Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
1 Framing Regulatory and Government Policy India Energy Mart 2004 New Delhi S L Rao.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
TSO Comparison Group : An Overview
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Hon’able Members of Standing Committee on Energy WELCOMES POWER GRID CORP. OF INDIA LTD.
by : by : Power Grid Corporation of India Ltd POWERGRID AT A GLANCE Central Transmission Utility of India & Operator of RLDCs. (TSO) One of the largest.
Electric Entities: New Models
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
Consultancy by : Power Grid Corporation of India Ltd.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
1 ELECTRIC POWER POOLS ………more slides. 2 DEVELOPMENT OF NORDPOOL 1996.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
POWER GRID CORP. OF INDIA LTD. Dr. Montek Singh Ahluwalia
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
WELCOME TO CIGRE MEMBERS
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Electric Entities: New Models Sh. R.P. Singh CHAIRMAN & MANAGING DIRECTOR POWER GRID CORPORATION OF INDIA LIMITED.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Overall National Grid Development: Constraints & Options
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Open Access.
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Economic Operation of Power Systems
EU-IPA12/CS02 Development of the Renewable Energy Sector
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
RE Grid Integration Study with India
Presentation transcript:

Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.

2 Generation :: Heart RLDC::Brain Sub-Transmission :: Sub-Arteries Transmission :: Main Arteries Distribution :: Capillaries An Analogy – Power System & Human Body USER

POWERGRID Establishment and operation of Regional and National Power Grids to facilitate transfer of power within and across the Regions with reliability, security and economy on sound commercial principles MISSION

POWERGRID -An Overview A neutral transmission service provider.  Started Commercial Operations from  Wheels 45,000 MW i.e. more than 40% of the power generated.  Operates and Maintains  50,000 circuit kms of EHV transmission System  82 nos of EHVAC & HVDC sub-stations With System Availability over 99.5%.

Growth of POWERGRID TRANSFORMER CAPACITY (MVA)GROSS FIXED ASSET (RS. CRORES) TURNOVER AND NET PROFIT MANPOWER * REVICED CERC TARIFF NORMS MANPOWER TRANSFERRED FROM CEA

Efforts made by POWERGRID to Stabilize and Commercialize Power Sector Establishment of National Grid Modernisation of RLDCs Introduction of Availability Based Tariff Mechanism to both Generators and Consumers Manning of RLDCs by Senior Level Personnel Introduction of “ Open Access ”

Formation of National Grid Present Capacity 9,000 MW Future Capacity –30,000MW by 2012 Investment Required by 2012 :Rs. 71,000 Crores By POWERGRID :Rs. 51,000 Crore By Pvt. Investors:Rs.20,000 Crores –This investment will also take care evacuation of Central Sector Share of generation planned till –Creation of National Grid of 30,000 MW Capacity will lead to reduction in Capacity addition of 13,000MW i.e. saving of Rs. 50,000 Crore in investments besides fuel cost saving. ………a continuous process

Need for Strong National Grid Generation resources in pockets and remote Load Centres dispersed and distant Multiple Loops and Rings desirable to ensure –Safety, Security and Reliability Demand fluctuations on daily/ seasonal variationDemand fluctuations on daily/ seasonal variation Economy of Operations Reduction in generation reserves

Derived economics of National Grid Merit Order –Pit head stations PLF increasedPit head stations PLF increased –Costly Generation - Boxed up /reducedCostly Generation –Exchange of 18,500 MUs in equivalent to Generating Station of 3000 MW Capacity –Estimated National Saving – Rs. 12,000 Crores in fresh investments –Rs. 1,850 Crores in fuel cost –Additional Saving in Fuel Transportation Expected exchanges in ….. MUs Hydro plant usage– a paradigm shift Importance of Pumped Storage Plants achieved Harnessing of the diversity in occurrence of the Peak Demand amongst Regions, thus peak load flattenedHarnessing of the diversity in occurrence of the Peak Demand amongst Regions

Inter-Regional Exchanges

Modernisation of RLDC/SLDCs by POWERGRID RegionTaken Over from CEA ULDC Commissioning Southern Northern North-Eastern Eastern June 2005* Western March 2006* * Scheduled Target Unified Approach - Features - HierarchicalFeatures State of Art Load Despatch Centres at Regional and State/Area Level.

RTU SUB LDC SLDC ERLDC WRLDCNRLDCSRLDCNERLDC NLDC 23 Nos. 51 Nos Nos. Grid Operation Hierarchy Plant/Sub Station Level Group of Distt. Level State HQ Level Region Level National Level 5 Nos.

