HARDWARE AND PLANNING ISSUES. OBJECTIVES At the end of this lesson the learner should be able to: 1.Explain the need for hardware compatibility 2.Discuss.

Slides:



Advertisements
Similar presentations
Revision of Cognitive and Experimental Psychology.
Advertisements

Chapter 3: Software Basics Section I: Preparing to Use Technology.
Bringing Visibility and Control to Your Operations.
 History  What do we provide  Design Goals  Benefits  Future.
VMWare to Hyper-V FOR SERVER What we looked at before migration  Performance – Hyper-V performs at near native speeds.  OS Compatibility – Hyper-V.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
 Best Practices  Management of content within Blackboard  Content creation / Modification  Training options and Self-help  Blackboard 8 Update – Dr.
ROI. Retail$49.99 Wholesale$39.00 Hardware license($7.00) Manufacturing, packaging, manual($3.00) Distribution costs($0.50) Net revenue per unit$28.50.
System Development Life Cycle (SDLC)
Lesson 13 – ALL ABOUT CLIENT COMPUTERS. Choosing desktop computers Understanding Network workstation requirements OVERVIEW.
The most exceptional English training software in the world ELLIS.
Chapter 13 Organizing Information System Resources MIS Department Centralization and Decentralization Outsourcing Computer Facilities and Services.
GDP/10e Quick File Online Keyboarding Orientation.
IT Applications Theory Slideshows By Mark Kelly Vceit.com Types and contents of On-screen user documentation.
Case Study - Scenario 1 Austin School is one of six high schools catering for students aged between 11 and 16 years of age. Parents can select any one.
Bringing Visibility and Control to Your Operations.
Different Perspectives The Ferl Practitioners’ Programme Transforming Teaching and Learning with ILT X4.5.
Ch. 8 StudyCast SarahBeth Walker. Software Selection  Software does the critical work in the classroom.  Mindtools  Support for conversation/community.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
IHRIS: Open Source Health Workforce Information Systems Pilot Project Name Event Location - Date.
Capabilities of Software. Object Linking & Embedding (OLE) OLE allows information to be shared between different programs For example, a spreadsheet created.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Instrumentation ModelKit is released in the following editions: 1) 2) 3) 4)
SIGNAMAX WARRANTY SYSTEM. Signamax Warranty Types Signamax Connectivity Systems offers its customers a versatile system of component and system warranties.
Database Walkthrough Kate Dickens. Question Flexibility  For tutors  Questions, answers, feedback, notes for tutor  For students  Questions only or.
Everyone Learns Differently An instructor must be able to adapt to students’ personality type and learning style.
Technological-Educational Network of Extremadura CHS 2004 ANTONIO GUILLEN FRANCISCO MARTINEZ.
On-screen user documentation. Contents What qualifies as ‘onscreen’? Pros and Cons: onscreen vs printed Types – Quick-start guide – Tutorial – Content-sensitive.
Supporting Information Products On-screen User Documentation Key Word: QUIRTHW.
LESSON 7.4 & 7.5 OBJECTIVES BONDS. AFTER STUDYING THIS LESSON YOU WILL BE ABLE TO DO THE FOLLOWING: CALCULATE MARKET PRICE OF BONDS CALCULATE THE TOTAL.
1 Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Toolooa SHS BYOD Parent Information Night. Why is BYOD (Bring Your Own Device)happening? The current hire devices were Federally funded and the funding.
CEG 2400 FALL 2012 Windows Servers Network Operating Systems.
What is the reason for installing hardware – P1 By Ridjauhn Ryan.
Lesson Objectives To understand why computer systems must be reliable To investigate the consequences of an unreliable system.
Allen Wilson, President Our Success Our Services Home Theater Products How to Find Us.
How do I get a copy of my purchased Malwarebytes license? How do I use my license for Malwarebytes Antivirus to activate SecureLine How do Get Malwarebytes.
Browser Technical Support Helpline Number (USA)
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
System Design, Implementation and Review
Epson Printer Customer Support Number
Chapter 2 Introduction to Computer User Support
The .NET Dashboard Suite is delivered in the following editions:
System Development Life Cycle (SDLC)
User Focus IB Computer Science.
Technical Guidance to Fix the Canon Printer E5 Error Message
If you are not able to implement the solutions offered by tutorial both written and video, you can contact quicken customer support team. You can get plenty.
System Development Life Cycle (SDLC)

Hp Printer installation and update tech support phone number for online troubleshooting service to get update support and drivers support. Hp Printer quick.
QuickBooks Technical Support
Canon Printer Customer Service Number Assists You
Quicken Technical Support Visit :-
DLINK TECHNICAL SUPPORT HELPLINE DLINK TECH SUPPORT
Canon Printer Support Number
Quicken Technical Support Phone Number
Canon Printer Support Issue We Care For Toll free no We Offer Instant And Reliable Information To Dilute Your Canon Printer Issues 2.We.
Toll free
Brother Printer Technical Support Number
Quicken Toll-Free Number Quicken Help Number
Quicken Customer Support 24*7. Quicken Customer Service Number.
HP Printer Support Number- Error with Wireless Connection
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Chapter 13 Circles and Area
System Development Life Cycle (SDLC)
Chapter 8: Managing Media
Factors affecting upgrading or installing systems
DIMETRA™ EXPRESS SYSTEM SERVICES
Feasibility Report.
Presentation transcript:

HARDWARE AND PLANNING ISSUES

OBJECTIVES At the end of this lesson the learner should be able to: 1.Explain the need for hardware compatibility 2.Discuss the issue of product licensing 3.Discuss the importance of the need for availability of technical support when purchasing resources. 4.Discuss the importance of cost as a factor in selecting resources

Hardware And Planning Issues Hardware’s compatibility with the resource Reliable and regular access of instructors to necessary equipment Licensing

Available Support for Resources Helpline Free support Built-in tutorials Manufacturer training On-screen help Printed manual to support installation and use of the product Lifespan of the product Updates

Flexibility of Use Ease of Creation and Distribution How quickly can the materials be adapted? Reusability

Cost Developing vs. Purchasing the Technology Network One-off outlay vs. recurrent charge Helpline Free support Built-in tutorials Manufacturer training On-screen help Printed manual to support installation and use of the product Lifespan of the product Updates