October 2006 Andrea Gaddi, Physics Dept. CMS Infrastructures Issues.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
André Augustinus 16 June 2003 DCS Workshop Safety.
Environmental Conditions in the LHC Experimental Caverns JCOV Thursday 18 th March.
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
September 18, 2009 Critical Facilities Round Table 1 Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
DSS Advisory Board Christoph Schäfer Rack Safety System.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CRYOGENICS AND POWERING
TS/CV/DC CFD Team Computational Fluid Dynamics at CERN Michele Battistin CERN, Geneva - Switzerland.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Electrical and Optical Cables Installation at P5 What When How H. Breuker
André Augustinus 16 September 2002 Safety issues.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Associated detection/extinction systems D. Swoboda.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Cooling System Solutions
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Magnet Infrastructures and Cavern Layout CLIC Detector WG5, April 1st 2010 Andrea Gaddi Physics Dept. - CERN.
TE-CRG Activities D. Delikaris, TE-CRG.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Andrea Gaddi, CERN Physics Dept. CMS-ILD Engineering Workshop 2009 Coil Ancillaries & Detector General Services.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Cryogenic behavior of the cryogenic system
Part II: Integrated Design of Infrastructures
COOLING & VENTILATION INFRASTRUCTURE
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Business opportunities related to CERN electrical network
An integrated design for ILC detectors services
TEC assembly and commissioning at Lyon
as a prototype for Super c-tau factory
Cryogenic behavior of the magnet
Quench calculations of the CBM magnet
Presentation transcript:

October 2006 Andrea Gaddi, Physics Dept. CMS Infrastructures Issues

October 2006 Andrea Gaddi, Physics Dept. Basic Detector Infrastructures Powering Cooling Cabling Safety issues Access facilities Definition of is wide, ranging from very basic services to more detector specific systems. We give here some highlights on design guidelines and main parameters of CMS Infrastructures, focusing in particular on:

October 2006 Andrea Gaddi, Physics Dept. Detector Powering Different power utilities:  Power to Front End Electronics (FEE)  Power to Counting Rooms and Site Control Centres  Power to auxiliaries & services Different power sources:  Uninterruptible Power (battery back-up)  Secured Power (diesel-generator back-up)  Non-secured Power

October 2006 Andrea Gaddi, Physics Dept. Power distribution at P5

October 2006 Andrea Gaddi, Physics Dept. How much power SystemInstalled power (kVA)Rated power (kW) General serviceson site5,2502,200 Electronics racks4,0002,300 LV to FEE2,0001,000 Magnet + Cryogenics3, (1,250)* Ventilation stations (inc. smoke extraction)5,8501,250 (3,000)* Surface cooling stations6,5004,000 Underground cooling stations:2,000 (water)600 (C6F14)600 (900)* Total28,90012,750 (15,250)* (*) refers to transient operations (cooling down, powering up, etc.)

October 2006 Andrea Gaddi, Physics Dept. Low Voltage Power Schematics of LV distribution Courtesy S. Lusin

October 2006 Andrea Gaddi, Physics Dept. Power Losses Courtesy S. Lusin Consider a factor 2 wrt final end user to design transformers and power lines

October 2006 Andrea Gaddi, Physics Dept. Detector Cooling Front End Electronics Cooling Electronics Racks Cooling Caverns Ventilation Cryogenics

October 2006 Andrea Gaddi, Physics Dept. FEE Cooling at CMS More than 1 MWatt is dissipated into heat by CMS Front Electronics boards. This large amount of heat needs to be transferred away from the Detector via appropriate cooling fluids (water or CxFy, depending on working temperature). CMS has 6 independents cooling loops, serving the following systems: Muon Endcapswater16 deg100 kWth Muon Barrelwater16 deg50 kWth HCal + Yoke Barrelwater16 deg60 kWth ECalwater16 deg300 kWth Racks systemwater16 deg1600 kWth Tracker, Pixels, ESC6F14-15/-30 deg150 kWth

October 2006 Andrea Gaddi, Physics Dept. Cooling Infrastructures Chilled water at 6 deg is produced on surface and dispatched to the different cooling stations present on site (above and below ground) that finally produce water at 16 deg for the different cooling loops. This arrangement has made possible to test a significant part of CMS on surface, before lowering the Detector down into the cavern without having s large impact on infrastructure costs.

October 2006 Andrea Gaddi, Physics Dept. Racks Cooling Turbine unit Heat exchanger(s) Air-deflector Water manifold Electronics crate Axial fans Vertical air-flow Up to 8 kW per rack Integrated smoke detection Integrated fire-quenching

October 2006 Andrea Gaddi, Physics Dept. rack mounted PCs air-to-water heat-exchanger fans Horizontal air-flow PC Racks Cooling Up to 10 kW per rack (40 PCs)

October 2006 Andrea Gaddi, Physics Dept. Caverns Ventilation Humidity and temperature controls: keep dew point as lower as possible

October 2006 Andrea Gaddi, Physics Dept. Cryogenics The cryogenic plant at CMS site has the function to cool down and keep at 4,7 K the 230 tons of the CMS Superconducting Coil. The refrigerator system can deliver a cooling power of 800 W at 4,7 K, plus 4500 W at 60 K to cool the Coil thermal screens and in addition to that 4 g/sec of L-He to cool the 20 kA Coil Current Leads. Cooling the Coil down from ambient temperature takes 3 weeks, with a maximum thermal gradient inside the cold mass of 15 deg. In case of quench, the temperature rises up to 70 K and 3 days are necessary to bring the cold mass down to 4,7 K A 6,000 lt L-He storage tank sits close to the cold mass to allow a slow-discharge from full current without warming up the coil.

