ACCELERATES NEXT STAGE REFORM

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

FLORIDA PUBLIC SERVICE COMMISSON WORKSHOP ON RENEWABLE PORTFOLIO STANDARDS JULY 26, 2007 BY E. LEON JACOBS, JR. WILLIAMS & JACOBS.
NATIONAL CONFERENCE ON “10 YEARS OF THE ELECTRICITY ACT, 2003: A CRITICAL REVIEW” Anish De New Delhi, June 11, 2003 Anish De New Delhi, June 11, 2003.
Prayas Energy Group, India NATIONAL CONFERENCE ON: “10 YEARS OF THE ELECTRICITY ACT, 2003: A CRITICAL REVIEW” SECTOR PERFORMANCE AND REGULATION Presentation.
Fossil Fuel Subsidy Reform: Cash Transfers for Kerosene and LPG subsidies The Energy and Resources Institute August 28, 2012.
Presentation on serious issue of Regulatory Assets for the FOIR meeting 1 26 th June, 2014, Gulmohar Hall, India Habitat Centre, New Delhi Presentation.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
Slide 1 of 11 Moving Towards Sustainable Power: Nudging Users and Suppliers with Policies, Technologies & Tariffs Ajay Mathur Bureau of Energy Efficiency.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Madras Chamber of Commerce & Industry and India Energy Forum Session on Rationalisation of Electricity Tariffs Anand Madhavan Head – Energy & Urban Infrastructure.
Power Sector SCENARIO in Rajasthan Presented By: Deepak Saxena CUTS Centre for Consumer Action, Research & Training (CART)
EBRD Support for Renewable Energy and Energy Efficiency projects Ian Brown Power & Energy Utilities Team Pristina, 14 May 2013.
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
Increased Role of Finance Professionals in Power Sector – 12 th Plan & beyond Er. A. K. Bohra, Director, NESCO, WESCO, SOUTHCO and CEO, Central Services.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Welcome and Introductions CoServ Presentation & Member Input.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Prayas Energy Group, India Regulatory process to enhance transparency and accountability: examples from India Bishkek, September 2011 Presentation By Prayas.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Macro Implications of Micro-Participation: Participatory Management of Electricity Distribution in Eastern India Ashwini K Swain IPPG.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
Akshay Prakash Yojana A Voluntary DSM Initiative November 2005 
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
REFORMS IN DELHI. Reforms in Delhi --- Points of Concern Heavy urbanization, unbridled influx, ballooning population, haphazard growth, abundant availability.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
Prayas Energy Group, India Transparency in Electricity Service Delivery: Billing, Quality of Service and consumer issues Bishkek, September 2011 Presentation.
Nursery Management Understanding and Managing Finance Session 9.
The strategy for improved electricity distribution maintenance 9 June 2008.
Analysis of ARR & Tariff Proposal of SOUTHCO for FY February 10, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Analysis of ARR & Tariff Proposal of NESCO for FY February 09, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
Programme Financial Implications for Municipalities Eskom’s view on how to establish the financial impact of restructuring - as input to the EDIH.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
New Challenges for the Power Sector 18 th India Power Forum On 17 th November, 2015, Hotel Imperial, New Delhi Presentation by: Shri V. S. Ailawadi – IAS.
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
Discussion on Multi Year Tariff By Vivek Sharma & Manisha Kabra.
Course 3.6 Regulatory Commissions: Management & Staff Functions, Bangladesh, Mar 31- Apr 4, 2002 SOUTH ASIA REGIONAL INITIATIVE/ENERGY Regulatory Commission.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
MINEM – April Undersecretariat of Renewable Energy Ministry of Energy and Mines - MINEM Republic of Argentina RENEWABLE ENERGY IN ARGENTINA New Regulatory.
PRESENTATION ON TARIFF POLICY By S.R.SETHI DIRECTOR (OPRS) DELHI TRANSCO LTD.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
1 Block 5: Session 3 (Part 1) Organization financial measurement:- The main aim of this section is to introduce you to several ways in which org. attempt.
Presentation to the Portfolio Committee on Energy
Fiscal Analysis Division
Operationalizing One Nation One Grid
The Lesser Known Tariff
Ministry of Regional Development and Public Works
1/16/2019 Univ. of Chicago/Argonne Agents 2002, Oct. 12, 2002 Introduction to Electricity Regulation Randal C. Picker Leffmann Professor of Commercial.
bihar electricity regulatory commission
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

