Coast Construction & Design
Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution
Staffing Construction –Project Executive Scott Davis –Project Manager Dustin Crowell –Project Superintendent Danielle Dorsey
Design –Principal Architect Philip Stott –Lead Designer Matthew Calvey –Specialist Coordinator Valerie Morin Staffing
Collaboration
Design Approach -Integrated Practice -Building Integrated Modeling (BIM) - Design for Change -adaptability / expansion - Professional Interaction Break down the barriers – connectivity -Permanent structures -Utilize existing grid
Architectural Integration -Integrated Practice (BIM) -Client/designer/builder -reduce cost & Time -Higher quality -Design Flexibility -Extensive Module Integration -Spatial Customization -Future expansion
Architectural Integration -Professional Interaction -Increase Chance encounters -Extend production through connection -Permanent Structure -building envelope -Independent utilities
New England Lab - Casework and furniture systems.
-3 Major Zones -Auditorium -Laboratory -Office/ Conference Space
-Sustainability -Social -Architectural
-Integrated Practice -Building Information Modeling
Flexibility
Mechanical, Electrical and Plumbing Sustainable Strategies Integration of systems
HVAC 3 systems for 3 functions Zoning - Module - special requirements
Plumbing Salt water supply High water quality - filtration systems - Thermal regulation
Stormwater Management Water efficient landscaping Renewable energy Sustainable Strategies
Challenge Three Estimate –Collaboration –Extensive database
Challenge Three Schedule –Long lead items –SIPS –Closeout
Challenge Three Site Logistics –Storage Units –temporary facilities –Lay-Down Area –Permits –Parking
Challenge Three Quality Control –On-site Quality control manager –Tagging Process
Challenge Three Safety –Safety Manager –S.T.O.P. Program
Conclusion We are the Right Team for the job –Experience –Collaboration