OLD DOMINION ASV TEAM Co-Captain Chris Shertzer Co-Captain Benjamin McKinley Adam Stofko Richard Blanchette Brittany Garman Ganesh Balasubramanian Zach Carpenter
HULL DEVELOPMENT Aluminum frame and demi-hull pontoon system Aluminum frame and demi-hull pontoon system Hydrostatic analysis completed. Hydrostatic analysis completed. Product drawings have been completed and submitted for fabrication. Product drawings have been completed and submitted for fabrication.
PROPULSION A Kort nozzle has been designed and tested using Solid Works A Kort nozzle has been designed and tested using Solid Works After approval has been given, 3D printing will begin After approval has been given, 3D printing will begin
OBSTACLE AVOIDANCE Code has been written Code has been written Waiting for test apparatus to begin debugging Waiting for test apparatus to begin debugging
AUTOMATED DOCKING Code is ready for testing Integration into the main code is being discussed Challenge Station layout
ACOUSTIC BEACON POSITIONING A device has been developed A device has been developed Testing is underway Testing is underway 3D Rhino model (McNeel North America, Seattle, WA)
UNDERWATER LIGHT IDENTIFICATION A test device has been built A test device has been built Awaiting light arrival Awaiting light arrival
GANTT CHART