ACCELERATES NEXT STAGE REFORM TURNAROUND OF DISCOMS ACCELERATES NEXT STAGE REFORM A Dr. M.K.Iyer, Member Central Electricity Regulatory Commission November 17, 2015

OUTLINE OF PRESENTATION What is Turnaround ? Role and Responsibilities of Discoms under the Act Performance of Discoms – Post 2003 Pull Factors responsible for Poor Performance Policy Initiatives to improve performance Turnaround of Gujarat Discom : Case study Approach by GoI for turnaround of Discoms Accelerates next stage reform

BUSINESS TURNAROUND “Turnaround” connotes the financial recovery of a organization that has been performing poorly for an extended time” “Business Turnaround” is the reversal falling results – sales and profits – through fundamental change. ----------------------------------------------------------------------------------------------------- Turnaround is time dependent, it varies with the time Turnaround strategy varies with the situation and time to time Strategies In order to implement “turnaround”, an organization must acknowledge the problem, develop and implement problem solving strategy. The problem and solution can be either due to: External Factors – Policy and external measures (uncontrollable) Internal Factors – Management and operational level measures

Sustainability – Internal Reform BUSINESS TURNAROUND Situation/ Problem Assessment Factor Identification (External & Internal) Problem Solving Strategy Rollout Plans ( Pilot basis/Holistic basis) Result Monitoring and adjustments Sustainability – Internal Reform

TURNAROUND STRATEGY Turnaround strategy could be either : A) External Measures: Policy Rationalization Business environment Internal Measures : Management Reforms Financial Reform Administrative Technological Adoption IT enabled management

TURNAROUND OF DISCOMS POST ELECTRICITY ACT,2003

OBJECTIVES OF THE ACT AND POLICIES – DISCOM Bringing Competition Provision for Open Access Procuring Power - Competitive bidding Multiple distribution licensees Accountability & Transparency Establishing SERC and APTEL Unbundling of the Power Sector and Reorganization of Discom Commercial Viability – Tariff Principles Tariff Setting – Cost of service principle State Government Subsidy -to bridge gap Access to Network Universal Supply Obligation (USO) Rural electrification – Government Scheme Quality & Affordability Standard of Performance Consumer Grievance Redressal Reduction in T&D losses Renewable Energy – Obligations Mandatory RPOs REC mechanism

PERFORMANCE OF DISCOMS POST ELECTRICITY ACT,2003

OPERATIONAL PERFORMANCE OF DISCOMS – POST 2003 All India AT&C Losses 2011-12 26.63% 2012-13 25.45% 2013-14 22.7% Gap in Average Cost of Power Supply and Average Tariff Realised. High AT&C losses. Source : Planning Commission Annual Report 2013-14 on the Working of State Power Utilities & EDs

PERFORMANCE OF DISCOMS – POST 2003 Losses have been increased from 2010 onwards; Higher losses is due to increase in per unit cost and inability to control losses. ( Annual Losses in Crore) Source : powermin.nic.in * estimated figure

PULL FACTORS FOR PERFORMANCE OF DISCOMS

PULL FACTORS RESPONSIBLE FOR POOR PERFORMANCE -DISCOM High Transmission and Distribution (T&D) Losses High Aggregate technical and commercial (AT&C) losses Commercial losses was Rs 16,666 Cr in 2007-08, Rs 37,836 Cr in 2011-12 and now estimated @60000 cr 2014-15 (cont/-

PULL FACTORS RESPONSIBLE FOR POOR PERFORMANCE -DISCOM Mismatch between the tariffs and cost of generating power: Cost of supplying electricity increased at a rate of 7.4% annually between 1998-99 and 2009-10 and average tariff was increased at the rate of 7.1%. After 2007-08 onwards, the gap of average cost of supply and average tariff increased significantly: Year Unit Cost Average Tariff per Unit Gap between Cost and Tariff Gap as % of 2007-08 4.04 3.06 0.98 24% 2008-09 4.60 3.26 1.34 29% 2009-10 4.71 3.27 1.44 30% 2010-11 5.06 3.67 1.39 27% 2011-12 5.70 4.39 1.31 23%

