Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues 12.5.2009.

Slides:



Advertisements
Similar presentations
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Advertisements

AT Equ. Groups / AB-CO Control responsibility Sharing.
Sixth Edition 1 M a n a g e m e n t I n f o r m a t i o n S y s t e m s M a n a g I n g I n f o r m a t i o n T e c h n o l o g y i n t h e E – B u s i.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
Chapter 13 Organizing Information System Resources MIS Department Centralization and Decentralization Outsourcing Computer Facilities and Services.
SCADA and Telemetry Presented By:.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Industrial Controls Engineering Department SM18 Control Systems overview Jeronimo ORTOLA Roberto SPERONI EN/ICE Technical Committee 25 th June 2015.
Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.
DR, SC strand and cable measurement instrumentation Mechanical testing of superconductors lab. 103 Low-temperature electrical testing of.
Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 1/7 Superconducting.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
AT Measurement Systems
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
HQ01e3 test summary December 2012 M. Marchevsky, LBNL.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
Next Steps, Priorities, Strategy for Spares Ray Veness.
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
Systems Development Life Cycle (SDLC)
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Fermilab Measurement & Analysis Group Magnet Systems Department Weekly Meeting Overview JCT.
Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October H.
CERN Giovanna Lehmann, Xavier Pons
HL-LHC IT STRING and Series test of SC link
FCC Cryo-magnet Logistics
Contents Future requirements for magnetic measurements
on behalf of the RF group
Hollow e- lens, Cryogenic aspects
Additional ancillaries for the operation of the Hollow Electron Lens
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Electrical and electronic systems projects
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-ICE Technical Committee SM18 activities & projects
Cable and Strand test facility
TEST PLANS for HL LHC IT STRING
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues

Instrumentation for SC wires and cables (D. Richter) Status of present instrumentation (H/W and S/W) in 163/103/288 Inventory of dedicated electronics (e.g. protection, power converters) and support required Maintenance plan (to keep functionality) Cabling/recabling of installations (FRESCA) Development plan (to improve measurement capability) Magnetization and AC loss measurement Faster DAQ for transient measurements (plan for test)

Instrumentation for SC magnets (TBD) Status of present instrumentation (H/W and S/W) in SM-18 and B-4 (180 ?) Inventory of dedicated electronics (e.g. protection, PLC, security matrix, amplifiers, power converters) and support required Maintenance plan (to keep functionality) Development plan (to improve measurement capability) New protection electronics ? DAQ for vertical test benches in SM-18 ?

Instrumentation for magnetic measurements (M. Buzio) Status of present instrumentation (H/W and S/W) at CERN Inventory of dedicated equipment and electronics (e.g. shafts, moles, integrators, amplifiers, …) and support required Maintenance plan (to keep functionality) Development plan (to improve measurement capability) FAME status and plans F 2 M 2 status and plans

Measurement control and acquisition (A. Rijllart) Status of control and DAQ systems for measurements at CERN Maintenance plan (to keep present functionality) Development plan (to insure long-term functionality) Phasing out of H/W PXI proposal

Management Information System for SC’s (E. Charifoullina) Business model design Data repository and interfaces with control and acquisition applications Maintenance plan for LHC-MIS (LHC “CableDB”) Development plan (TE-MSC-SCD “LaboratoryDB”) MIS design Interface and compatibility with MTF

Management Information System for magnets (TBD) Design Data repository and interfaces with control and acquisition applications Role of MTF and alternatives