October 2006 Andrea Gaddi, Physics Dept. Coil cooling down 300 K 25 Feb Feb K

October 2006 Andrea Gaddi, Physics Dept. Detector Cabling Cabling an LHC detector is one of the most time consuming and challenging tasks. As cables come rather late in the construction process, little or no contingency is given to perform this task. CMS, due to its particular modularity, can be cabled by slices, making the process more flexible and repetitive. We have some 20,000 cables on the detector itself, with an average length of 15 meters. In addition, there are some 4,000 cables that connect the detector to the adjacent Counting rooms (average length 90 meters). Think big! Full-high false floor (1,80 m) below counting rooms and large cable-chains, make the cabling work a bit less painful than usual.

October 2006 Andrea Gaddi, Physics Dept. On-Detector Cabling Courtesy G. Faber Cable trays over the Coil cryostat on YB0

October 2006 Andrea Gaddi, Physics Dept. Off-Detector Cabling YE+1 and YB+2 chains under cabling

October 2006 Andrea Gaddi, Physics Dept. Cabling costs A few installation activities have their cost related to how your work is well organized as cabling. Manage cabling teams in terms of number of people on site, working on shift, requires perspective view. CMS has chosen to have teams coming from Institutions (Russia and China) namely for on-detector cables and place industrial contract with local cabling companies for off-detector cables. On this basis we have reached good results, keeping costs at a reasonable level. The predicted cost for Institution cabling was 2,3 CHF/meter and the actual one is 2,6 CHF/meter The cost for cabling made by local companies ranges from 3 to 3,3 CHF/meter. Total estimated cost is about 1,7 MCHF (equivalent to 300 men/month). Cabling cost is charged to sub-detectors according to the actual length of cables pulled.

October 2006 Andrea Gaddi, Physics Dept. Cabling organization

October 2006 Andrea Gaddi, Physics Dept. Safety Major danger for any experiment is fire o Fire prevention (rules & standards, gas inertion) o Fire detection (sniffers & gas analyzers, smoke-detectors) o Fire fighting (low pressure water, high pressure water, foam) The power density of LHC experiments is much larger than any other before: 2,6 GJ stored inside the Magnet 1 MW of FEE Low Voltage Power 10 kW per rack (…) CMS has been designed since the beginning with a great attention to prevent fire Being the result of a fire inside the experimental cavern potentially disastrous, we have tried to limit the overall risk keeping this possibility as low as possible.

October 2006 Andrea Gaddi, Physics Dept. Safety guidelines Fire prevention: -- IS23 & IS41 Standards (Materials, Fire resistance, Smoke release) -- permanent N2 inertion inside vacuum tank and inner detectors Tracker, ECAL, HCAL -- all heat sources including front end electronics are intercepted by water, -- all detectors and their services (cables trays) must be neutral thermally with respect to their neighbors. Fire detection: -- smoke detection in counting rooms and cable labyrinths (sniffers) -- smoke detection in detectors cuts electrical power to concerned racks and power supplies through DSS and its flexible action matrix -- smoke detection in racks with electrical cuts through DSS and local fire suppression for valuable electronics Fire fighting: -- N2 flushing of muon chamber gaps in case of smoke detection -- passive foam system in case of loss control of a fire in the cavern -- low pressure water sprinklers in cable trays -- high pressure water sprayer to quench fire in PC racks and control rooms

October 2006 Andrea Gaddi, Physics Dept. Foam test The UXC55 cavern has been filled with hundreds of cubic meters of foam, blown out of the 8 nozzles located at cavern ceiling.

October 2006 Andrea Gaddi, Physics Dept. Detector Safety System The Detector Safety System is a PLC (Siemens) based supervisor that gets alarms from its own sensors placed in every sensitive location. It has built inside an alarm/action matrix, that can be adapted to the evolution of the hardware to be protected and/or the level of risk. Actions are taken with a time delay ranging from a few seconds to some minutes, depending on the severity of the risk. All its connections are hardwired and it has a built-in UPS to assure power anytime. It exchanges data with the detector slow control and has a back end interface that allows the user to visualize the status of all the sensitive parts.

October 2006 Andrea Gaddi, Physics Dept. Rack Safety System Control touch screen to power racks on/off

October 2006 Andrea Gaddi, Physics Dept. Access Facilities Scaffolding For long term planned works. They assure easy and safe access at high. Personnel Access Platforms The more versatile access mean. Battery powered, can work in surface and underground areas. CMS has 6 PAC for installation and maintenance porpoises.

October 2006 Andrea Gaddi, Physics Dept. Conclusions Detector Infrastructures shall profit at a maximum of what already exists on the market. We have found on industrial systems solutions to most of our needs. Our goal was to adapt them to the complex needs of a high energy physics detector, rather than start from scratch with new solutions, that could seem more convenient, but they often lack in reliability. In short terms, do no reinvent the wheel!