F/A-18 Awarded & Pending PBLs

Slides:



Advertisements
Similar presentations
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
Advertisements

1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
VSE Corporation Proprietary Information
DoD Teaming Group E2C2 FST Obsolescence Management Team May 2, 2001
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Single Line of Accounting
Fall Product Support Conference Hilton Head, SC November 7-9, 2005 Session #2: PBL Success Stories and Challenges Speaker Name: Steve Blessing,
21 ST CENTURY NAVAL AVIATION LOGISTICS PRESENTATION TO: NDIA LOGISTICS CONFERENCE RADM BERT JOHNSTON VICE COMMANDER, NAVAL AIR SYSTEMS COMMAND 2 MARCH.
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
Strategic Supplier Alliances Strategic Materiel Sourcing Paul E. Botts, Col, USAF Mr. Stephen Rodocker, GS-15 DSCC-Procurement Group August 2003.
Performance Based Logistics: Transformation Through Partnership.
Copyright © 2005 AESSEAL plc Patent Pending Issue 14Slide: 1 Advanced Non-Contacting Bearing Protection PRESENTED BY AESSEAL plc.
High Efficiency Commercial Gas HCG Series. 2 American HCG Series The HCG Series High Efficiency Commercial Gas Water Heaters embody all that’s great about.
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
Wire System Maintenance Reporting Codes Pall B. Arnason Team Leader, Advanced Development Programs Wiring Systems Branch Aging Aircraft IPT / AIR
Project Status as of 1 April 2003
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
FIBER OPTIC STATUS TMDE Program Life Cycle Conference November 2003 Robert A. Throm NSWCDD Code B35.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Aircraft Tire PBL Programs
Readiness-Based Sparing addresses a challenge common across DOD
Leeds Low Emission Vehicle Exhibition and Conference Graham Belgum (FirstGroup) and Ian Downie (Volvo Bus UK) 7 th October 2010.
Pollution Prevention Toyota Industrial Equipment Mfg., Inc. December 7, 2011.
Naval Inventory Control Point 1 PBL Background The Support Spectrum Mini-stock point Commercial Off-the-shelf “Full Service”Contractor Logistics Support.
Naval Inventory Control Point 1 F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an alternative support strategy emphasizing Government/Industry.
AN/ALR-67(V)3 Advanced Special Receiver (ASR) Direct Vendor Delivery Program Presented by: Daniel Buechler ASR R&M IPT Lead (805)
Performance Based Logistics: A New Business Paradigm
Performance Based Logistics DAU LOG 304
1 Logistics Conference & Exhibition May 20, 2004.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Performance Based Logistics
Performance Based Logistics and Depot Partnering Lessons Learned Gerald Tonoff – NAVICP 0225 Debra Bautista – Cherry Point Mike Marinshaw – Honeywell TLS.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Overcoming The Challenges Together Fred Brisbois Director, Aviation & Product Safety Sikorsky Aircraft REDUCING THE ACCIDENT RATE.
The F/A-18E/F Super Hornet
1 Twelfth PEO/SYSCOM Commanders Conference The NAVSEA Perspective On Full Service Partnering Mr. John Goodhart Assistant Deputy Commander Fleet Logistics.
Local Area Augmentation System (LAAS) LOGISTICS Alaskan Region Briefing 1 October 2002 Jim Hanrahan, FAA ARN-100.
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Empowering Smart Machines.
Army Working Capital Fund (AWCF) Investments Process and Opportunities
1 DLA Aging Systems Program: Technology Investment for Sustainment Cliff Wolfe Program Manager DSCR-VE March 2005.
NAVAL INVENTORY CONTROL POINT 1 Naval Supply Systems Command Status of NPB Focus Item Inadequate Technical Data Elaine M. Smith NAVICP Asset Protection.
Naval Inventory Control Point 1  Work with all stakeholders early in the PBL formulation process to develop system support strategy  Develop SOW and.
WHAT DOES CONTROLLING IN CHANNEL OPERATIONS ENTAIL? Utilize ROI as a tool to monitor performance Manage customer relationships.
The Cooling System (Reasons for)
2 SISCON TECHNOLOGIST PVT.LTD ISO 9001:2000 CERTIFIED COMPANY SISCON is a leading group of Electronics Company dealing with automation product. This company.
Copyright © 2007 Boeing. All rights reserved. Collaborative Forecasting Senior Executive Partnership Round Table Ellen Martin Integrated Defense Systems.
ATA Purchasing Jeff Foster. Aerospace Testing Alliance  Joint venture between Jacobs Engineering, Computer Sciences Corporation, and General Physics.
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
Department of Defense PBL Award Winners
Single Line of Accounting
Plug-in to the Future of Hybrids
Performance Based Logistics and Depot Partnering Lessons Learned
The Future of the Print Industry – Our Focus
F/A-18 Awarded & Pending PBLs
Fuel Conservation Airframe Maintenance for Environmental Performance
INVENTORY MANAGEMENT Explained By: Sarbjit Kaur.
Single Line of Accounting
CTMA Investment - $2.3M; Industry Cost Share - $4.8M
Equipment Monitoring Market
Department of the Navy Performance Based Logistics
Overfill Prevention Technology and Maintenance
Performance Based Logistics and Depot Partnering Lessons Learned
Life Cycle Logistics Perspective KC-46 Product Support
O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS
MODELLING OF AN OPTIMIZED, AUTOMATED WATER SUPPLY SYSTEM FOR OLKARIA
Presentation transcript:

