Retail Market Subcommittee Visibility into OGRR219.

Slides:



Advertisements
Similar presentations
Business Practices Subcommittee Update February 1, 2011.
Advertisements

Standards Review Subcommittee Update May 12, 2009.
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
January 6. January 7 January 8 January 9 January 10.
ERCOT Under Frequency Load Shed Testing
Retail Market Subcommittee Update to TAC February 5, 2004.
1 ERCOT True-Up Resettlement Restart Criteria Discussion Retail Market Subcommittee Meeting, February 24, 2003.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
LTRA Data Collection and Analysis Process. Data Collection Process  ERO-LTRA2008.xls workbook is sent as an attachment to the Data Request letter  Workbook.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 21, 2009.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
Retail Market Subcommittee June 9, 2010 Performance Measures 1st Quarter 2010 Transaction Comparison.
Retail Market Subcommittee Update to COPS Kathy Scott May 13,
1 Given the following data, calculate forecasts for months April through June using a three- month moving average and an exponential smoothing forecast.
10/11/2011 COPS Schedule for Upcoming Resettlements ERCOT Mandy Bauld.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Market Credit Working Group update to the Wholesale Market Subcommittee 04/06/
Retail Metering Working Group Progress Report 04/15/09.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
1 TAC Report to the ERCOT Board February 21, 2006.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
SunSatFriThursWedTuesMon January
1 TAC Report to the ERCOT Board February 16, 2005.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
Retail Market Subcommittee (RMS) Update Kathy Scott April 9, 2013Commercial Operations Subcommittee 1.
Nodal Formatting of Zonal Protocols Sections Currently Not Part of the Nodal Protocols 11/28/06 TPTF Diana Zake, Market Rules.
1 RMS Update By Don Bender January 9, RMS Approved Resolution Upon TAC approval, suspend further True-up settlements for True-up resettlement.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
November 3, 2015 RMS Review of RMS Member Responsibilities and Voting Structure Suzy Clifton.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
PMO Update to RMS Troy Anderson Program Management Office December 7, 2005.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
TX SET Update to RMS Wednesday, May 9, Elimination of the Drop to AREP o RULEMAKING TO AMEND COMMISSION SUBSTANTIVE RULES CONSISTENT WITH §25.43,
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Retail Market Subcommittee Update to TAC May 6, 2004.
1 TAC Report to the ERCOT Board November 14, 2006.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
NERC Field Trial ERCOT Time Error Correction. Balancing Authority Control Standards Drafting Team (BACSDT) Pursuing the option to eliminate Time Error.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Generation Adequacy Task Force Meeting April 10, 2014.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
UFLS Survey Explanation
2017 Seasonal Adjustment Factors
TAC Report to the ERCOT Board
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
TAC Report to the ERCOT Board
January 10, 2017 Retail Market Subcommittee (RMS) Update to TAC
Market Notice Regarding Off-line Units
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Kenneth Silver Los Angeles Department of Water & Power
Kenneth Silver Los Angeles Department of Water & Power
Timeline Overview Planned Timescales
Standards Review Subcommittee Update
Presentation transcript:

Retail Market Subcommittee Visibility into OGRR219

2 RMSMarch 11, 2009 OGRR 219 Time Error Correction Revision Description - This Operating Guide Revision Request (OGRR) removes the requirement that ERCOT perform time error corrections for accumulated time errors exceeding five (5) seconds. Overall Market Benefit - This OGRR reduces the number of times error corrections performed and provides data to North American Electric Reliability Corporation (NERC) to possibly eliminate time error correction as a Reliability Standard. Consumer Impact - No impact is anticipated. However, data gathered from this field trial is needed to determine that the end consumer is not affected by removing the time error correction and to prove that system reliability is not compromised.

3 Accumulated Time Error (TE) at the End of Month Month (2008) TE with Time Correction (seconds) TE with No Time Correction (cumulative seconds) January0.928 (5 corrections) February1.078 (3 corrections) March0.038 (7 corrections) April0.322 (8 corrections) May (10 corrections) June2.537 (7 corrections) RMSMarch 11, 2009 Time Error Accumulation The table below compares the actual Time Error at the end of each month and the results from a study of the amount of Time Error Which excludes the periods of correction. This shows that without Time Error Correction for the first four months in 2008, ERCOT system would have a Time Error of 62 seconds at the end of April.

4 RMSMarch 11, 2009 OGRR219 - Visibility, Visibility, Visibility Anticipated time drift for devices with time keeping synchronized to the system frequency –ERCOT accumulated Time Error will continue to increase greater than +/- 5 seconds as shown in previous slide. –From preliminary studies it is not uncommon to see up to 30 seconds of accumulated time error a month if not corrected Anticipated dates for the NERC field trial test –Start date is not set, but planning for May 2008 –Field trial can end at ERCOT’s discretion, but would like a minimum of a year with the caveat to extend.

5 RMSMarch 11, 2009 OGRR219 - Visibility, Visibility, Visibility Anticipated Operations during NERC field trial test –Time correction using the system frequency will not be performed unless a reliability or consumer issue is identified. –The Field Trial can be stopped at any time Anticipated Operations before/after NERC field trial –Time correction using the system frequency will continue as it is currently performed while the Field Trial is not in effect. –ERCOT Operations will still perform correction at 5 seconds.

6 RMSMarch 11, 2009 OGRR219 - Visibility, Visibility, Visibility Reliability Operations Subcommittee –Unanimous recommendation for approval Retail Market Subcommittee –Raise awareness and discuss –Looking for feedback impacts concerns NERC field trial test –Looking for more feedback before commencing –Market notice will be sent out prior to start

7 RMSMarch 11, 2009 Questions or Feedback Ken McIntyre –