AVAILABILITY BASED TARIFF (ABT) Spearheaded by POWERGRID Features:  Unique commercial mechanism linked with frequency  Fixed Charges i.e. Capacity charges  As per Plant Availability.  Variable Charges i.e. Energy charges  As per Schedule.  Unscheduled Interchange(UI) i.e. deviations from schedule ( Schedule – Actual) Unscheduled Interchange(UI) i.e. deviations from schedule ( Schedule – Actual)  Price as per prevailing system frequency Typical Schedule & Drawal

Achievements –Implemented between July 2002 and Nov.’2003 –Improved quality of supply.. –Unutilised capacity harnessed-Pumped StorageUnutilised capacity harnessed –Merit order Operation. – Grid discipline –Emphasis on load forecasting –Discourage overdrawals during low frequency –Facilitate bi-lateral trading –Maximisation of generation availability AVAILABILITY BASED TARIFF

Grid Status – Before formation of National Grid, Modernisation of RLDCs and introduction of ABT Large Frequency fluctuations  48.0Hz to 52 Hz. Low Voltages  400kV going down upto 300kV Frequent Grid Disturbances Sub-Optimal Operation High Technical loss Grid Operation on fire fighting instead of Optimisation & Economy

Open Access in inter-State Transmission Guidelines formulated by POWERGRID in consultation with CERC and implemented w.e.f. May’2004 Non- discriminatory / Transparent Process Freedom to buy/sell power Efficient Market Mechanism to address supply / demand mismatches Encourage investment in Transmission Overwhelming response – –More than 200 additional transactions effected from May’04 till Aug.’04 –5300 MUs transacted through Open Access besides unscheduled interchanges

Short Term Open Access– (upto 1 year usage) –Trading of surpluses –Subject to inherent design margins, margin available due to variation in power flow, in-built spare capacity available –Economically priced ( ¼ th of long term transmission charges) –Reliable settlement system Long Term Open Access– ( >25 year usage) –Covers allocations from Central Generating Stations –Long term contracts –Subject to System Studies and transmission planning criteria for augmentation/ new transmission Schemes –Higher Priority over Short Term Open Access MARKET DESIGN

Market Design… UI – Spot Market –Unscheduled exchanges with the pool. –No trader involved –Price linked to system frequency which is displayed on the users screen –Robust settlement system –No vested interest of POWERGRID Trading Long / Short term directly or through trader under bilateral contracts. Spot trading through UI.

International Practices Two Models –TSO (Transmission System Operator) responsible for Transmission and System development and Operation. Being practiced in U.K., South Africa,France, Malaysia, Korea & other European countries –ISO (Independent System Operator)ISO (Independent System Operator) Being practiced in USA, Germany, Spain on co- operative approach –Transmission with multiple agencies –USA now shifting towards TSO –Canada mix of TSO & ISO –China : TSO + Generation

CHALLENGES Right of Way becoming increasingly difficult on account of –Forest Clearance –Tree Cutting –Reduction of Land Value Being addressed as under: –Design of Compact Tower & Tall Towers as per need –Uprating & Upgrading of existing Transmission lines through Use of High Temperature Conductors Use of Series Capacitors with/without Thyristor Control Conversion from low voltage to high voltage Law & Order –J&K,NER, Telangana, Bihar Poor Health of SEBs – Commercial mechanism in force Demand Supply Gap- threatens the Grid Stability Private sector investment Time consuming process for project approval

Few Suggestions ……………………… to rejuvenate Power Sector.? Institution Building Network expansion –Transmission –Sub. Transmission –Distribution Augmentation of Load Despatch & Communication in distribution leading to –Transparency and Trust Building at all levels Distributed Generation Introduction of intra-State ABT Open Access in Intra State Transmission & Distribution Flattening of Load Curve leading to –Economic power supply to agriculture in odd hours Creation of robust market mechanism

POWERGRID, INDIA

Grid Incidences

Load Curve of Northern Region for LOAD FREQUENCY Load variation of 9000 to MW Frequency variation of 48.3 Hz to 51.5 Hz

Frequency Profile of SR

Frequency Profile of ER FREQUENCY CURVE 6th June02 6th June Time (Hrs.) Frqe (Hz.)

