01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.

Slides:



Advertisements
Similar presentations
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Advertisements

LHC Ring Collimation – Overview – R. Assmann, AB/ABP for the LHC Collimation Project.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
ENEN Collimator Materials for LHC Luminosity Upgrade: Status of Irradiation Studies at BNL Collimation Upgrade Specification Meeting 21/06/2013 N. Mariani.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
FNAL Target Related Capabilities PASI 2013 Working Group 1 P. Hurh (FNAL)
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Lessons learnt at 5 th High-Power Targetry Workshop Fermilab, May 2015 Federico Carra EN-MME ColUSM
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September th.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
RA CPM 21/2/03 1 Present Approach and Status R. Assmann for the LHC Collimation Team Problem: Al/Cu system would not resist irregular dumps (pre-trigger.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
A. Bertarelli, A. DallocchioLHC Collimation Phase II – Conceptual Review 02/04/2009 Phase II Collimators at CERN: design status and proposals LHC Collimation.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
Bubble Chamber Radiator Thermal Analysis 5.0 MeV, 9.5 MeV Beam Energy Fredrik Fors Mechanical Engineering 8/20/2015.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Sergio Calatroni TS/MME 1 Reactive sputtering Some references on TiN sputtering models –Berg et al. J. Appl. Phys. 63 (1988) 887 –Larsson Vacuum 39 (1989)
Chamonix XV - V.Vuillemin / TS-MME 1 MME TS-MME Workpackages Beam Instrumentation Collimators.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
SPS High Energy LSS5 Thermal contact & cooling aspects
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
on behalf of the Phase II Collimation Design team
I. Bergevoet - Training preparation
News and Introduction from CERN June 15th, 2005
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
National Research Center” Kurchatov Institute”
Chamonix XV - V.Vuillemin / TS-MME
Components for the Machine-Interface Regions
Accelerator and Experiment Interface Session: LS2, LS3
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
Steering Meeting of EuCARD
Steering Meeting of EuCARD
Upgrade Strategy for the Experimental Vacuum Systems
EuCARD 1st Annual Meeting
2th EuCard Col/Mat WP Meeting
Beam Dump outline work plan (UK perspective)
Planning Quality control - Manufacturing logbook Photos Conclusions
Phase II Collimators : design status
HiRadMat Test Facility
The LHC Collimation Project Implementation of a Phased Approach
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
Wednesday June 30,  40-S2-A01 (open session)
LHC External Collimation Review
List of IPAC19 papers with reference to HL-LHC
Production Cryo HL-LHC BPMs
Presentation transcript:

Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator Work-package from AB to TS department Collimator Work-package from AB to TS department Design strategy Design strategy Technical design Technical design Thermal and Mechanical Calculations Thermal and Mechanical Calculations Experimental validation of thermal calculations Experimental validation of thermal calculations Planning Planning Quality control - Manufacturing Quality control - Manufacturing Conclusions Conclusions

Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 2 Logistics– Engineering– Design Manufacturing COLLIMATOR PROJECTRESOURCE PLANNING Project Leader: Ralph Assmann Ralph Assmann Project engineer: Oliver AberleEnrico Chiaveri Manfred Mayer Beam aspects, Mechanical engineering work package, Radiation issues, Cooling, Vacuum, Energy deposition, Machine protection, Beam instrumentation, Operation…… Coordination, mechanical engineering: Manfred Mayer Thermal and Mechanical Calculations Thermal and Mechanical Calculations: Alessandro Bertarelli Design strategy Technical design: Roger Perret Experimental validation: Sergio Calatroni

Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 3 Work-Package entrusted to our department: Work-Package entrusted to our department: –Mechanical engineering and analysis and design of six types of different collimators –Prototype design follow-up and production for SPS installation in August 2004, –Prototype design follow-up and production for SPS installation in August 2004, started in September ’03 –SPS life test and robustness test - first priority –Drawings for series production end of August Prototype manufacturing: well advanced Involved specialties: – –Design office, ANSIS thermo-mechanical simulations – –Workshop, Brazing, Surface Coatings, Metrology – –Water cooling, installation, remote handling LHC COLLIMATORS