PULL FACTORS RESPONSIBLE FOR POOR PERFORMANCE -DISCOM Debt Spiral: Working Capital have consistently increased due to high losses and liquidity problems Banking sector’s short term exposure to Discoms is quite substantial, and was about Rs. 1.5- 1.7 trillion as on March 2012, which is 3-3.6% of banking credit and 45-52% of total power credit Banks reluctant to fund these losses – in turn stretching payments to their creditors Subsidy : Discoms on an all-India basis is about Rs. 43,000 Cr in FY 2012, which represents an increase of 13% from FY 2010. There are issue in realizations.

ISSUES IN DETERMINING RETAIL TARIFF Policy Directives ( specific tariff for BPL consumers, agriculture consumers etc.) Cross – subsidization within the category of consumers Capacity to pay (consumer) High power purchase cost

FINANCIAL RESTRUCTURING PLAN FOR DISCOMS

FINANCIAL RESTRUCTURING PLAN KEY FEATURES Cabinet Committee on Economic Affairs (CCEA) approved the much awaited scheme for Financial Restructuring of State Distribution Companies (Discoms) on September 24, 2012: Key Features: Proposed to restructured debt worth Rs 1.9 Lakh Crores 50% of the outstanding short-term liabilities (STLs) of Discoms as of March 31, 2012 will be taken over by state governments. First converted into bonds to be issued by Discoms to participating lenders, backed by a state government guarantee. Balance 50% of STL will be rescheduled by lenders and serviced by Discoms with a principal moratorium of three years Eight States -Tamil Nadu, Uttar Pradesh, Rajasthan, Haryana, Jharkhand, Bihar, Andhra Pradesh and Telangana availed the scheme. Most of these states have failed to meet the performance criteria specified in the scheme.

FINANCIAL RESTRUCTURING PLAN DEFECTS Though FRP provides immediate relief to Discoms- but it was temporary and not designed with long term solutions There were major unresolved issues facing the power sector, such as: Coal shortage Land, environment clearance Regulatory Transparency Tariff hikes Operational inefficiencies Subsidy dependence Free power to some sections of the population

EFFECTIVE TURNAROUND PLAN SYNERGY WITH ADDRESSING PROBLEMS Resolve the Problems (Long Run Solutions) Coal shortage Land, environment clearance Regulatory Transparency Tariff hikes Operational inefficiencies Subsidy dependence Free power to some sections of the population Debt Restructuring (Short Run Solutions) Debt support from Government Internal resource generation improving efficiency and tariff pricing suitably Effective and bold measures to address the problems for long term solutions and debt restructuring for short run solutions  Turn around of the Discoms

TURNAROUND OF GUJARAT DISCOMS: A Case Study

Gujarat Power Scenario in 2002 State’s installed capacity: 8756 MW Peak deficit: 20% Power cut / Load shedding of 4-5 hrs Low voltages due to inadequate transmission network and substations Erratic power supply due to mixed load of agriculture and villages T&D losses as high as 34.20% - rampant power theft Severe voltage fluctuations and transformer failure Retail tariff – not cost reflective Poor billing and collection efficiency Loss of Rs 2543 Crs in 2000-01 Accumulated losses Rs 8286 Crs before unbundling

Steps for Turnaround Unbundling of the Sector GEB unbundled on 01.4.2005 into 7 Companies in segments for better administration, efficiency & consumer services 1 Holding & Co-ordinating Co. 1 Generation Co. 1 Transmission Co. 4 Distribution Co. each in South, Central, North & West Gujarat Aggressive capacity addition- In 2009, Gujarat becomes surplus state

Growth of Installed Capacity

Steps taken – Distribution Investment made from 2002 onwards – Rs 16,550 Crs More than 500% rise (up to 2001-02 – Rs. 3340 Crs) Feeder Segregation – Jyoti Gram Yojana – Rs. 1300 Crs Highest cash incentive of Rs 1100 crs under APDRP Revenue rise from Rs 7,274 Crs to Rs 29,000 Crs – 11 % CAGR Average tariff rise from Rs 1.93 to Rs. 4.68 – 7 % CAGR

