Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Advertisements

F&T Inc. OVERHEAD CRANE SAFETY.
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
DOE Electrical Assessment of C-AD: Inaccurate Electrical Panel Schedules Missing Knockouts Panel Modifications Picture of the Week Collider-Accelerator.
Substation L1/ MCC L1 Update March 21 st, Current Location.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Cohesion Fund Monitoring Committee Development of District Heating System in Ventspils, Latvia Aivars Jurjāns Director, Project Implementation Department,
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
American Electrical, Inc. Junction Box / Hookup Box Fast and easy way to make electrical connections An assembled kit – no need to procure and assemble.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
Georgia Tech Safety and Health Consultation Program ELECTRICAL SAFETY TOOL BOX SESSION.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
1 RWM P OWER FEED TO EACH COIL S. Ramakrishnan. 01/29/20102 RWM COILS Existing Status The Six RWM coils are grouped in pairs Each Pair is fed from one.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
From Research Prototype to Production
The rush for Xirrus and our many partners begins now. | WI-FI for K-12 ENVIRONMENTS E-Rate 2.0.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Texasheart.org Main Substation (MSS1) 13,800 volts Analogies: Chest Pain = Corona Minor Stroke = Tracking Cardiac Arrest = Arcing (may not be able to resuscitate.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
PIP Update 3 September 26 th, L1 Future Plans  Installation is halted until further notice (plan for 2014 shutdown or when needed)  Substation.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
ELECTRICAL FIRES CAN BE PREVENTED! By PowerCheck.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
FESS/Ops Shutdown Summary Nov 9 th, CUB Status – Boiler #1 ON Primary Recirculating Pump repaired Second Belly Pump to be Wired – Boiler #2 OFF.
SC2004 Exhibit Status. Proposed Schedule Exhibit ships from SLAC 7/22 Arrive Fermilab 7/29 Fermilab Quantum Universe display opens 10/1 Ship date to SC2004.
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Georgia Tech Safety and Health Consultation Program
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
Series and Parallel Circuits
SERIES AND PARALLEL CIRCUITS
F&T Inc. OVERHEAD CRANE SAFETY.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
House Construction Budget Plan
Presentation transcript:

Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012

Status of Procurement  Substation L1  Transformer fully tested  Delivery expected in 1-2 weeks  Pictures of completed substation will be sent prior to shipment  Booster Transformer Y-BE2  RFP placed early August  All proposals due by 8/31/2012  Temporary Wiring  350 MCM cable is hung and wired for temporary panel board  Other temporary wiring will begin towards the end of August  Panelboard  1 assembled  1 needs to be assembled

Status of Procurement (Cont.)  Safety Switches  Delivered  Temporary installation will begin late August  Cable Supports  Delivered  Installation will occur late August to early September  Junction Box  Built  Will be shipped with substation

Substation Pictures

Substation Enclosure

Project Schedule  September  General Cleanup 2-3 weeks prior to shutdown of substation  Temporary electrical power will be completed the weekend prior (September 15 th )  It could take riggers several days to remove and install substations  Small clearances  Large weights  Discussions are underway to move forward with cutting a hole in LINAC’s roof  Contractors will be in this week to give a cost estimate

Temporary Power Plan  “Siphon” power from panel DHP-L2-2 Circuit #1  Cable will be run on temporary supports  4 conductor 350 mcm cable is heavy (~7 lbs./ft.) and will need an open area to lay  Some cable will be put on the floor but will be covered by a cable bridge  Setup 2 temporary panel board(s)  Run cable to individual loads  DHP panels, MCC loads  DHP panels will have potential hazards removed (mains, MCC, etc.)  13.8 kV lines will be disconnected  MCC loads will have configuration control locks  We will check current prior to using any MCC loads to ensure they will not trip off during operation  Power will be provided 24 hours a day

Installation Costs  1 Crew of Riggers (4-6 men)  Could be as much as $30k  Will remain unknown until a finalized roof plan is put in place  2 Week of Electricians  $100/manhour x 2 electricians x 80 hours = $16,000  Cable  2/0 - $3,500  2 – $3,700  House Power  $4,200 for panelboard  $2,000 for assembly  Miscellaneous Stock purchases  $2,100 Total Cost : $31,500 -> excluding rigging and roof Previous Estimate: $23,000 -> excluding rigging and roof Increase can be attributed to increased electrician time and panelboard cost

Future  Create Site Wide Monitoring Network PIP Project HQ PIP Project ???? Note: CG-1 has been moved from PIP schedule, and will now be handled by headquarters

Booster Y-BE2 Update  Replaced bad transformer  Working well  Decreased noise  Less heat  New transformer RFP  Estimated cost of $150k  Expect bids by end of August  Procurement will begin within 30 days of receiving bids  Will likely be much quicker  Install  Early next year  Several days