765 KV RING MAIN SYSTEM THE POWER ‘HIGHWAY’ CHEAP HYDRO POWER FROM THE NORTH-EAST AND PIT HEAD THERMAL POWER FROM THE EAST ENTERS THE RING AND EXITS TO POWER STARVED REGIONS

Utility % PLF % PLF % increase DVC Orissa WBPDCL55562 CESC68725 DPL NTPC Region52568 Generation PLF (Thermal) ER

MERIT ORDER : UNITS BOXED UP POWER STATIONSTATE CAPACITY(M W) FUEL VARIABLE COST TATA DIESELKARNATAKA 79 DIESEL308 RAYALSEEMA DGPPKARNATAKA 27 DIESEL360 YELEHANKA DIESELKARNATAKA 128 DIESEL314 THANRBHAVIKARNATAKA 220 NAPTHA325 SUB-TOTAL 454 BRAHAMPURAM DPPKERALA 107 DIESEL275 BSESKERALA 157 NAPTHA308 KASARGODE PCLKERALA 22 NAPTHA298 KAYAMKULAMKERALA 360 NAPTHA322 SUB-TOTAL 646 BASIN BRIDGETAMIL NADU 120 NAPTHA584 P.P.NALLURTAMIL NADU 330 NAPTHA415 SUB-TOTAL 450 TOTAL 1550

ULDC-THE EYES AND EARS OF THE SYSTEM OPERATOR All constituents get the same data in real time. –Transparency & Synergy in operation. Quantum leap in visibility to operator. –Increased confidence & Focus on security and economy. Premptive, dynamic “early warning” systems. Grid less vulnerable to disturbances. Accurate and easy analysis of grid incidents Faster restoration after perturbation Comprehensive energy management system functions. –Contingency evaluation, Security assessment and State Estimation

UI RATE Rate of Unscheduled Drawal/Injection Frequency (Hz)Rate (p/u) Above and below570.00

KADAMPARAI PUMP OPERATION GENERATOR MODE PUMP SAVINGS OF RS 40 LAKHS EVERY DAY INVESTMENT OF 1600 CRORES SAVED

NER peak 5:30 pm ER Peak 6:00 pm WR Peak 6:45 pm Diversity of peaks

Schedule Vs Actual Injection at Dadri (T)

Schedule Vs Actual Drawal by UP

EUROPEAN & SOUTH AFRICAN MODEL GGG DDD T + SO G D G D This model is followed in UK by NGC, in Norway by Statenett, in Sweden by Svenska Kraftnet, in Finland by Fingrid, in Netherland by Tennet, in Denmark by Eltral/Elkrafts and in South Africa by Eskom.

AMERICAN MODEL GGG DDD TT G D G D G D TSO RTORTO This model is followed in USA. Based on their experience, USA is now moving towards TSO model through RTO.

REALITY BITE: FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!. EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED! COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES IMPROVEMENT IN VOLTAGE

13450 MW 1000 MW 6450 MW 4600 MW 1300 MW 3200 MW 30,000 MW OF INTER- REGIONAL POWER BY 2012 EASTERN REGION SOUTHERN REGION WESTERN REGION NORTHERN REGION NORTH- EASTERN REGION INTER-REGIONAL TRANSFER BY 2012

Inter Regional Links Present IR Capacity = 9,000 MW 700 MW 1200MW 2000MW 900 MW 30,500 MW 16,000 32,700 MW 30,500 MW MW 1650 MW

Major inter-Regional Link Inter-Regional LinkProject Cost (Rs. in Crores) Commissioning Date ApprovedActualScheduledActual TALCHER – KOLAR (2000 MW) ER-SR June’03Dec.’02 RAIPUR-ROURKELA (1000 MW) ER-WR Dec.’03Jan.’03 SASARAM-HVDC (500 MW) ER-NR Dec.’01June’01

Technical Losses w.r.t. Voltage Power (P)= Voltage * Current = V*I Losses = (Current) 2 * Resistance = I 2 *R Power is proportional to current, voltage remaining constant. To draw the same power at low voltage, one has to draw more current e.g.; 100 MW = 400kV * 250 Amps 100 MW = 320kV * 312 Amps Losses increases by 55% for 20%reduction in voltage. Losses doubles for about 30% reduction in voltage. e.g. Loss reduction in SR by 1% has given an annual saving of about Rs 290 crores

INDIAN POWER SECTOR - AT A GLANCE REGIONINSTALLED CAPACITY (MW) ENERGY CONSUMPTION MUs/day PEAK DEMAND MET(MW) NORTHERN30, ,000 EASTERN17, ,000 WESTERN32, ,000 SOUTHERN29, ,000 NORTH EAST2,334251,100 TOTAL112,0582,00078,000