Jyoti Gram Yojana (24x7 Supply) Specially Designed Transformers (SDT) on Agricultural Feeders for 1- phase power to farmers living on farms Execution in just 30 months (March 2006) Load Management with JGY Prior to JGY After JGY with SDT 8 to 14 hours 3-ph power 10 to 12 hrs single phase 4 to 5 hrs no power supply 24 hrs 3-ph power on JGY feeders Minimum 8 hrs 3-ph continuous power on Agriculture feeders 1-ph with SDT for balance period on Ag. Feeders

Distribution Initiatives Use of XLPE Coated and Aerial Bunch Conductor Bifurcation of overloaded feeders Replacement of old meters with precision meters Metering at Transformer centres Automatic Meter Reading for H T System Improvement, Metering & Energy Accounting Extensive installation checking Vigilance drives to curb power theft

Distribution Initiatives Strict penalty for power theft including imprisonment 100 % billing & collection efficiency Disconnection for default in payment of energy bills 34 Designated Courts & 5 Police Stations Checking drives in tough areas with police for unauthorized use & theft Prompt theft assessment, compounding and prosecution

Cost Minimization measures Debt Restructuring reduced Interest cost by Rs. 363 Crs Re-negotiation of PPAs reduced power purchase cost by Rs. 559 Crs Long term power 7615 MW tied up at competitive prices (Rs. 2.25-2.89) Power purchase as per Merit Order Protocol Intra State ABT – April 2010 Surplus power sale ( 7284 Mus - 2013-14 )

Sector Turnaround Sector turnaround from Rs 2,543 Crs loss in 2000-01 to a profit of Rs 203 Crs in 2005-06 29

TURNAROUND OF DISCOMS FOR FUTURE

APPROACH OF GOVERNMENT OF INDIA ADDRESSING PROFITABILITY OF DISCOMS Internal Measures: Government approach is to bring the performance of Discom on track by focusing on: Improvise Profitability of Discom Lowering cost of supply Operational efficiency Cost reduction from central support B) External Measures: Government has introduced debt restructuring plan indicating permanent approach to address the funding of commercial losses

IMPORTANT ASPECTS WHILE IMPLEMENTING TURNAROUND STRATEGIES (FOLLOWING DONT’S MAY BE CONSIDERED) Pilot project approach : There are many “pilot project” solutions implemented but did not succeed. Pilot project approach may be done away and direct implementation may be adopted. Carrot and Stick approach: The solution for reduction of AT&C losses will not only work through stick approach (using section 136 and 126 of the Act). Suitable strategy may be adopted. PILOT Enabling quarterly tariff increase Operational Efficiency Lowering Cost of power Reduction in overall cost in entire chain Addressing fuel issues – certainty of fuel Land related issues – Land bill Co-operativne federalism IT enabled solutions

ACTIONS OF GOVERNMENT OF INDIA ADDRESSING PROFITABILITY OF DISCOMS UDAY (Ujwal DISCOM Assurance Yojana) aims at permanent resolution of DISCOM issues through: Enabling quarterly tariff increase Operational Efficiency Lowering Cost of power Reduction in overall cost in entire chain Addressing fuel issues – certainty of fuel Land related issues – Land bill IT enabled solutions

WAY FORWARD/SUGGESTION TO ENSURE SUSTAINABILITY OF TURNAROUND Internal Reform are essential to ensure the sustainability of the turnaround of Discoms through : Operational efficiency Effective strategy to reduce AT&C losses Organization functions should be on sound commercial principle Skilled and motivated workforce No more Pilot Projects Use of efficient and IT enabled technology DSM is to be taken in a big way

WAY FORWARD/SUGGESTION TO ENSURE SUSTAINABILITY OF TURNAROUND MYT – 5% increase in should be allowed subject to true up Framework for disincentive for not controlling T&D losses within limit Extensive use of smart metering and implementation of smartgrid DSM is to be taken up in larger scale REGULATORY SUPPORT GERC has consistently allowed tariff revision to the distribution sector varying from 2.47% to 8.34% during last five year apart from the FPPPA pass through on a quarterly basis every year.

(TURNAROUND WILL FACILITATE NEXT STAGE REFORM) Increase investment in Renewable Electricity Amendment Act, 2003

Thank you