F/A-18 Awarded & Pending PBLs HUD/DDI * Rockwell ALE-50 Raytheon LEF Moog/NI/Jax TEF/Stabs Parker Hannifin Fuel Control Honeywell F414 C&A GE F404 GE Awarded PBLs Pending PBLs * Supports Multiple A/C F414 Depot CompGE ARC 210 * Rockwell Turbines * Honeywell SHARP TBD FIRST Boeing: 73% of E/F 3889 E/F WRAs 653 of FIRST Repairables accomplished at I-Level 349 Support Equip. Items 170 DLA Consumables 10,100 Non-DLA Consumables SMS * Smiths JHMCS * VSI APU * Honeywell AESA Boeing SCRI 001 – Pitot Static Probe Completion Mar04 (1st Production Install), SCRI 002 Wingfold Transmission – 31 Mar 04 Compl, SCRI 003 Pressure Regulator Shut Off Valve – Complete 31 Jul 03 (Production Incorp), SCRI 004 Aft Avionic Cooling Fan – On-hold pending BCA outcome, SCRI 010 – FCC OFP BIT improvement 19 Jan 04 go “Green” target, SCRI 012 GCU Reliability Imp - 11 Apr 04 NAVAIR JCCB Go “Green”, SCRI 011 Hook Shank Corrosion – 31 Jul 04 (Production Incorp), SCRI 015 Boarding Ladder – Apr 04 Completion, SCRI 031 Pitot Static Probe Covers – Mar 04 first incorp., SCRI 032 Common Canopy Design - 16 Jan 04 Go “Green” date, SCRI 033 Canopy Glass Optical Repair – Apr 04 Completion, SCRI 039 Damage Repair Analysis S/W – Aug 05 Completion, SCRI 021 DECD Supportability - , SCRI 045 ECS Controller S/W BIT Jun 04. FIRST FY06 and Beyond: F/A-18 A through F EA-18G APG-65/73 AESA FMS DLA Consumables Retrofits Modifications APG-65/73 Boeing ALR-67v3 Raytheon Tires Michelin AMC&D * GD/Honeywell EIBU Smiths SMUG Smiths ALQ-126B * BAE/Jax ATFLIR Raytheon Support Equipment * Multiple OEMs NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

General Electric’s F404 Performance Availability increased from 42% to 92% in 18 months Excess -400 spares in fleet resulting in reduced requisitions Absorbed all additional requisitions from I Levels TAT reduced by 30% GE advance released significant material for risk reduction Status Aug 03 Status Feb 05 “PBL” High Priority Backorders 436 “7R” High Priority Backorders 560 20 “1R” High Priority Backorders 109 15 “PBL” Total Backorders 781 5 “7R” Total Backorders 1308 45 “1R” Total Backorders 224 27 Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Rockwell’s Displays Performance Current Performance: Status 1 Oct 03 Status 28 Feb 05 AVAILABILITY RATE < 50% 99% BACKORDERS (Excluding QZs) 583 51 DDI & HUD A TOP TEN DEGRADER YES NO Near Term Goals: 100% Availability with no backorders No WRAs being returned to Depot by the Fleet Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Honeywell’s APU Performance Performance Metrics Availability: 97% Average LRT: 5.1 Days Deliveries (WRA & SRA): 250 Depot Work Share (required 25%): 36.2% Reliability Current MTBUR: 1050 FY03 MTBUR: 883 Delta: + 19% Honeywell Directed Change Requests 10 FY00 FY01 FY02 FY03 FY04 FY05 Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Smith’s SMS Performance In Sixth Year of Operation Performance to Date: Backorders reduced from 420 to 0 in under 6 months Supply Availability Performance: 100% Requisitions Received/Shipped: 7900/7900 Fleet Satisfaction: Very High Utilization of Wholesale Assets: Optimized Obsolescence Management: Processed 353 Class II Changes In Process of Adding Control Set Converter to Program Three level maintenance (O, I, Organic and Commercial D) NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter

Boeing’s Supportability Cost Reduction Initiatives (SCRI) $19.8M non-recurring investment driving $430.2M* cost avoidance ECS Controller Software BIT Improvement Common Canopy Design Enhanced Surface Finish Training Damage Repair Analysis Software Tank 3 Fittings AMAD Power Takeoff Shaft Seal Improvement Arresting Hook Shank Corrosion Protection Canopy Glass Optical Repair Improvement Pressure Regulating/Shut Off Valve Redesign Tank 1F Scuff Patch Second Source Displays Horizontal Stabilator Servocylinder Wire Harness Improvement Digital Expandable Color Display (DECD) Supportability Generator Control Unit Reliability Improvement Trailing Edge Flap Servocylinder Wire Harness Improvement Pitot Static Probe Cover Enhancement LCS 3-Way Shutoff Valve Reliability Improvement Wing-fold Transmission Lug Bushings Pitot Static Probe Heater Redesign Boarding Ladder Actuator and Storage Flight Control Computer Maintainability Improvement Boarding Ladder Reliability Improvement Incorporated/Complete Approved / In Work IW/Partial Incorporation Pending Concurrence * Joint NAVAIR, NAVICP and Boeing total cost avoidance validated by AIR-4.2 & Approved 12/6/04 New for 2005 Slide approved by ESC on 6-2-05 NAVAIR, NAVICP, DLA, and Boeing - One Team Supporting the Warfighter