1 DECam in Chile Intro to Dark Energy Survey & DECam Project Status of arrivals in Chile Instrument checkout in Chile Schedule for first light.

Slides:



Advertisements
Similar presentations
Welcome to the University of Michigan – Dearborn Observatory Founded 2007.
Advertisements

Brenna Flaugher Sept. 26, The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics 1.4 Optics 1.5.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
The Dark Energy Survey The Big Questions The Discovery of Dark Energy The Dark Energy Survey – The telescope – The camera – The science Expected Results.
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
1 Progress for August 3, 2011 The boat shipment with the prime focus cage, cage cart, imager handling system etc … arrived on the mountain top this morning.
1 July 8, 2011 Boxes were moved between ground floor and console room floor. –Safety equipment and supplies identified and unpacked. –LN2 tank was unpacked.
The National Science Foundation The Dark Energy Survey J. Frieman, M. Becker, J. Carlstrom, M. Gladders, W. Hu, R. Kessler, B. Koester, A. Kravtsov, for.
An Introduction to mini-SONG Project Xiaojun Jiang Natioanl Astronomical Observatories Chinese Academy of Sciences.
1 Progress for July 29, 2011 This morning Klaus and Tom programmed the IP addresses into the Hexapod. That worked. Left: sunrise today Right: Klaus’s Office.
Probing The Dark Universe Josh Frieman Fermilab & The University of Chicago Link to Learn, May, 2011.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
The Photometric Calibration of the Dark Energy Survey D. L. Tucker 1, S. S. Allam 1, J. T. Annis 1, R. Armstrong 2, J. P. Bernstein 3, E. Bertin 4, D.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
Construction of the Dark Energy Camera Brenna Flaugher, DECam Project Manager CTIO Nov John Peoples (1 st DES Director ) Symmetry Magazine.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
1 B. Flaugher P5 April 2006 The Dark Energy Survey From Scientific Goals to Science Quality Data Brenna Flaugher Fermilab April 2006 P5 Meeting.
Radiation & Telescopes ____________ radiation: Transmission of energy through space without physical connection through varying electric and magnetic fields.
Andy Stefanik 1July 2006 Mechanical Overview WBS 1.5 Opto-Mechanical System Andy Stefanik - Fermilab.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
Each 6” wafer contains: four 2k×4k, one 2k × 2k, eight 512 × 1k Follows SNAP model: Foundry performs first 8 steps on 650  m high resistivity wafers (10.
Utah Telescope Site Selection 2008 D. Kieda, S. Lebohec, W. Springer, P. Gondolo, K. Martens, P. Gondolo, P. Ricketts, C. Zimmer University of Utah.
“Twinkle, Twinkle Little Star”: An Introduction to Adaptive Optics Mt. Hamilton Visitor’s Night July 28, 2001.
Telescope Integration and Tests Tuesday Afternoon.
THE DARK ENERGY SURVEY Science Goals: Perform a 5000 sq. deg. survey of the southern galactic cap Map the cosmological density field to z=1 Constrain the.
Brenna Flaugher Dark Energy Symposium StSci May The Dark Energy Survey (DES) Proposal: –Perform a 5000 sq. deg. survey of the southern galactic.
Each 6” wafer contains: 4 2k×4k, 1 2k × 2k, & × 1k Follows SNAP model: Foundry performs first 8 steps on 650  m high resistivity wafers (10 kohm-cm)
Dark Energy Probes with DES (focus on cosmology) Seokcheon Lee (KIAS) Feb Section : Survey Science III.
Brenna Flaugher FRA Oct Dark Energy Survey (DES) Motivation Dark Energy is the dominant constituent of the Universe Dark Matter is next 95% of.
Brenna Flaugher DES presentation to the Fermilab PAC Nov. 12, 2004 Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 DES Technical Progress, Cost and.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Astronomy 1010-H Planetary Astronomy Fall_2015 Day-19.
Astronomical Instrumentation at Texas A&M Jennifer Marshall Darren DePoy.
Dark Energy Survey Status John Peoples Presentation to the Fermilab PAC 6 March 2009.
The Photometric Calibration of the Dark Energy Survey D. L. Tucker 1, S. S. Allam 1, J. T. Annis 1, R. Armstrong 2, J. P. Bernstein 3, E. Bertin 4, D.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
The Dark Energy Survey The Big Questions The Discovery of Dark Energy
Calibration of the LSST Camera Andy Scacco. LSST Basics Ground based 8.4m triple mirror design Mountaintop in N. Chile Wide 3.5 degree field survey telescope.
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
Brenna Flaugher Fermilab What we can learn from the Cosmos.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 Progress for July 16, 2011 We woke up to 9+ inches of new heavy snow.
Binospec - Next Generation Optical Spectrograph for the MMT
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Lec2 Mapping Structure (Frieman)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Brenna Flaugher for the DES Collaboration; DPF Meeting August 27, 2004 Riverside,CA Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 Dark Energy and.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Oct. 19, 2006V. Scarpine1 DES Posters to AAS 2007, Seattle 1.Brenna Flaugher – “The Dark Energy Survey instrument” 2.Tom Diehl – “Characterization and.
1 Progress for July 18, 2011 Morning Safety Meeting was held in the Control Room today. Tom & Herman worked with Jim Hughes (remotely) and made a temporary.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
Brenna Flaugher FNAL All Experimenters Meeting June Dark Energy Survey Motivation Dark Energy is the dominant constituent of the Universe Dark Matter.
Seeing the Invisible: Observing the Dark Side of the Universe Sarah Bridle University College London.
Alistair Walker - DECam Instrument Scientist Tim Abbott – Blanco Telescope Scientist CTIO/NOAO DES Collaboration Meeting Oct The Blanco Telescope.
1 Progress for July 19, 2011 Preparations for Fill. –4 protection valves were attached: 2 on Z-shaped tubes, 2 on the tank –Herman’s new CTIO engineering.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Alistair Walker Version 3 December
DECam Filter/Shutter Installation and Filters Installation
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Astronomical Observational Techniques and Instrumentation
Polarized 3He target installation
Presentation transcript:

1 DECam in Chile Intro to Dark Energy Survey & DECam Project Status of arrivals in Chile Instrument checkout in Chile Schedule for first light

The Dark Energy Survey Science goal : Measure the time dependence of the dark energy equation of state, improving the figure of merit defined by the Dark Energy Task Force by a factor of 4-5 compared to present knowledge. Method: Conduct a 5000-square degree survey in 5 optical/near IF wavelengths in the Southern Hemisphere, down to ~21st -24th magnitude. Will observe 3 x 10 8 galaxies and 3 x 10 4 galaxy clusters, plus 4 x 10 3 Type Ia supernovae. Time scale: Requires ~ 500 observing nights over 5 years on a 4-meter telescope. 2

The DECam Project 519 Megapixel CCD camera with 3sq deg FOV Low noise readout system DAQ system Support systems: cooling, mirror handling, instrument handling 3

A reminder of the site in Chile Cerro Tololo Inter-American Observatory 2215 m elevation V.M. Blanco Telescope – 4 meter mirror, completed in early 1970’s Excellent astronomical ‘seeing’ 4 Merritt All Experimenters Meetting Dec

Shipping I. 2,501 s directly related to shipping 1,034 s related to coordinating and allowing shipments 62 people who have been directly involved. There are 45 shipments listed (including 5 which have not yet arrived at CTIO) Stats (lower limit): 89 boxes 17,069 cubic feet 147,089 pounds $7,227,159 in shipping value Merritt All Experimenters Meetting Dec

Shipping II. Large heavy parts were shipped by boat Oct 2010 F/8 handling system June 2011 Cooling system parts Aug 2011 Cage, NW platform, etc. Dec 2011 Final cooling sys parts 6 Flaugher July 2011 More delicate pieces by truck and air May 2011 RASICAM June 2011 Hexapod, Filter Changer and Shutter June 2011 Parts of LN2 Cooling system July 2011 i and z filters (from Japan to Chile) [delayed by volcano eruption] Aug r and y filters (from Japan to Chile) Nov 2011 The Imager (with CCDs installed!) Dec 2011 The corrector (enroute now!)

