SITR: FORCAST February 19, 2010 Cornell University Herter.

Slides:



Advertisements
Similar presentations
G2P Target installation and Beyond. Schedule Pivot before.
Advertisements

1 Comparison of MIRAC-4 array with Cornell test array, both warm ver 3 Bill Hoffmann November 10, 2009 Test configuration Array: MIRAC-4 array or Cornell.
SSSC/SITR: FORCAST September 29, 2009 Cornell University Adams/Herter.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
GLAST LAT Project 1S. Ritz Discussion: To Where From Here? DC2 Closeout Meeting 2 June, 2006 S. Ritz Gamma-ray Large Area Space Telescope.
RUN HISTORY Preparation: 17/10Cryostat, pumps and electronics mounted in the cabin (total time 2h) 18/10Cooling down to 80mK. Resonances OK (SRON array)
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
SOFIA First Light: Observations with FORCAST Terry Herter + FORCAST team + Project Team (Ames, Dryden, USRA) TLH: 11-Jan-11.
October 1 -10, 2014JEM-EUSO Workshop - Toulouse1 Balloon – EUSO Xenon / UV LED Flasher Calibration Evgeny Kuznetsov for UAH / MSFC GLS team University.
EMR Work Flow KNIGHTS Clinic at Grace Medical Home.
Setup Reduction Module
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
Health & Safety Site Verification Audit Procedural Training F b RevNo: 0 / Omni Facility Services Health & Safety Site Verification Audit.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MCCS Status Update SOFIA SITR Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Observational Astrophysics I
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
IRAM 08/02/12 – Run 3 Cryostat New Pulse-Tube (helium-free). Laboratory performances : Cooling-down time  30-48h Number of cooling cycles so far12 Base.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
FourStar Status Eric Persson (OCIW) Presented By.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
The InGaAs IR Array of Chunghwa Telecom Laboratory Chueh-Jen Lin and Shiang-Yu Wang, Optics and Infrared Laboratory In 2006, Advanced Technology Laboratory.
STIS STATUS Charles Proffitt TIPs May 21, STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.
Installation of the T600 at Fermilab CSN2, September 22,
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Installation of the T600 at Fermilab Fermilab, February 15,
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Installation of the T600 at Fermilab
2K Cold Box PDR Introduction
PRR Activation Meeting
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
IR detector for demonstrator and Readout
Test plan of ESS HB elliptical cavity
TripleSpec 4 Status and Coming Steps
Status of the cryogenic system for B180
Question & Suggestions March 17th
FourStar 4K x 4K JHK imager
Well Repair Installation of Well Liners
SNS Cryoplant Commissioning Past Experiences
Cryomodule Assembly Plan
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
CTF Users’ Perspective
Introduction to LabVIEW
Presentation transcript:

SITR: FORCAST February 19, 2010 Cornell University Herter

19-Feb-102 FORCAST Status FORCAST is up and running in lab at DOAF! Kudos to the FORCAST team o George Gull, Chuck Henderson, Justin Schoenwald o Joe Adams, Luke Keller Schedule o 2/05FriShipped via FedEx Custom Critical o 2/07SunArrived at DOAF parking lot o 2/08MonUnpack & prep for cool down o 2/10WedFORCAST to LN2 o 2/11ThuFORCAST to LHe o 2/12FriFull cold soaked, working nominally o 4/07WedStart of mini line-ops o 4/23FriTA Characterization/First Light Flight

Most Procedures in Place Signed off o Vacuum and Leak Check o Warm Test o Cold Test o CWR Installation o PI Rack Installation o On-Aircraft Cryogen Fill o CWR Removal Not yet signed o Safe to Mate o In-flight access Operational o Mini line-ops plan o First light plan o Line ops plan 19-Feb-103 Airworthiness document signed off as well.

Photos: Loading for Shipment 19-Feb-104

Photos: In DAOF lab 19-Feb-105 Calibration box Electronics Pump out Cooling down

Lessoned Learned In general, everything has gone rather well Chris has done a great job in outfitting the lab o Tools, pumps, etc o But check your H/W and tools: do you have specialty items? o No H/W stock room (nuts, bolts, etc) No real problems with Safety and QA o Mainly in observational mode, updating procedures o Remember safety shoes o You can’t roll crane under load o Make sure you load certify your cart! Operational issue o Access to instrument/lab requires planning o Must have 2 team members + 1 USRA person present 19-Feb-106

Optimizing FORCAST Tweaks to optimize signal-to-noise ratio  Bias: Can increase  G (good) and  G (bad) o Chop frequency:Influences1/f noise contributions o Frame rate:Affects read noise contribution o Mux gain: Affects read noise contribution (high/low capacitance – low cap best) Optimization depends upon background photon flux   G is both bias and background dependent 19-Feb-107 S src = source photon rate S bck = background (ph/sec/pix) t 1 = 1/ (frame rate) n pix = source area (in pixels) RN = read noise S/N = signal-to-noise (one read)

Fore Optics Simulate on-sky (faint) source o Chop and “Nod”  Set and regulate source  T (e.g.  T = 2 K) Checks system with “real” source o Warm & cold throughput 19-Feb-108

9 Optimizing Bias Upper left: S/N vs. bias for LWC low capacitance (low background) mode o 30 micron + neutral density filter Upper right: S/N vs. bias for LWC in high capacitance (high background) mode o 38 micron filter Lower left: S/N vs. well depth for LWC hi-cap mode sigLevel in DN 6800 < sigLevel < 10700

19-Feb-1010 Cornell Non-DAOF activities Prep for new LWC detector (GFY10-11) o New fan-out board o New detector cabling o Modify test dewar for array checkout o FPGA and S/W mods for running array Documentation updates/generation (GFY10-11) o Based on DAOF and flight results Installation and testing of LWC array (GFY11) o Different multiplexor (and size) from current array Response to issues arising from first light flights (GFY10-11) o Update FORCAST operations S/W o Update data acquisition procedures o Update data reduction pipeline o Miscellaneous hardware updates due to unforeseen issues?

Final Comments We’re ready to go Plan to keep FORCAST cold for next two weeks o Further parameter optimization o Occasional “funnies” we want to track down o Testing of IMC o Fine tuning (setting of parameters, quick look FORCAST communications, etc.) Back at Cornell o Will look into digital bias control 19-Feb-1011