERN Plasma ion sources for radioactive molecular ion beams.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Mats Lindroos REX, ISOLDE and off-line controls Mats Lindroos on behalf of the ISOLDE team.
Design and Development of a Trochoidal Mass Separator at the Berkeley Gas-filled Separator J.M. Gates, K.E. Gregorich, G.K. Pang, N.E. Esker and H. Nitsche.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
January 30, 2007 CERN Resonant laser ion sources By V. Fedosseev.
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Technical Report for ISOLDE
A “standard” ISOLDE target: ThO2-184, n-rich Cu
Status of the Front End Test Stand April 2007.
Target and Horn status report
FEBIAD ion source development efficiency improvement
Alexander Herlert, CERN (PH-SME-IS)
Introduction to ISOLDE RFQ
A. Herlert, CERN PH-SME-IS
ISOLDE Technical report for INTC 21/5/2007
V. Fedosseev, R. Losito AB/ATB/LPE ISCC, 31/10/2005
Technical Report ISCC Meeting 16th February 2009
Magdalena Kowalska, CERN PH-SME-IS
Technical report for ISOLDE INTC 19 May 2007
Technical Report for ISOLDE
INTC September 2002 ISOLDE Mats Lindroos Mats Lindroos.
Mats Lindroos for The ISOLDE team
Technical report Mats Lindroos.
A. Herlert, CERN PH-SME-IS
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
Presentation transcript:

Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Outline Shutdown work R&D priority list from upgrade group R&D work at ISOLDE Start-up with new control system REX integration, R&D and operation Technical support for ISOLDE experimental area Towards the future

Shutdown Smooth shutdown with repair (and re- installation) of GPS front-end completed Major “un-scheduled” power cut during start-up phase –ISOLDE facility “survived” –Major additional work for ISOLTRAP Broken computers –New emergency power-cut procedures in the process of being established

R&D priority list ISOLDE upgrade group has established a priority list for ISOLDE R&D – upgrade.web.cern.ch/is olde-upgrade/

Priority 1

ATB-IF R&D P-induced shock waves recorded on Ta, Pb (10 mm diameter cylinders) and CNGS shape Graphite targets. Perpendicular velocity measured every 200 ns, total movement ~30 microns. (Analysis on-going). Laser induced cavitations in Water jet were measured, (Analysis on-going). Systematic off-line target tests were extended to emittance measurements and stable mass-scan analysis (test results available on the web). To ease stable beam exercise of surface ion-sources a mass-marker will be systematically added. Off-line test of a solid state laser RILIS under way, emittance and absolute ionisation efficiency. (Kim, Thomas, Klaus & ATB-IF) Front-end 6 being assembled (completion end of June) extended stable beam tests are foreseen (sept). Pre-study of target vessels, ion-sources feed trough and connectors for 10 micro A beam started. The emitance of a standard LaB6 negative surface ion-source was measured as a fuction of the electron suppression

AB-OP ECR source modified and commissioned for 2004 run –RF generator fault prevented Ar tests in April RFQ cooler design completed –Fabrication of main vacuum vessel in Mainz –Discussion with LMU for fabrication of remianing pieces –Off-line source from MISTRAL mounted in building 275 (with faraday cage) for tests –Grant application in UK (Manchester) for power suuplies, RF generator and Vacuum system

1. Laser Beam Control On-line control of laser beam positioning using CCD cameras: “Laser Imager” program is available in the new Linux-based control system Image of UV beam at the CCD camera Shutdown : RILIS Development

2. New ionization schemes a.Dysprosium Step 1 –  = nm – scanned Step 2 – 2 = nm – scanned Step 3 – 3 =510.6 & nm (CVL) - fixed b. Yttrium Step 1 –  = nm (2  ) – scanned Step 2 – 2 = nm – scanned Step 3 – 3 = nm (CVL) - fixed RILIS efficiency = ~ 20% RILIS efficiency = 80 x surface ion source efficiency Optimal ionization schemes nm nm nm Ei=6.22 eV nm nm Ei=5.94 eV Dy Y nm nm Shutdown : RILIS Development

REX-ISOLDE All REX posts allocated Work package plan for Operation, maintenance and R&D established Working group (AB management) to follow full implementation of REX as a CERN facility Migration of FEC from W95 to XP –Agreement made for CO post Shutdown work completed –R&D on molecular beams, good results for SeCO and AlF R&D on cooling in REX trap –Hardware upgrade of EBIS (baking system, realignment, interlocks etc) –Mass separator - new beam diagnostic boxes –Commissioning of 9 gap IH structure New ideas for further upgrade being discussed

Beam preparation with REX-TRAP Dipolar ExcitationQuadrupolar excitation Rotating Wall cooling (Investigated method) B Cooling method tests Lorentz force is compressing the ion cloud Sideband cooling (actual method) buffer gas buffer gas +  c quadrupolar rf field in the transversal plane  c = q/m B EE Accumulation CoolingEjection Cooling by buffer gas collisions mbar Ne P. Delahaye

Charge exchange process 40 Ar + ions Sideband excitation 78 Kr + ions 130 Xe + ions Of interest for the « ion catcher » devices Cooling by buffer gas collisions mbar Ne Molecule cooling for contaminants free beams SeCO +, and AlF + molecular beams tested SnS + to be tested P. Delahaye

TOF SeCO

New control system New LINUX/JAVA based control system commissioned for ISOLDE –Scanners and wire grids still running under windows on dedicated consoles W95->WXP Please check USERS applications for XP compatibility For “introduction” and feed-back please contact Tim Giles

New controls

Technical support at ISOLDE Re-organization of technical support for ISOLDE in progress –Experimental area section in ATB group and new OP EIC post –Work package plan for all technical support for operation, maintenance and R&D in the experimental area established –More at next meeting…

Towards the future… Tendering in progress for hall extension –Building start July 2004 –Work on hall partition (with dust barrier) from 1 January to 15 March 2005 Class A lab under construction –Work on partition 15 November to 15 February 2005