Imager with all Science grade CCDs. Testing completed at Fermilab at end of July

Cooling installation at CTIO July 2011 Herman, Andy, Rolando, Brenna and Tom went to Chile July 7-21 LN2 tank and piping was installed on console roof, LN2 circulated to Coude room (where imager will be serviced and tested) July 7th July 20th

July 25-Aug. 5: Shutter, FCM, Hexapod Ken Schultz and Cheryl Jackson replace Herman Andy and Rolando Tom Diehl exercising the shutter Filter changer operating in the Coudé room Flaugher July Hexapod operating at CTIO Limit switch issues with hexapod – now resolved Hexapod

August 3, 2011 The boat shipment with the prime focus cage, cage cart, imager handling system etc … arrived on the mountain top It had been unloaded from the shipping container onto the flatbed shortly after it was taken off the ship, making it possible for Gale & co. to unload the boxes using a forklift.

Installing Barrel in cage (no shroud on barrel) Barrel weighed (2200 kg) 11 September Trip for Cage Assembly DECam cage complete!

Training 12 Troublemaker in the Coude room, tests debugging skills of trainer and trainee

The Imager’s Trip Merritt All Experimenters Meetting Dec Left Fermilab Nov 17 Arrived CTIO Nov 23 Unpacked Nov 30 Under vacuum Dec 2 Cooled down Dec 5 Good full image Dec 6 !!

Shock Logger from Imager Trip 14 Left Fermilab Landed Santiago Unloaded at CTIO

Imager Checkout Team Merritt All Experimenters Meetting Dec

Cooled down & Reading Out! Merritt All Experimenters Meetting Dec Dec 5 18:10 Later on Dec. 5 Dec. 6: Beautiful flat field Image!!

Corrector Leaving UCL Earlier Today Barrel travels in two pieces: Body with C2,C3,C4,C5 Cone with C1 Left UCL this morning Arr Santiago Thurs, CTIO Fri-Sat 17

Still to Do 18 Corrector needs to arrive and have alignment of lenses checked at CTIO Final filter needs to be completed – 4 of the 5 filters have been manufactured by Asahi in Japan and are at CTIO. C1 lens in the cone – Nov 29 at UCL

Filters 19 Asahi Filter Plant 50 Mile zone

Safety Issue Merritt All Experimenters Meetting Dec

Summary of Current Status The Imager has arrived undamaged. It is cold and reading out. The Corrector is enroute to CTIO. By late January the imager and corrector should be reassembled and checked out completing the DECam Project after only 8 years!

Next: The Stars (and Galaxies)! CTIO will take the telescope out of service in February. The old cage will be removed and the new cage (empty) will be installed/uninstalled to check its fit and the installation procedure Next the DECam corrector, hexapod and dummy imager will be put in the cage and it will be reinstalled on the telescope. Finally the Imager will be installed, and we will be ready to observe the Southern sky – probably late Spring/early Summer. The Dark Energy Survey will start its 5-yr run this Fall. Merritt All Experimenters Meetting Dec

DECam Shipping Status 23

RASIcam in Action at CTIO Merritt All Experimenters Meetting Dec

f/8 Handling System at CTIO f/8 Handling System shipped to Chile in Sept – first large DECam system completed Designed and built at Argonne 25

Cooling Installation – July 2011

July 20, 2011 Training in shifts on cool down. LN2 reached the Coude room and the Jorge/Rolando copper by pass frosted up as planned. Congratulations to everyone!!

More Scenes from Imager Checkout at CTIO Merritt All Experimenters Meetting Dec

Alignment Frame for Corrector Completed at UCL Ken Schultz David Brooks Brenna

Rotary table alignment frame and laser system in UCL Optics Lab Plates added for precision x-y motions required for installing lenses in corrector barrel

Oct. 5: C2/C3 are installed in the Body! C2/C3 Next week C4 goes in (from the top) then C5. At that point we will know if our mechanical alignment and pins produce acceptable optical alignment. If so, shipping in early Nov. is on track. Ken and I go back to UCL Oct 24 th in case we can help.

DECal part 1: the new flat field screen from TAMU is installed It was installed by CTIO in October and has been tested with Mosaic – the new screen has 5 times more reflectance in u- band than the old screen.

Cone C1 lens is protected behind this cover Dec. 5 C1 lens